Sie sind auf Seite 1von 47

C nd ot B e w l [] o A

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan: Areas shown On this drawing


2 3

Sheet 1

Sheet 32

Sheet 29 Sheet 26 Sheet 2 Sheet 4 Sheet 25 Sheet 31 Sheet 5 Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Sheet 3

Sheet 23

Sheet 22 These Land acquisition plan sheet numbers follow the Works plans sheet numbers. Land acquisition plan sheet numbers not used : 9, 11, 12, 18, 21, 24, 27, 28, 30, 34, 50, 58 an 59

Sheet 6

Sheet 7

Sheet 20

Sheet 19 Sheet 8 (Insert) Sheet 17 Sheet 8 Sheet 14

Sheet 10

Sheet 13

Sheet 16

Sheet 55 Sheet 54

Sheet 15

Sheet 53

Sheet 56 Sheet 52 Sheet 57 Sheet 51

Sheet 49 Co t [ n B] d Co t [ n B] d Sheet 35 Sheet 36 Sheet 37 Sheet 48

1000m

1000m

Sheet 38 Sheet 33 Sheet 39


C nd b v [] o t A oe A

Scale 1:20000 at A1 1:40000 if reproduced at A3

Sheet 40

FOR INFORMATION

Sheet 41 Location

Project wide
Sheet 42

Document Information Sheet 43

Section 48 publicity Land acquisition plans


Sheet 44

Sheet location Book of plans - section 2


Sheet 45 S48-LA-000-XXXXX-000001 July 2012

Sheet 46

Sheet 47

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Mac thi le S n : h e 2 e t

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

E l my R n o a d

Wa rl p e Wa y

Limits of permanent works for Work Nos. 2a & 2b

Limits of deviation for Work No. 1a

Land to be permanently acquired


(subsoil only)

Limits of land to be acquired or used for Work Nos. 2a & 2b

Centreline of Work No. 1a

Ca n h a m

Ro a d

Acton Storm Tanks

o o d s t o c k R o a d

Ai e b gr n Ra od

S ou t hf i el d

he l l oc k

Mac thi le n : Sh e e t 2

oa d

r ee ne nd

oa d

oa d

a o d g yR Ru b

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 1 Book of plans - section 2
S48-LA-000-XXXXX-000002 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)

Pe d l v n e l e A eu y l

Works centreline

Land to be permanently acquired


S. t e Pt es rS qa ur e
(subsoil only)

Bi ri th s Go rv e
Ro a d Ch s iwi c k Hi h g

s n rb n G re Pe e d ad
Limits of deviation for Work No. 1a

Centreline of Work No. 1a

N t rv e ea o h n od Ra

e od o sa L nd lR a

Fl a d n e r R s

Ce le vl ad n A vn eu e

M r et o A n v eu ne

Ard i a e lA e vn eu e

M a c l e Sh e 3 thi : e t n

e 1 e t n Sh l : thie Mac

n a s oo g R a G i b ru h o d
o d a

a t Ba h Ro d

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 2 Book of plans - section 2
S48-LA-000-XXXXX-000003 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

S t . P e t e r s

Tunnel limits of deviation (LOD)


Works centreline

S q u a r e

Land to be permanently acquired


(subsoil only)

M 4 t e e h S : e n i l h c t a

t er r ac e

Ri v e rT h a me s

er s m

i t h

at c hl i ne :S he et 2

Gr e a t We s R t o a d

g m n i m r o r e t dC a r o W f h s s e A m o a t h s T g re n n i t s Ba i x i E an m

n o

am

Limits of deviation for Work No. 1a

Centreline of Work No. 1a

Ch iw s i c kM

A i r e d a l e A v e n u e

al l

Playing fields

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 3 Book of plans - section 2
S48-LA-000-XXXXX-000004 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

R i v e r T h a m e s

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Br g i e d

Limits of deviation for Work No. 3b Limits of land to be acquired or used (LLAU)
Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Ha m

me s rmi t h

Land to be permanently acquired Limits of deviation for Work No. 1a


g n i n r e m tr o o Wa r C d s me s f ho a h A t gT s o n i t s i re x an E nB i ma
(subsoil only)

Centreline of Work No. 1a

G a r d e n s

St. Pauls School

a od nR i l ia Ll

C l a v e r i n g A v e n u e

a od eR a dl os Ln

Ca t sen la u

a od mR a nh et l G

A r u n d e l T e r r a c e
M e r t h y r T e r r a c e

Ma th c l ie n : Sh e e t 5

R i v e r v i e w

sR d la Hi . St

3 t e e Sh : n i le c th Ma

a o d

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 4 Book of plans - section 2
S48-LA-000-XXXXX-000005 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Limits of deviation for Work No. 1a


S Jm ta e s te Sr t e

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD)

Centreline of Work No. 1a Land not to be acquired, highway to be retained


Rie v rT h me a s

Limits of land to be acquired or used for Work Nos. 3a & 3c

Works centreline Limits of permanent works (land to be permanently acquired)

Limits of permanent works for Work Nos. 3a & 3c

Land to be permanently acquired


(subsoil only)

Ar n e Te r c u d l ra e

Limits of land to be acquired or used for Work No. 3c Limits of deviation for Work No. 3b

Rie ve Ga d n v r iw re s

Cl v r g Av n e a ei n e u

Di si tl lr ey R

Hammersmith Pumping Station

l e n u tn tr ae w l ly ae eV e L s e m a h gT t sn ii x E

o d a

r e i v

Or l i D e

Wi l no s wR od a

Fu la h m

Pa lc a e

Ro a d

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

Centreline of Work No. 1a

FOR INFORMATION
Limits of deviation for Work No. 1a

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Hammersmith connection tunnel sheet 5 Book of plans - section 2
S48-LA-000-XXXXX-000006 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

h wt li Co

gH n Ki s R ny e r a h e c

a od e l l R ni a v R i

Tunnel limits of deviation (LOD)


Works centreline

d a Ro

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 1a

Centreline of Work No. 1a

Limits of deviation for Work No. 3b

River Thames
Mac thi le S n : h e 7 e t

E x r i a s w t i n w g a Th t e r a t me u n n sL e l e e

V a l l e y

Limits of deviation for Work No. 1a

Centreline of Work No. 1a

M 4 et he :S ne i hl c at
10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3 100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 6 Book of plans - section 2
S48-LA-000-XXXXX-000007 July 2012

c Thames Water Utilities Ltd 2008

od Ra an d w ol Wo
t e r te l lS we s e Gr

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

t re te nS o y n Ke
l e nt Et r i W a k

This drawing

a od g R ae vn t e Se

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

o e er wb ry Cl s Ro

t tC s o l lh Mi o e ls

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

0 1 t e e Sh : n ie l c th Ma

s e a m a Co P l ed l e

Land to be permanently acquired


(subsoil only)

s me a h T r e i Rv
Limits of deviation for Work No. 1a

Centreline of Work No. 1a

Mac thi le S n : h e 6 e t

Limits of land to be acquired or used for Work Nos. 4a & 4c

Limits of permanent works for Work Nos. 4a & 4c

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide
M t le S e t a hn : h e 8 ci

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 7 Book of plans - section 2
S48-LA-000-XXXXX-000008 July 2012

c Thames Water Utilities Ltd 2008

Limits of deviation for Work No. 1a

Centreline of Work No. 1a

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Rv i eT rh a me s

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
M a th c l ie n : S h e e t 7
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired) Limits of permanent access

Limits of permanent works for Work Nos. 4a & 4c

Limits of land to be acquired or used for Work Nos. 4a & 4c Limits of deviation for Work No. 4b

(permanent rights of access required) Land to be permanently acquired (subsoil only)

Barn Elms
Ri hi h gh c m pr on es d s o ur t F e ga ul a h sp m ie p l ie n
k o o r B y e l r e y v a e W B e m o H

Barn Elms schools playing fields

Limits of permanent access for Work No. 4c

Limits of land to be acquired or used for Work No. 4c

S e f t o n

Ro a d

Ch u rh c

10m 0
S t r e e t

100m Scale 1:1250 at A1 1:2500 if reproduced at A3

u na el t as
m El

Rc ok s a Ln e

FOR INFORMATION

e ov Gr ad Ro

Location

Project wide London


Document Information

Section 48 publicity Land acquisition plan Barn Elms site sheet 8 Book of plans - section 2
S48-LA-000-XXXXX-000009 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD)

Limits of deviation for Work No. 1a

Ri c h hg m o ih n p e dt oF rs s la u e uh r m g a sp ie p l ie n

Bishops Park

Works centreline Limits of permanent works (land to be permanently acquired)

Centreline of Work No. 1a

Land to be permanently acquired


(subsoil only)

n thi : e t 3 M a c l e Sh e 1

Limits of deviation for Work No. 1a

Mac thi le n : Sh e t e 7

Rv r h i Ta e m s e

Centreline of Work No. 1a

Limits of deviation for Work No. 5b

Limits of land to be acquired or used for Work Nos. 4a & 4c

Limits of permanent works for Work Nos. 4a & 4c

E bn m ak m n et

Putney Embankment Temporary Slipway


Limits of land to be acquired or used for Work No. 5c
o a d

Limits of deviation for Work No. 4b

Ro te h r wo o dR

a od d n R h o c im eR wr o L

d a n s i Ro Fe t g

Barn Elms

s n re ad G y n g i v u R

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 10 Book of plans - section 2
S48-LA-000-XXXXX-000010 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired


Pu n y t e Br ig d e
(subsoil only)

g d e l i iBr y Ra te Pu n

Limits of deviation for Work No. 1a

Limits of deviation for Work No. 1a

Centreline of Work No. 1a

Centreline of Work No. 1a

4 e 1 e t Sh n : ie c l th Ma

Putney Embankment

Foreshore

s e i Ta e Rv r h m

Limits of deviation for work No. 5b

Ma th c l ie n : Sh e t e 1 0

Limits of land to be acquired or used for work No. 5a & 5c Limits of permanent works for work No. 5a & 5c

Lw r o e Rc im n h od Ra od

Land not to be acquired, highway to be retained

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 13 Book of plans - section 2
S48-LA-000-XXXXX-000011 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Land not to be acquired, highway to be retained

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Limits of land to be acquired or used for Work Nos. 6a & 6b
Order limits

Limits of land to be acquired or used (LLAU) Limits of permanent works for Work Nos. 6a & 6b
Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Mac thi le n : Sh e t e 1 3

C rw t R an a h od a

Carnwath Road Riverside


P t fa h e on W a ri r f

7 1 t e e Sh : n ie l c th Ma

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 1a Centreline of Work No. 1a

M t le S e a hn : h e ci t6 1

Rv ir eT hm a e s

Limits of deviation for Work No. 7

Wa ns dw ot r hP ak r

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 14 Book of plans - section 2
S48-LA-000-XXXXX-000012 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

ih g St re e t

Limits of deviation for Work No. 7

Wa n s d w ot rh H

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

m g o Fr
e r o

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Limits of permanent works for Work Nos. 9a & 9b Limits of land to be acquired or used for Work Nos. 9a & 9b

B u c k h o l d

m Ar yR r ou

R o a d

d oa

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 7

King Georges Park

Dormay Street
Limits of land to be acquired or used for Work No. 9b

6 e 1 e t Sh n : ie c l th Ma

Rv r i W e ad nl e

Proposed National Grid cable tunnel Wimbledon to Kensal


Limits of land to be acquired or used for Work Nos. 8a & 8b Limits of permanent works for Work Nos. 8a & 8b

Existing UKPN cable tunnel Wimbledon to Pimlico

Land not to be acquired or used

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Frogmore connection tunnel sheet 15 Book of plans - section 2
S48-LA-000-XXXXX-000013 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Ca n r wa h Ro d t a

Fr o g mo r e

Limits of permanent works for Work Nos. 8a & 8b Limits of land to be acquired or used for Work Nos. 8a & 8b

N
m s a e Th v r Rie
lw do u S d a o R

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Dormay Street

e r mo g o Fr
Limits of deviation for Work No. 7 Land not to be acquired or used
n : ie c l th Ma t 5 e 1 e Sh

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Limits of deviation for Work No. 1a


M a c l e Sh e 1 thi : e t 4 n

Centreline of Work No. 1a

Land to be permanently acquired


(subsoil only)

Carnwath Road

Riverside

Land not to be acquired, highway to be retained Limits of permanent works for Work Nos. 6a & 6b
Po rp sd tn o e u n eW N t ao l n ib i a m l G l e r d d o nt i c a oK b l e e na sl

Limits of land to be acquired or used for Work Nos. 6a & 6b

M a c l e Sh e thi : e t 7 n 1

e l d n Wa r e i Rv

Limits of deviation for Work No. 1b

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

Centreline of Work No. 1b

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Frogmore connection tunnel sheet 16 Book of plans - section 2
S48-LA-000-XXXXX-000014 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

e l b a dc l i r a G s l n a e n K o i t o a nt dN e o d e l s o mb i rp Po e W l n u tn

Key:
Order limits

m Dy

hR g ru oo eb tr Pe d a o

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline

t re te c S o k

Centreline of Work No. 1a

Limits of permanent works for Work No. 6b Limits of land to be acquired or used for Work No. 6b

Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 1a Land not to be acquired, highway to be retrained

4 1 e t Sh e n : le thi Mac

od R a ah w t an C r

9 e 1 e t Sh n : ie c l th Ma

Carnwath Road Riverside


Ma t cl hn i eS : he et 1 6

Limits of deviation for Work No. 1b

Centreline of Work No. 1b

d e ig Br rh ot d w n s Wa

Limits of permanent works for Work Nos. 6a & 6b

s a e hm eT ir Rv

Limits of deviation for Work No. 7

Limits of land to be acquired or used for Work Nos. 6a & 6b

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 17 Book of plans - section 2
S48-LA-000-XXXXX-000015 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
y i i l l m or Wa Wia M rs

at c hl i ne :S he et 17

Ga t n W ro s

Yo k P r l a e c

a y

oa d

P l ou gh

Keyplan:

M 20 et he :S ne i hl c at
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Limits of deviation for Work No. 1b

Key:
Order limits

s a e hm eT ir Rv

Centreline of Work No. 1b

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline

Limits of deviation for Work No. 1b

Centreline of Work No. 1b

Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 10b


a od R ad br o Lm

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

U P cb t K N al u e ne nl Wi b d n o m l o tP e i lo mi c

York Road
Limits of land to be acquired or used for Work Nos. 10a & 10c Limits of permanent works for Work Nos. 10a & 10c

FOR INFORMATION

Location

Project wide

Falconbrook Pumping Station

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 19 Book of plans - section 2
S48-LA-000-XXXXX-000016 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Th m e Av n e a s e u

Ad i l u r m r Sq a e a

al iB r ig d e

Ba t tr es e aR

Ma th c l ie n : Sh e e t 2 2

Keyplan:

This drawing

Limits of land to be acquired or used for Work Nos. 11a & 11c

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Limits of permanent access for Work No. 11c Limits of permanent works for Work Nos. 11a & 11c

L o t s

R o a d

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired) Limits of permanent access

Cremorne Wharf Depot

(permanent rights of access required) Land to be permanently acquired (subsoil only)

Limits of deviation for Work No. 11b

9 e 1 S e t n : h thie Mac l

Limits of deviation for Work No. 1b

Centreline of Work No. 1b Lots Road generation station tunnels

Rv ir eT hm a e s

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 20 Book of plans - section 2
S48-LA-000-XXXXX-000017 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)

Ce hl sa e E m a bn k e m n t

C e hy n eW a l k

Works centreline

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 11b

Ma th c l ie n : Sh e t e 2 3

d i e e t s a Ba t r e Br g

Limits of deviation for Work No. 1b

Centreline of Work No. 1b

Rv i r eT hm a e s

M 20 et he :S ne i hl c at

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 22 Book of plans - section 2
S48-LA-000-XXXXX-000018 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

d n re s e n Ch y e Ga
k l h ye C e n Wa

Key:
Order limits

Tunnel limits of deviation (LOD)


Works centreline

s n e d r a G t n e m k n a b m E

Land to be permanently acquired


(subsoil only)

C e e E b nm n hl a m ak et s

n thi : e t 5 M a c l e Sh e 2

n thi : e t 2 M a c l e Sh e 2

Limits of deviation for Work No. 1b


e i Ta e Rv r h m s
d e b r Br g Al e t i

Centreline of Work No. 1b

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 23 Book of plans - section 2
S48-LA-000-XXXXX-000019 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Limits of permanent works for Work Nos. 12a & 12c

Land to be acquired for permanent subsurface works, highway to be retained

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Limits of land to be acquired or used for Work Nos. 12a & 12c

Key:
Order limits

Land not to be acquired, highway to be retained


t en m nk ba ns m de E ar G

e sa n hl et C e nm ak mb E
G ov rse nr oR od a

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired


(subsoil only)

Chelsea Embankment Foreshore


Limits of deviation for Work No. 12b

B at t e re s aP c a be o e l w r tn S u a n tt e o l in

Gr s e o v n o Br g r i e d

e i Ta e Rv r h m s

Limits of deviation for Work No. 1b Limits of deviation for Work No. 1b Chelsea to Hackey line - limits of land subject to consultation

Centreline of Work No. 1b

Centreline of Work No. 1b

Ma thi c l n : e S h e e t 2 6

3 e 2 S e t n : h thie Mac l

d i e es a Ch le Br g

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 25 Book of plans - section 2
S48-LA-000-XXXXX-000020 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Limits of deviation for work No. 14b

d oR a nr o rse G ov

Heathwall Pumping Station


t r ih n s a Th m e W a e sp o c u n l e t s a o m i Ba t r e t Pi l o t n e
Ta hm e W s We t C e s r tn a r r e os PS s T .. h tH o et a e l a w m si h a l . n l S k P .

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

: ne i hl c 29 at M eet h s

o r a in we St t e t s a Po Ba t r e n e u n l ic a g t ds h r e

Limits of deviation for Work No. 1c

Key:
Order limits

n ai m l l g Hi i rn o er r w at ar B W o es a t e am s Th ter t Ba

Centreline of Work No. 1c Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Limits of deviation for Work No. 1b

e i Ta e Rv r h m s

c ab l e

Limits of land to be acquired or used for Work Nos. 13a & 13b

Kirtling Street
et r te gs n i t il Kr

t un ne l W

i m

Limits of permanent works for Work Nos. 13a & 13b Limits of permanent access for Work No. 13b

K P N

bl ed on

n i le en hr ot Nr L U dL oe ps r Po

t o

P i m

l i c o

5 2 e t h e n : le S thi Mac

Centreline of Work No. 1b

L a n e

Limits of permanent access

(permanent rights of access required) Land to be permanently acquired (subsoil only)

Land not to be acquired or used Limits of permanent works for Work Nos. 14a & 14c Limits of land to be acquired or used for Work Nos. 14a & 14c

Land not to be acquired, highway to be retained

B c at a t b er l s e e t a u n P n o e w l e r S t a t i o n

i n e
o r ai we St t n e t s a Ba t r e Po a l u n l c be t n e
tn r ti e Sa o t e a es P w B tr a o

E l m

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 26 Book of plans - section 2
S48-LA-000-XXXXX-000021 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
G rs ov e n o r R o a d
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

l io c

Heathwall Pumping Station

Ma th c l ie n : Sh e e t 2 6

d e ig l r lB x a u h Va

Land to be permanently acquired


(subsoil only)

Pi m

UL L

bl ed on

Limits of land to be acquired or used for Work Nos. 14a & 14c

t o

UL L e n a i i l tr co Vi

e n a i i l tr co Vi

t u nn el W

Limits of permanent works for Work Nos. 14a & 14c

i m

1 3 e t Sh e n : le thi Mac

c a b l e

Limits of deviation for Work No. 1c

P K U

River Thames
Centreline of Work No. 1c

Albert Embankment Foreshore

Limits of deviation for Work No. 14b

Land not to be acquired, highway to be retained

Limits of land to be acquired or used for Work Nos. 15a & 15c Limits of permanent works for Work Nos. 15a & 15c

Nn Em L i e ls a e n

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 29 Book of plans - section 2
S48-LA-000-XXXXX-000022 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Vi co tr i l a i n e

Vi co tr i l a i n e

Va u h x a lB l r ig d e

L UL

L UL

Ma th c l ie n : Sh e e t 2 9

N
M la i n l k b

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD)

2 e 3 e t Sh n : ie c l th Ma

Works centreline Limits of permanent works (land to be permanently acquired) Limits of permanent access

Limits of land to be acquired or used for Work Nos. 15a & 15c Limits of permanent works for Work Nos. 15a & 15c Limits of deviation for Work No. 1c

(permanent rights of access required) Land to be permanently acquired (subsoil only)

River Thames
Centreline of Work No. 1c

Limits of deviation for Work No. 15b

Albert Embankment Foreshore

Limits of permanent access for Work No. 15c

t n k e nm m a E b et l r Ab

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 31 Book of plans - section 2
S48-LA-000-XXXXX-000023 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Mac l e: e t 1 thi n Sh e 3

Mac l e: e t 3 thi n Sh e 3

L mb t a e h Br ig d e

Ab l r et E b m a nm k e n t

N
Limits of deviation for Work No. 1c Centreline of Work No. 1c

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)


Works centreline

Land to be permanently acquired


(subsoil only)

d sm n t r i e W e t i s e Br g

Rv r h m s i Ta e e

Lm a b e P t a h l ae c R od a

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 32 Book of plans - section 2
S48-LA-000-XXXXX-000024 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Hu n g ef ro r db r ig d e

No rh te r l n i n e

ar t i ns

LU

L UL

L UL

No rh te r n

S t .M

le i n

Ma th c l ie n : Sh e e t 3 5

B ak er l oo

P O

t un ne l

l i ne

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Victoria Embankment Foreshore


Vc r E b ioi m a t a nm n k et

Key:
Land to be acquired for permanent subsurface works only, highway to be retained
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired


(subsoil only)

Limits of permanent works for Work Nos. 16a & 16c

Centreline of Work No. 1c


3 n thi : e t 2 M a c l e Sh e

Limits of land to be acquired or used for Work Nos. 16a & 16c Limits of deviation for Work No. 16b

Limits of deviation for Work No. 1c

d e ig s m n t rBr W e t ise

L LU

UL L n i le e ie bl u J

ee l i ub J ne i l

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 33 Book of plans - section 2
S48-LA-000-XXXXX-000025 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This Drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits
t n e m k n a b m E a i r t co i V

Limits of land to be acquired or used (LLAU) Tunnel limits of deviation (LOD)


Vc i tr oi aE mb a n k me n t
Ma th c l ie n : Sh e t e 3 6

Limits of permanent works Works centreline (land to be permanently acquired) Land to be permanently acquired (subsoil only)

Centreline of Work No. 1c

Limits of deviation for Work No. 1c


M
W a e l o Br g tr o i e d

33 et he :S ne i hl c at

Rv ir eT hm a e s

Limits of land to be acquired or used for Work Nos. 17a & 17b

H d r f ro ge un ge i rd B

LU L N

LU L N n r he t or

n r he t or ne i l
10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3 100m

ne i l

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 35 Book of plans - section 2
S48-LA-000-XXXXX-000026 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Land not to be acquired, highway to be retained

Land to be acquired for permanent subsurface works, highway to be retained

Land not to be acquired, highway to be retained

Blackfriars Bridge Pier

Key:
s pe T a e U pr hm e t t Sre
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

t a ioi m a k e t Vc r E b n m n

Blackfriars n ep s U d ra s

Ma th c l ie n : Sh e t e 3 7

Land to be permanently acquired


(subsoil only)

d a a kr s i e Bl c fi r Br g

Limits of permanent works for Work Nos. 17a & 17b


i t yl ie n

Limits of land to be acquired or used for Work No. 17b

a n dC

i t yl ie n

Limits of land to be acquired or used for Work Nos. 17a & 17b River Thames

Centreline of Work No. 1c Limits of deviation for Work No. 1c

Wa tr el o o

Wa tr el o o

U K P tn N B u a n n ki e s l d ec a b l e

a n dC

Bl ac G fi PO k r ar t un s t ne o S t l .P au l s

L UL

L UL

5 e 3 e t Sh n : ie c l th Ma

Blackfriars Bridge

Foreshore

Limits of permanent works for Work No. 17b

Centreline of Work No. 1c Limits of deviation for Work No. 1c

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 36 Book of plans - section 2
S48-LA-000-XXXXX-000027 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:

Blackfriars Bridge Pier

Order limits

Tunnel limits of deviation (LOD)


Works centreline

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 1c


n i nl e rh r o te U L LN

Centreline of Work No. 1c


Rv r h m i Ta e e s

M a c l e Sh thi : e t n e 3 6

So t w uh a k r Br g i e d

U P K N Bn ak s i d eC a b l eT u n n e l

e d a ki B ns
k l o eW a w lb Ne G

Be rGa a re s d n

Ca n n St n o r e Ra l e t i Br g i e d

d i e r g u B im l n ln M ie

8 e 3 n thi : e t M a c l e Sh
10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3 100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 37 Book of plans - section 2
S48-LA-000-XXXXX-000028 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)


Works centreline

Land to be permanently acquired


(subsoil only)

Tw r o eM i ni l n l e u m Pe i r
Limits of deviation for Work No. 1c Centre line of Work No. 1c
e i Ta e Rv r h m s

n rh r i UL No t e n l e L

7 e 3 n thi : e t M a c l e Sh

d i e o d n L n o Br g

k l s h Q en T e u e Wa

Te h Q ue en Wa s l k

Mac thie l : n Sh e t 9 e 3
y b r we Su wa To

U L L

UL L e n n i r l te rh No

e n n i r l te rh No

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 38 Book of plans - section 2
S48-LA-000-XXXXX-000029 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
d e ig rBr we To
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired Centreline of Work No. 1c


(subsoil only)

Limits of deviation for Work No. 1c

e g i M a ur re Ste t

s e hm Ta hd Sa

Limits of land to be acquired or used for Work No. 18 Limits of permanent works for Work No. 18

re e r Cu l w Ste t

n a e d wn L r ey o Ho s l

d e i r g rB we To

e t re a o e St L fn

d a Ro

Shad Thames Pumping Station

e r t te rS od nf a s G i

Land to be acquired for permanent subsurface works, highway to be retained

Mac thi le S n : h e e t 4 0

s e a hm r eT i Rv

8 e 3 e t Sh n : ie c l th Ma

y wa ub rS we To

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 39 Book of plans - section 2
S48-LA-000-XXXXX-000030 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

l n e u n et a l ae c b u r e Sq KPN c s l o e U s d e ll o o o t W Pr p o s rs wC Ne

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

at c hl i ne :S he et 39

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline

River Thames

Limits of deviation for Work No. 1d


Limits of permanent works (land to be permanently acquired)

Limits of deviation for Work No. 1c Limits of land to be acquired or used for Work Nos. 19a & 19b

Centreline of Work No. 1d

M 48 et he :S ne i hl c at

Land to be permanently acquired


(subsoil only)

Centreline of Work No. 1c

Limits of permanent works for Work Nos. 19a & 19b

Chambers Wharf

W l Bermondsey a l e W s t

t e e r t S y r e t t o P

G ry er Ch

d l g io r Ma

t re te nS re ad

et Sre b t ao Jc

Ca hm brS es te r t e

ci a hn : h e 4 M t le S e t 1
t e e r t aS mb E

t e e r St

Limits of land to be acquired or used for Work No. 19b

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

Centreline of Work No. 20

Limits of deviation for Work No. 20

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 40 Book of plans - section 2
S48-LA-000-XXXXX-000031 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

Limits of deviation for Work No. 1d Centreline of Work No. 1d

This drawing

Po o e U P c b t n l rp s d K N a l u e e n N wC o s o ec s S u r e rs t W ll e q ae lo

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

n e i u i el e UL J b l L

Key:
Order limits

n e i u i el e UL J b l L

Limits of land to be acquired or used for Work Nos. 19a & 19b Limits of permanent works for Work Nos. 19a & 19b
al l Ea t s

Limits of land to be acquired or used (LLAU)

o s et od Ke n Ra

Ma th c l ie n : S h e e t 4 2

Tunnel limits of deviation (LOD) Works centreline Land to be permanently acquired Land to be permanently acquired (subsoil only)

m o c n r a F

Ma th c l ie n : Sh e e t 4 0

Ri v e rT h a me s

Chambers Wharf

Limits of land to be acquired or used for Work No. 19b

d a ia a J m a c Ro

y lW a o n J h Ro l

d a a tn Tr n o Ro

a o d et l tR Co l

on ds ey

e b t e e r t S

B er m

d a r t s o Sok R
a o d e b t rR We s

Limits of deviation for Work No. 20

S te r et

Centreline of Work No. 20

ha m

be r s

Sc ot tL ig d et tC rs e c e t n

S Jm s R a ta e o d s

Limits of deviation for Work No. 1c Centreline of Work No. 1c 10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3 100m

J m a ac ia R

o d a

d a s o t n R e Cl m e

n o t g n i v e B t e e r t S

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Greenwich connection tunnel sheet 41 Book of plans - section 2
S48-LA-000-XXXXX-000032 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)


Works centreline

kR r Pa r ak tw uh So d a o

Southwark Park
G m o m

d a o R

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 20

e a lc sP r e p ip Sl

Centreline of Work No. 20

mm u Dr

d a o R t t e l l o C

M a c l e Sh thi : e t n e 4 1

d a o R r e t s b e

d a o sR t n e e lm C

Southwark Park

d a o R d r a y n a B

M a c l e Sh e 4 thi : e t 3 n

dR n o
d a o

R k rs o St d a o

l ne e un uar t q e l ab e S c os c ll PN l UK W e o t ed s os s o r op Pr w C Ne

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Greenwich connection tunnel sheet 42 Book of plans - section 2
S48-LA-000-XXXXX-000033 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
P l a c e
L o w e r R o a d
Order limits

o t h f i e l d

Tunnel limits of deviation (LOD)


Works centreline

d a o R G m o m
M a c l e Sh e 4 thi : e t 2 n

Surrey Quays shopping centre

Land to be permanently acquired


(subsoil only)

Re di rf fR o d a

Limits of deviation for Work No. 20 Centreline of Work No. 20

Greenland Dock

y a rW es ot Pr el Da

o r g a nS t r e e t

y a u Q d n a l n e e r G

G d an nl ee r Q y ua

Ro ad

Ma th c l ie n : Sh e t e 4 4

Ha wk so t ne

R e h t i h r e h t o O d l R d a o
L o w e r R o a d

W h g u o l P

y a

10m 0

100m Scale 1:1250 at A1 1:2500 if reproduced at A3

w e eN h i ht r te oh R

d a o R
E v e l y n

S t r e e t

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Greenwich connection tunnel sheet 43 Book of plans - section 2
S48-LA-000-XXXXX-000034 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Greenland Dock
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD)

Limits of permanent works for Work Nos. 21a & 21b


Qu a y

Works centreline Limits of permanent works (land to be permanently acquired)

Yo em a nS te r et

Limits of land to be acquired or used for Work Nos. 21a & 21b Limits of deviation for Work No. 20 Centreline of Work No. 20

Gr e e na ln d

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 20 Centreline of Work No. 20

Gr e e na ln d Qu a y

Land to be acquired for permanent subsurface works, highway to be retained

Pl o u g hW

Ch io l n t G

Cr ot f St re e t

Ra is n b oo ru g A h v n e u e

a y

rv o e

et re y t vl S Ee n

Ox sal e tl s

Earl Pumping Station

Ro d a

Wo oc dr o M f e t w s

at c hl ie n :S he et 45

3 e 4 e t Sh n : ie c l th Ma

10m 0

100m Scale 1:1250 at A1 1:2500 if reproduced at A3

Lw r od o eR a

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Greenwich connection tunnel sheet 44 Book of plans - section 2
S48-LA-000-XXXXX-000035 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

at c hl ie n :S he et 44

Tunnel limits of deviation (LOD)


Works centreline

Dr g o a o n Ro d a

G oe rv S te r t e

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 20

S a y e s

Centreline of Work No. 20

C o u r t S t r e e t

e et y v l Sr Ee n t

Bl c a k o h re s Ro a d

et Sre n t u o t t Sa n

Ste re t

s le i Co ok g D rn

Co t se w r o d o

Av r n l t S eo t re et

et t te o Sr Rl

Ab n ig r e Gr o e v

Et S t te a r e t

P r i n c e
e t 6 h e 4 n : le S thi Mac

S t r e e t
G e v o r t e e r t S

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Greenwich connection tunnel sheet 45 Book of plans - section 2
S48-LA-000-XXXXX-000036 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
D e p t f o r d
d a o kR e e r C
Order limits

W
t re te eS t a g r e t a

Limits of land to be acquired or used (LLAU)


C h u r c h

Limits of deviation for Work No. 20


S t r e e t

Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

N e w

Centreline of Work No. 20

K i n g

7 4 t e e Sh : n ie l c th Ma

S t r e e t

Limits of land to be acquired or used for Work Nos. 22a & 22b Land to be acquired for permanent subsurface works, highway to be retained
S t r ee t
t e re t nS y l e v E

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 20 Centreline of Work No. 20


e t 5 h e 4 n : le S thi Mac

Limits of permanent works for Work Nos. 22a & 22b


S tP hu au r l s c h
S t r ee t C of f ey

A l bu r y

S te r et

et te Sr id fl se rs Co

ar d

S te r et

n o i t u l o s e R

y a

l y de

D e p t f o r d

Deptford Church Street


H i g h S t r e e t

E dw

Land not to be acquired, highway to be retained

i f f i n

S t r e e t

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Greenwich connection tunnel sheet 46 Book of plans - section 2
S48-LA-000-XXXXX-000037 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Limits of land to be acquired or used for Work Nos. 22a & 22b Limits of permanent works for Work Nos. 22a & 22b Land to be acquired for permanent subsurface works, highway to be retained

Centreline of Work No. 20 Limits of deviation for Work No. 20

Key:
Order limits

r No m d a n a Ro

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline

Mac thi le n : Sh e e t 4 6

et r te y e S of C f

Limits of land to be acquired or used for Work Nos. 23a & 23b

Limits of permanent works (land to be permanently acquired)

e k re o dC pfr De t

Land to be permanently acquired


(subsoil only)

Deptford Church Street

Co rs se fl id Sr t e e t

Limits of permanent works for Work Nos. 23a & 23b

y uo eo tn R s l i Wa
Centreline of Work No. 20 Land not to be acquired, highway to be retained Limits of deviation for Work No. 20

t ae s Et i rl ta ds nu hI i wc n re Ge

e sd e ki Cr e

r od t pf De t e re St rh uc Ch

e r t te i f S in Gf

Greenwich Pumping Station

et te Sr hm ka rn Fa

c a le hmP un a sb r Ah

h c i w n e e r

h g i H

v i e tn Eg ro Dr e

d a o R

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Greenwich connection tunnel sheet 47 Book of plans - section 2
S48-LA-000-XXXXX-000038 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

L a n e

Br e wh o u s e

at c hl i ne :S he et 40

Th m a e st n u n l e Wa p ig pn t oR

Fu l f or d

St r ee t

oh r te i te h

N
re c p ig W a p n Do k Ste t

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Cl v Ste t a e re

Tunnel limits of deviation (LOD)


Works centreline

Land to be permanently acquired

Wa p g i Sre p i Hg t t n h e

Wa p pi W n g a l l

(subsoil only)

9 4 e t Sh e n : le thi Mac

River Thames

Centreline of Work No. 1d

Limits of deviation for Work No. 1d

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 48 Book of plans - section 2
S48-LA-000-XXXXX-000039 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Land not to be acquired, highway to be retained


l am

T h e

Br o do lv eL a n e

H i g h w a y

i s

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

oa d

Key:
Order limits

L a n e

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

King Edward Memorial Park Foreshore


T h e H i g h w a y

Sc h o oh lo u s e

w d a h S d a e h r e i P l l e

Land to be permanently acquired


(subsoil only)

Wa pi p g n Wa l l

Centreline of Work No. 1d

J a r d i n e Ro a d

Limits of deviation for Work No. 1d Limits of land to be acquired or used for Work Nos. 24a & 24b

River Thames

Centreline of Work No. 1d 10m 0 Limits of deviation for Work No. 1d Scale 1:1250 at A1 1:2500 if reproduced at A3 100m

at c hl i ne :S he et 51

8 4 t e e Sh : n i le c th Ma

ot he r hi t he

T un ne l

Limits of permanent works for Work Nos. 24a & 24b

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 49 Book of plans - section 2
S48-LA-000-XXXXX-000040 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn. Land not to be acquired, highway to be retained

Key:
Limits of permanent works for Work No. 25
L w o e lSt l r e t e
Order limits

C b al eS te r et
ow B ut c he r R

Limits of land to be acquired or used for Work No. 25

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired

Ro a d

Bekesbourne Street

(subsoil only)

Br a n c h

Rt o eh h ri t t h u e n nl e

P r o p o s e d

P r o p o s e d

n i L k ue os m i h L e
Ma th c l ie n : Sh e t e 4 9

Limehouse Basin

C r o s s r a i l r u C n r n o i s n s g r a t u i l n r n u e n l n i n g t u n n e l

C o mm ec ri a l R o a d

Sp et rS te re t

Limits of deviation for Work No. 1d

t 2 e 5 n : e t h i e Sh Mac l

H os re fr er y R o a d

Centreline of Work No. 1d

N a r r o w

m Li e s ou eh

S t r e e t

nk Li

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

River Thames

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 51 Book of plans - section 2
S48-LA-000-XXXXX-000041 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:
This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)


Works centreline

Wa l o l o w d St re e t

a e Pl c s l ns Wio

S ot uh w ae tr Co l s e

a e L n l n Sa m o

Land to be permanently acquired


(subsoil only)

Px ie l y Sr te et

hm s od To a R a

Mac l e thi : n Sh e e t 1 5

Bu re d t t o R a d

C oe pn hg ae nP l ae c

Limits of deviation for Work No. 1d Centreline of Work No. 1d

n thi : e t 3 M a c l e Sh e 5

m i h ue u L eos C t

C o mm ec ri a l R o a d

e o Sr t D d te

d a o R y b s n i a t S

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

Proposed Crossrail running tunnels

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 52 Book of plans - section 2
S48-LA-000-XXXXX-000042 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

W at t G s r o e v

re l Ga e Ste t

Glu a c u S s t re e t

Fu z r e St re e t

Vi l oe t o R a d

n thi : e t 2 M a c l e Sh e 5

et re rt eS et hs ac Br

Ua mv a rS te re t

N
Yo e Sr te et

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)


Works centreline

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 1d

hm s od To a R a

e a g o Sr t H w od t e
Centreline of Work No. 1d

4 5 n thi : e t M a c l e Sh e

aSe o l r t C tl t e
t re te rh S ot e N p r Up

et re d t e S fl mi ro Bo

t re te s S r p Ch i

y v i sS t r e e t

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 53 Book of plans - section 2
S48-LA-000-XXXXX-000043 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

al l t un ne l G no i l l en rh t de er n rS ap te r pr et oa c h

Mac thi le n : Sh e e t 5 3

B l ac k w

el t i c

S t r ee t

N
E m p s o n S t r e e t

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Tunnel limits of deviation (LOD)


Works centreline

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 1d Centreline of Work No. 1d

5 5 e t h e n : le S thi Mac

d a r o eR et o cs Tw

L e i h m os ue Ct u

w T s e e r t e v l e C t n e c s e r

U a m

T e v i o t S t r e e t
v a r S t r e e t

e e L r ao e L r e v i R

V e n u e

S t r e e t

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 54 Book of plans - section 2
S48-LA-000-XXXXX-000044 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline

Ma thi c l n : e S h e e t 5 4

Limits of permanent works (land to be permanently acquired)

h a n n e l

Land to be permanently acquired


(subsoil only)

Limits of deviation for Work No. 1d Centreline of Work No. 1d

P r e s c o t t C

C a e s l e n n a h R r e v i
Limits of land to be acquired or used for Work Nos. 26a & 26b Limits of permanent works for Work Nos. 26a & 26b

sC re te le ev Tw
t n e c e rs

Abbey Mills Pumping Station

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Main tunnel sheet 55 Book of plans - section 2
S48-LA-000-XXXXX-000045 July 2012

c Thames Water Utilities Ltd 2008

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345

Gallions Reach shopping park

Ho n re W t a y

N Limits of permanent works for Work No. 27a Limits of land to be acquired or used for Work Nos. 27a & 27b

Keyplan:

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired


(subsoil only)

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

Beckton Sewage Treatment Works

FOR INFORMATION

Location Centreline of Work No. 27c Limits of deviation for Work No. 27c
M t l a hn ci : eS e he5 t7

Project wide

Document Information

Section 48 publicity Land acquisition plan Beckton STW site sheet 56 Book of plans - section 2
S48-LA-000-XXXXX-000046 July 2012

c Thames Water Utilities Ltd 2008

Hr on eW t a y

Mapping reproduced by permission of Ordnance Survey on behalf of HMSO. ' Crown Copyright and Database right 2012. All rights reserved. Ordance Survey licence number 100019345
M t l a hn ci : eS e he5 t6

N Limits of permanent works for Work No. 27b

Keyplan:

Limits of land to be acquired or used for Work No. 27a & 27b

This drawing

Coordinates are to be Ordnance Survey Datum OSGB36. All levels are in metres and relate to the Tunnel Datum which is 100 metres below Ordnance Datum Newlyn.

Key:
Order limits

Limits of land to be acquired or used (LLAU)


Tunnel limits of deviation (LOD) Works centreline Limits of permanent works (land to be permanently acquired)

Land to be permanently acquired


(subsoil only)

Centreline of Work No. 27c Limits of deviation for Work No. 27c

Beckton Sewage Treatment Works

10m 0 Scale 1:1250 at A1 1:2500 if reproduced at A3

100m

FOR INFORMATION

Location

Project wide

Document Information

Section 48 publicity Land acquisition plan Beckton STW site sheet 57 Book of plans - section 2
S48-LA-000-XXXXX-000047 July 2012

c Thames Water Utilities Ltd 2008

Das könnte Ihnen auch gefallen