TRAINING MODULE 1. Legislative Requirement to Establish and Commission a Thermal Power Plant. 2. Different types of Thermal Power Generators.

3. Process of a Typical Coal fired Thermal Power Station ( the plant you have visited). Coal Handling Plants (Coal Requirement, type of coal used), Stock Yards, water treatment plant (DMP), Turbines, ESPs, ESP Maintenance, Control Systems, ID Fan, Ash Handling System, Ash Transportation System, ash pond, ash pond capacity, risk assessment of the power plant. 4. Land Requirement and the Impact of Thermal Power Plant on Land Environment. Agriculture Land: Forests land and Density of vegetation other (specify): Land use in the Catchments /within10 kms radius of the proposal site: Topography of the area indicating gradients, aspects and altitude. Erodibility classification of the proposed land. Impacts on Coal Transportation Routes. Distance of the nearest National Park/Sanctuary/Biosphere Reserve/Mountains/heritage site/ Reserve Forests. Pollution sources existing in 10 km radius and their impact on quality of air, water and land. Rehabilitation plan for quarries /borrow areas: Green belt plan: Compensatory afforestation plan. Ash Ponds stabilization. 5. Air Pollution Impact, Control & Monitoring i) Role of Climate and Air Quality and the Impact of Power Plants (a) Windrose at site: (b) Max/Min/Mean annual temperature: (c) Frequency of inversion: (d) Frequency of cyclones/tornadoes/c loud burst: (e) Ambient air quality data: (f) Nature and concentration of emission of SPM, Gas (CO, CO2, NO2, CHn etc. from the project. ii) Stack Monitoring. iii) Air Pollution Control Equipments ESP designs, efficiency and specifications. 6. Water Pollution and its Impact. i) Water Requirement of the Power Plant. ii) Water balance

(a) Water balance at site (b) Lean season water availability iii) Water Requirement iv) Source to be tapped with competing users (River, Lake, Ground, Public Supply) v) Water quality vi) Changes observed in quality and quantity of ground water in the last 15 years and present charging and extraction details. vii) Quantum of waste water to be release with treatment details viii) Quantum of quality of water in the receiving body before and after disposal of solid wastes. ix) Quantum of waste-water to be released on land and type of land (x) (i) Details of reservoir water quality with necessary Catchment Treatment Plan. (xi) Command Area Development Plan. 7. Solid Waste: (a) Nature and quantity of solid wastes generated (b) Solid waste disposal method 8. Noise and Vibrations (a) Sources of Noise and Vibrations (b) Ambient noise level: (c) Noise and Vibration control measures proposed: 9. Peak labour force to be deployed giving details of Occupational Health Hazards: Endemic health problems in the area due to waste water/air/soil borne diseases: Health care system existing and proposed Risk Assessment Report and Disaster Management 10. Environment Impact Assessment (REPORT), Environmental Statement 11. Environment Management Plan 12. Details of Environmental Management Cell 13. ISO 14001 & OSHAS 18001 for Power Plants

Das könnte Ihnen auch gefallen