Summary: Construction of one half of 6 lane arterial, bridge costs, and right-of-way acquisition related to extending Tower Road from 6th Avenue to Colfax. This will benefit Buckley AFB and make a direct connection from I-70 to the main base entrance.
Summary: 1. Install enhanced and high visibility pedestrian crossing markings, including signs, in-ground lights, colored concrete paving, or special pavers; 2. Provide a raised or textured crosswalk between right turn pork chop islands and the sidewalk at right turn location of northeast corner of Peoria Street and Colfax Avenue; 3. Install directional curb ramps on Intersections of Colfax Ave/Peoria St and Colfax Ave/Fitzsimons Pkwy. 5 Colfax/Peoria Intersection Operational Improvement Summary: Add dual left turn lanes for WB and NB movements at Colfax Ave/Peoria St intersection. $ 558,000
Summary: Construct enhanced sidewalks, bike lanes and street medians and pedestrian crossings throughout the two mile segment of Montview Blvd. 8 Montview Blvd Improvements - Peoria to Fitzsimons Pkwy $ 1,500,000
Summary: Funds would be used to address a portion of an $11.0 million project that would improve Montview Boulevard between Fitzsimons Parkway and Peoria Street. There may be oppurtunities for funds from campus partners, Fitzsimons Redevelopment Authority (FRA) and the metro district as well.
Access to SE Aurora
9 Arapahoe Rd - Waco to Himalaya $ 1,561,000 Summary: Improvements proposed by the City of Centennial to Arapahoe Road. Access Improvements into SE Aurora via Arapahoe Road. This cost assumed a 20 percent City match, with the remainder covered by Centennial and/or Arapahoe County. 10 Gun Club Rd Widening - Quincy Ave to Aurora Parkway $ 5,733,000
Summary: Widen approximately 1-1/2 miles of Gun Club Road from a 2-lane roadway to a 4-lane collector from Quincy Avenue south to where it turns into Aurora Parkway. Cost assumes 100% city, although there is the potential for a cost sharing joint agreement for this project with Arapahoe County.
Access to SE Aurora
11 Quincy Ave Intersection @ E470 and Gun Club Road $ 9,793,000 Summary: Construct new intersection @ E-470 and Quincy as area growth warrants traffic system improvement. This cost assumed a 50 percent match, as there is the potential for a cost sharing joint agreement for this project with Arapahoe County.
Summary: Construct a free right turn lane and 1000 lf of acceleration lane on Northbound Parker Road from Quincy Avenue. Improvements include new travel lane, vertical curb, sidewalk, new entrace to shopping mall and dry utility relocations.
Summary: Provide city-standard bus pull out on NB Havana, just north of 11th Avenue. This will allow the buses to pull out of the north-bound travel lane, allowing other traffic to continue. 18 56th Avenue Access Improvement at Ireland Street Summary: Roadway improvements on a two lane rural road on 56th Avenue at Ireland Street. 19 Alameda Avenue Additional Lane at I-225 $ 1,285,000 $ 1,400,000
Summary: Add additional left turn lane from Alameda Avenue to SB I-225. Add dedicated right thru lane from I-225 to mall entrance. 20 City Wide Bike/Ped Connections Summary: This would fund various bike/ped connections throughout the city. $ 558,000