Beruflich Dokumente
Kultur Dokumente
http://www.cpri.in/testing/id/emi_id.html
Home
About Us
R&D
Testing
Consultancy
Units
Others
What's New !!
EMI/EMC Laboratory
ID Home CPRI has setup the comprehensive test facility for EMI/EMC compliance testing to cater the needs of Manufacturer / Industry. The laboratory is equipped with the state-of-the-art instrumentation, which complies with the requirements of International standards. The testing is performed automatically and controlled through software. The test facility available is also extended for developmental activity. EMI/EMC tests are conducted as per National / International standards.
Name of the test Standard Applicable Electrostatic Discharge immunitytest IEC : 61000-4-2, 1995 Radiated radio frequency electromagnetic field immunity test using GTEM cell. PN :- The maximum size of the equipment that can be tested inside GTEM cell is restricted to 0.4mx0.4mx0.4m. Electrical fast transient / burst immunity test Conducted radio frequencyimmunity test IEC : 61000-4-3, 1995
1 of 3
3/9/2012 4:34 PM
http://www.cpri.in/testing/id/emi_id.html
Radio frequency interference Conducted emission Radiated emission using :Absorbing clamp GTEM cell and correlate the data obtained to Open Area Test Site CISPR 14-1, CISPR 16-1, 16-2
Products that can be Tested : Single phase / Three phase Static watt-hour meters Electronic Trivector meters Static protective relays Smaller size UPS, SMPS, Inverters, Converters, Contactors etc.
Need for EMI/EMC Test : Ever increasing use of power electronics equipments and communication equipments in every walk of life is increasing the electromagnetic pollution day by day. This pollution may degrade the performance of electronic and electrical equipments. Therefore it is necessary that all electronic equipments or systems must be constructed so as to ensure that any electromagnetic disturbance it generates allows radio and telecommunication equipment and other apparatus to operate as intended, further equipment must be constructed with an inherent level of immunity to externally generated electromagnetic disturbances. Testing & evaluation has thus become necessary to ensure that the products work satisfactorily in the present day electromagnetic environment. It is essential that each equipment or system design meets the compatibility levels specified in the National / International Standards.
2 of 3
3/9/2012 4:34 PM
http://www.cpri.in/testing/id/emi_id.html
HOME
CONTACT US
CAREERS
PHOTO GALLERY
EVENTS
TENDERS
POWER LINKS
SITEMAP
ROUTE MAP
INTRANET
SEARCH
Designed, Developed & Maintained by Utility Automation Research Center Central Power Research Institute (An autonomous society under Ministry of Power, Govt of India)
3 of 3
3/9/2012 4:34 PM