OSHA1926SubpartCC:Cranes andDerricksinConstruction

Summary Ray Feidt, Stephenson Equipment, Inc. Joel Oliva, National Commission for the Certification of Crane Operators (NCCCO

OSHA1926.1400

TYPESOFEQUIPMENTCOVERED

StephensonEquipment,Inc./RayFeidt

1926.1400IncludedEquipment
1926.1400Scope. (a)Thisstandardappliestopoweroperated equipment,whenusedinconstruction,that canhoist,lowerandhorizontallymovea suspendedload.Suchequipmentincludes, butisnotlimitedto:
articulatingcranes(suchasknuckleboom cranes); crawlercranes; floatingcranes; cranesonbarges; locomotivecranes; mobilecranes(suchaswheelmounted, roughterrain,allterrain,commercialtruck mounted,andboomtruckcranes); multipurposemachineswhenconfiguredto hoistandlower(bymeansofawinchor hook)andhorizontallymoveasuspended load; industrialcranes(suchascarrydeckcranes); dedicatedpiledrivers;service/mechanic truckswithahoistingdevice; acraneonamonorail; towercranes(suchasafixedjib,i.e., hammerheadboom),luffingboom,and selferecting); pedestalcranes; portalcranes; overheadandgantrycranes; straddlecranes; sideboomcranes; derricks; andvariationsofsuchequipment.

Attachments.Thisstandardappliesto equipmentincludedinthissectionwhen usedwithattachments.Suchattachments, whethercraneattachedorsuspended include,butarenotlimitedto:hooks, magnets,grapples,clamshellbuckets,orange peelbuckets,concretebuckets,draglines, personnelplatforms,augersordrillsandpile drivingequipment.

StephensonEquipment,Inc./RayFeidt

Exclusions
Exclusions.Thissubpartdoesnotcover:
Machineryincludedinparagraph(a)ofthis sectionwhileithasbeenconvertedor adaptedforanonhoisting/liftinguse.Such conversions/adaptationsinclude,butarenot limitedto,powershovels,excavatorsand concretepumps. Powershovels,excavators,wheelloaders, backhoes,loaderbackhoes,trackloaders. Thismachineryisalsoexcludedwhenused withchains,slingsorotherriggingtolift suspendedloads. Automotivewreckersandtowtruckswhen usedtoclearwrecksandhaulvehicles. Diggerderrickswhenusedforaugeringholes forpolescarryingelectricand telecommunicationlines,placingand removingthepoles,andforhandling associatedmaterialstobeinstalledonor removedfromthepoles.Diggerderricksused inworksubjectto29CFRpart1926,subpart V,mustcomplywith29CFR1910.269.Digger derricksusedinconstructionworkfor telecommunicationservice(asdefinedat29 CFR1910.268(s)(40))mustcomplywith29 CFR1910.268. Machineryoriginallydesignedasvehicle mountedaerialdevices(forliftingpersonnel) andselfpropelledelevatingworkplatforms. Telescopic/hydraulicgantrysystems. Stackercranes. Poweredindustrialtrucks(forklifts),except whenconfiguredtohoistandlower(by meansofawinchorhook)andhorizontally moveasuspendedload. Mechanicstruckwithahoistingdevicewhen usedinactivitiesrelatedtoequipment maintenanceandrepair. Machinerythathoistsbyusingacomealong orchainfall. Dedicateddrillingrigs. Ginpoleswhenusedfortheerectionof communicationtowers. Treetrimmingandtreeremovalwork. Anchorhandlingordredgerelatedoperations withavesselorbargeusing anaffixedAframe. Roustabouts. Helicoptercranes.

StephensonEquipment,Inc./RayFeidt

MaterialHandlers
(MaterialDelivery)
Articulating/knuckleboomtruckcranesthat delivermaterialtoaconstructionsitewhen usedtotransfermaterialsfromthetruck cranetotheground,withoutarrangingthe materialsinaparticularsequencefor hoisting. Articulating/knuckleboomtruckcranesthat delivermaterialtoaconstructionsitewhen thecraneisusedtotransferbuildingsupply sheetgoodsorbuildingsupplypackaged materialsfromthetruckcraneontoa structure,usingafork/cradleattheendof theboom,butonlywhenthetruckcraneis equippedwithaproperlyfunctioning automaticoverloadpreventiondevice.Such sheetgoodsorpackagedmaterialsinclude, butarenotlimitedto:sheetsofsheetrock, sheetsofplywood,bagsofcement,sheetsor packagesofroofingshingles,androllsof roofingfelt. Thisexclusiondoesnotapplywhen:
Thearticulating/knuckleboomcraneisusedto hold,supportorstabilizethematerialto facilitateaconstructionactivity,suchasholding materialinplacewhileitisattachedtothe structure;

Thematerialbeinghandledbythe articulating/knuckleboomcraneisa prefabricatedcomponent.Suchprefabricated componentsinclude,butarenotlimitedto: precastconcretemembersorpanels,roof trusses(wooden,coldformedmetal,steel,or othermaterial),prefabricatedbuilding sectionssuchas,butnotlimitedto:floor panels,wallpanels,roofpanels,roof structures,orsimilaritems; Thematerialbeinghandledbythecraneisa structuralsteelmember(forexample,steel joists,beams,columns,steeldecking (bundledorunbundled)oracomponentofa systemsengineeredmetalbuilding(as definedin29CFR1926subpartR). Theactivityisnotspecificallyexcludedunder 1400(c)(17)(i)and(ii).

StephensonEquipment,Inc./RayFeidt

SUBPARTCC
OSHA1926.1400 coversall equipmentwitha manufactured maximumcapacity ofover2000 poundsusedin constructionwork. SubpartCC, effectivedate: November8,2010 Thesecranes include.
StephensonEquipment,Inc./RayFeidt 6

EquipmentCovered

Rough Terrain Cranes

Carry Deck Cranes

StephensonEquipment,Inc./RayFeidt

EquipmentCovered

Telescopic Truck Cranes

Lattice Crawler Cranes

StephensonEquipment,Inc./RayFeidt

EquipmentCovered

Lattice Truck Crane

Top Slew Tower Cranes

StephensonEquipment,Inc./RayFeidt

EquipmentCovered

Self-Erecting Tower Cranes

Non-Swing Cab Rough Terrain

StephensonEquipment,Inc./RayFeidt

10

EquipmentCovered

ServiceTruckswithCranes (Exception:Iftheyarebeing usedforequipmentrepair worktheyareexempt.) Boom Trucks

StephensonEquipment,Inc./RayFeidt

11

EquipmentCovered

GantryCraneswhenusedinconstructionwork

StephensonEquipment,Inc./RayFeidt

12

EquipmentCovered

Telehandlerswithwinchattachments

Telehandlerswithforksareexempt

StephensonEquipment,Inc./RayFeidt

13

OSHA1926.1400

EQUIPMENTEXEMPT

StephensonEquipment,Inc./RayFeidt

14

DiggerDerrick
Diggerderrickmachinesare exemptiftheyarebeingused foraugeringholesforpoles carryingelectricor telecommunicationlinesand forhandlingtheassociated equipmentthatgetsinstalled onthesepoles. Ifthediggerderrickisusedfor anyotherpurpose,itisnot exempt. i.e.ifthediggerderrickisused tosetpolesinaparkinglot,it isnotexempt.

StephensonEquipment,Inc./RayFeidt

15

MaterialHandlers
Iftheknuckleboom craneisbeingusedto delivermaterialtoa jobsitefromthetruck totheground,without arrangingthematerials inaparticularsequence forhoisting,thecraneis exempt.

StephensonEquipment,Inc./RayFeidt

16

MaterialHandlers
Articulating/knuckleboomtruckcranesare exemptiftheyareusedtodelivermaterialto aconstructionsitewhenthecraneisusedto transferbuildingsupplysheetgoodsor buildingsupplypackagedmaterialsfromthe truckcraneontoastructure,usinga fork/cradleattheendoftheboom,butonly whenthetruckcraneisequippedwitha properlyfunctioningautomaticoverload preventiondevice. Thisexclusiondoesnotapplywhen:
Theknuckleboomcraneisusedtohold, supportorstabilizethematerialtofacilitatea constructionactivity,suchasholdingmaterial inplacewhileitisattachedtothestructure; Thematerialbeinghandledbythe articulating/knuckleboomcraneisa prefabricatedcomponent. Thematerialbeinghandledbythecraneisa structuralsteelmember(forexample,steel joists,beams,columns,steeldecking (bundledorunbundled)oracomponentofa systemsengineeredmetalbuilding Theactivityisnotspecificallyexcludedunder 1400(c)(17)(i)and(ii).

StephensonEquipment,Inc./RayFeidt

17

Excavators
Excavators,wheel loaders,backhoes, powershovelsareall exemptwhenbeing usedforlifting.

StephensonEquipment,Inc./RayFeidt

18

TowTrucks
Towtrucksareexempt iftheyarebeingused forautowrecking. Iftheyarebeingusedto liftsomethingona constructionproject, theyarenotexempt.

StephensonEquipment,Inc./RayFeidt

19

BucketTruck
Buckettrucksare exempt. Theyaremanufactured asvehiclemounted aeriallifts.

StephensonEquipment,Inc./RayFeidt

20

Manlifts
Selfpropelledelevating workplatformsare exempt.

StephensonEquipment,Inc./RayFeidt

21

TelescopicGantrySystem
Telescopicgantry systemsareexempt.

StephensonEquipment,Inc./RayFeidt

22

StackerCranes
Stackercranesare exempt.

StephensonEquipment,Inc./RayFeidt

23

PoweredIndustrialTrucks
Poweredindustrial trucks(forklifts)are exemptifbeingused withforksandother attachments. Exception: Whentheforkliftis equippedwitha winchthatcanhoist andloweraloadand movetheload horizontally,itisnot exempt.

This machine is not exempt

These machines are exempt


StephensonEquipment,Inc./RayFeidt 24

MechanicsTruckwithCranes
Mechanicstruckswith cranesareexempt whenbeingusedwhen maintainingorrepairing equipment. Theyarenotexemptif theyarebeingusedto handlepartsfora machineforthe purposeofassembling themachine.
StephensonEquipment,Inc./RayFeidt 25

ComealongorChainfalls
Anymachineor equipmentthatusesa comealongorchain falltodoliftingis exempt.

StephensonEquipment,Inc./RayFeidt

26

DrillRig
Dedicateddrillrigsare exempt.

StephensonEquipment,Inc./RayFeidt

27

GinPole
Ginpolesareexempt whenusedtoerect communicationtowers.

StephensonEquipment,Inc./RayFeidt

28

TreeWorkusingCranes
Cranesusedtotrimor removetreesare exempt.

StephensonEquipment,Inc./RayFeidt

29

BargeMountedAFrameHoists
BargemountedAframe hoistsusedindredge relatedoperationsare exempt.

StephensonEquipment,Inc./RayFeidt

30

Roustabouts
Roustaboutsare exempt.

StephensonEquipment,Inc./RayFeidt

31

Helicopters
Helicoptercranesare exempt.

StephensonEquipment,Inc./RayFeidt

32

OSHA1926.1400

GROUNDCONDITIONS1926.1402

StephensonEquipment,Inc./RayFeidt

33

GroundConditions1926.1402
Controllingentity:
Mustassurethatground preparationsare: Firm,drainedand graded Sufficienttosupport crane(inconjunction withblocking,mats,etc.)

StephensonEquipment,Inc./RayFeidt

34

GroundConditions1926.1402
TheControlling EntitymustInform equipmentuser& operatorofknown undergroundhazards (voids,utilities,etc.)

StephensonEquipment,Inc./RayFeidt

35

ControllingEntity
Ifthereisnocontrollingentityfor theproject,thispositionmustbe metbytheemployerthathas authorityatthesitetomakeor arrangeforgroundpreparations needed. IftheA/Ddirectororthe operatordeterminesthatground conditionsdonotmeetthe requirements,thatpersons employermusthaveadiscussion withthecontrollingentity regardingtheground preparationsthatareneededso that,withtheuseofsuitable supportingmaterials/devices(if necessary),thesitemeets necessaryrequirements.

StephensonEquipment,Inc./RayFeidt

36

OSHA1926.1400

ASSEMBLY DISASSEMBLY

StephensonEquipment,Inc./RayFeidt

37

Assembly Disassembly
Whenassemblingor disassemblingequipment(or attachments),theemployermust complywithallapplicable manufacturerprohibitionsand mustcomplywitheither:
Manufacturerprocedures applicabletoassemblyand disassembly,or Employerproceduresforassembly anddisassembly.Employer proceduresmaybeusedonly wheretheemployercan demonstratethattheprocedures usedhavebeendevelopedand documentedbyaqualifiedperson. Note:Theemployermustfollow manufacturerprocedureswhenan employerusessyntheticslings duringassemblyordisassembly rigging.
StephensonEquipment,Inc./RayFeidt 38

Assembly DisassemblyRigging
Rigging. Theemployermust ensurethat:
Theriggingworkisdonebya qualifiedrigger. Syntheticslingsareprotected from:Abrasive,sharporacute edges,andconfigurationsthat couldcauseareductionofthe slingsratedcapacity,suchas distortionorlocalized compression. Wireropeslingsmustbeused followingthemanufacturers inspectionsandprotectionmustbe usedwhereapplicable. Whensyntheticslingsareused,the syntheticslingmanufacturers instructions,limitations, specificationsand recommendationsmustbe followed.
StephensonEquipment,Inc./RayFeidt 39

A/DDirector
Whenassemblingordisassemblinga crane,thesegeneralrequirements mustbemet: TheremustbeanA/Ddirectorwhois inchargeoftheoperation. A/DDirectormustbeacompetent &qualifiedperson A/DDirectormust: Understandprocedures Reviewprocedures(unlessA/D Directorhasusedthembefore) Checkthatcrewmembers understandtheirtasks,hazards Followmanufacturersprohibitions AllriggingworkisdonebyaQualified Rigger Whenusingoutriggers fullyextend or deployaspertheloadchart. Capacitylimitsofallassistcranes mustnotbeexceeded.
StephensonEquipment,Inc./RayFeidt 40

Assembly Disassemblynear PowerLinesupto350kV


Beforeassemblingor disassemblingequipment,the employermustdetermineif anypartoftheequipment couldgetcloserthan20feetto apowerlineduringthe assembly/disassemblyprocess. Ifso,theemployermustmeet therequirementsinOption(1), Option(2),orOption(3): Noassembly/disassembly operationsarepermittedunder anenergizedpowerline.
StephensonEquipment,Inc./RayFeidt 41

Assembly Disassembly(Option1)
Deenergizeandground. Confirmfromtheutility owner/operatorthat thepowerlinehasbeen deenergizedandvisibly groundedatthe worksite.

Off

StephensonEquipment,Inc./RayFeidt

42

Assembly Disassembly(Option2)
20footclearance. Ensurethatnopartofthe equipmentgetscloserthan20 feettothepowerlinedoingall ofthefollowing:
Conductaplanningmeeting. Iftaglinesareusedtheymust benonconductive. Andoneofthefollowingmust bedone:
Useadedicatedspotterto watchforpowerlineclearance. Useaproximitydevice. Usearangelimitingdeviceon thecrane. Erectanelevatedwarningline withhighvisibilityflags.

StephensonEquipment,Inc./RayFeidt

43

Assembly Disassembly(Option3)
Ifyoudeterminetheactualpowerlinevoltagefrom theutilitycompanyinwriting,the20footclearance canbereducedtothedistanceslistedintheTableA forclearancesduringoperationandTableT for clearancesduringintransit. Allotherrequirementsofoption2apply.

StephensonEquipment,Inc./RayFeidt

44

OSHA1926.1408&ASMEB30.5Minimum ClearancesduringOperation TABLEA


Voltage(Nominal,kV,AlternatingCurrent Upto50 Over50to200 Over200to350 Over350to500 Over500to750 Over750to1000 Over1000 MinimumClearanceinFeet 10 15 20 25 35 45 (asestablishedbyutilityowner)

StephensonEquipment,Inc./RayFeidt

45

OSHA1926.1411&ASMEB30.5Minimum ClearancesinTransit TABLET


Voltage(Nominal,kV,AlternatingCurrent Upto0.75 Over0.75to50 Over50to345 Over345to750 Over750to1,000 Over1000 MinimumClearanceinFeet 4 6 10 16 20 (asestablishedbyutilityowner) No load, boom lowered. Specifically when a crane is travelling under or near a power line on a construction site with no load. Cranes travelling with a load is governed by the in operation minimum clearances in Table A.
StephensonEquipment,Inc./RayFeidt 46

OSHA1926.1400

POWERLINESAFETY OPERATION

StephensonEquipment,Inc./RayFeidt

47

OSHA1926.1412 DefiningtheWorkZone
Theworkzonemustbe definedbyeither:
Option1:
Erectingboundarymarkingssuch asflagsor, Settingandusingarangelimiting deviceonthecrane, andprohibitingtheoperatorfrom operatingthecranepastthose boundaries.
360 20 350kV 50 > 350kV

Option2:
Definingtheworkzoneasthe area360degreesaroundthe crane,uptotheequipments maximumworkingradius.
StephensonEquipment,Inc./RayFeidt 48

And Determineifanypartofthe crane,ifoperateduptothe cranesmaximumworking radiusintheworkzone, couldgetcloserthan:


20feettoapowerlineupto andincluding350kVor.. 50feetover350kV.

OSHA1926.1412 DefineWorkZone cont.

Ifso,theemployermust meettherequirementsin Option(1),Option(2),or Option(3)ofthissection,as follows:


StephensonEquipment,Inc./RayFeidt 49

YES Option #1 Deenergize & Ground Option #2 Maintain 20foot clearance by doing these:
Option #3 Ask Utility for Voltage and Use Table A to get the minimum clearance and maintain the clearance by doing these:

Is the maximum radius of the crane is within: 20 feet of a power line 350kV, or 50 feet of a power line > 350kV, or OPTION 3 - if the voltage level is known, the minimum distance listed in chart A? Encroachment Prevention Measures
(Equipment Operations)

NO

No further action

Must do all of these: Must have a planning meeting If tag lines are used they must be Non-conductive Elevated warning lines, barricade or line of signs must be positioned visible to the operator. PLUS one of these must be used (Choose one): Proximity alarm, dedicated spotter, warning device, range limiter, or insulating link
StephensonEquipment,Inc./RayFeidt 50

Intentionally Working Closer Than Table A Zone


Must Show: Staying outside zone is infeasible Infeasible to deenergize and ground
All of the following are required: 1. 2. Power line owner sets minimum approach distance Planning meeting minimum procedures
- Dedicated spotter - Elevated warning line or barricade - Insulating link/device - Nonconductive rigging - Range limiter (if equipped) - Nonconductive tag line (if used) - Barricades - 10 feet from equipment - Limit access to essential workers - Prohibit non-operator workers from touching above insulating link - Properly ground crane - Deactivate automatic re-energizer - Insulating line cover-up installed

StephensonEquipment,Inc./RayFeidt

51

OSHA1926.1400

INSPECTIONS

StephensonEquipment,Inc./RayFeidt

52

Inspections
Type of Inspection: Who Inspects:

Modified or repaired/adjusted Post-assembly Shift Monthly Annual

Qualified person Qualified person Competent person Competent person Qualified person
53

StephensonEquipment,Inc./RayFeidt

ShiftInspection
Theshiftinspectionisnormallydone bytheoperator.OSHArequiresthe personthatdoesthisinspectionto beconsideredacompetentperson. Competentpersonmeansonewhois capableofidentifyingexistingand predictablehazardsinthe surroundingsorworkingconditions whichareunsanitary,hazardous,or dangeroustoemployees,andwho hasauthorizationtotakeprompt correctivemeasurestoeliminate them. Thisinspectiondoesnotneedtobe documented. Theshiftinspectionmustbeginprior totheshiftandbefinishedbefore theendoftheshift.

StephensonEquipment,Inc./RayFeidt

54

MonthlyInspections
Themonthlyinspectionis normallydonebythe operator.OSHArequiresthe personthatdoesthis inspectiontobeconsidereda competentperson. Thisinspectionneedstobe documented(recordedin writing). Thelastthreemonthly inspectionsmustberetained. Theseinspectionreportsmust bemadeavailabletoall peoplethatareorwillbe inspectingthecrane. Anydeficiencyfoundduring theannualinspectionthatwas recordedasneeding monitoredonamonthlybasis mustbeinspectedduringthe monthlyinspectionand recordedspecificallyonthe monthlyinspectionreport.

StephensonEquipment,Inc./RayFeidt

55

AnnualInspection
Theannualinspectionisnormally notdonebytheoperator.OSHA requiresthepersonthatdoesthis inspectiontobeconsidereda qualifiedperson. Qualifiedpersonmeansaperson who,bypossessionofa recognizeddegree,certificate,or professionalstanding,orwhoby extensiveknowledge,training andexperience,successfully demonstratedtheabilityto solve/resolveproblemsrelating tothesubjectmatter,thework, ortheproject. Thisinspectionneedstobe documented(recordedin writing). Thelastannualinspectionmust beretained.Thisinspection reportmustbemadeavailableto allpeoplethatareorwillbe inspectingthecrane.

StephensonEquipment,Inc./RayFeidt

56