Sie sind auf Seite 1von 3

CPRI- EMI / EMC Test Facility, Bangalore

http://www.cpri.in/testing/id/emi_id.html

Home

| Careers| Events| Vigilance | Contact | Search | Queries ??? |

About Us

R&D

Testing

Consultancy

Units

Others

What's New !!

EMI/EMC Laboratory
ID Home CPRI has setup the comprehensive test facility for EMI/EMC compliance testing to cater the needs of Manufacturer / Industry. The laboratory is equipped with the state-of-the-art instrumentation, which complies with the requirements of International standards. The testing is performed automatically and controlled through software. The test facility available is also extended for developmental activity. EMI/EMC tests are conducted as per National / International standards.

Setup of EMC Lab

Name of the test Standard Applicable Electrostatic Discharge immunitytest IEC : 61000-4-2, 1995 Radiated radio frequency electromagnetic field immunity test using GTEM cell. PN :- The maximum size of the equipment that can be tested inside GTEM cell is restricted to 0.4mx0.4mx0.4m. Electrical fast transient / burst immunity test Conducted radio frequencyimmunity test IEC : 61000-4-3, 1995

IEC : 61000-4-4, 1995 IEC : 61000-4-6, 1996

1 of 3

3/9/2012 4:34 PM

CPRI- EMI / EMC Test Facility, Bangalore

http://www.cpri.in/testing/id/emi_id.html

Radio frequency interference Conducted emission Radiated emission using :Absorbing clamp GTEM cell and correlate the data obtained to Open Area Test Site CISPR 14-1, CISPR 16-1, 16-2

Products that can be Tested : Single phase / Three phase Static watt-hour meters Electronic Trivector meters Static protective relays Smaller size UPS, SMPS, Inverters, Converters, Contactors etc.

Need for EMI/EMC Test : Ever increasing use of power electronics equipments and communication equipments in every walk of life is increasing the electromagnetic pollution day by day. This pollution may degrade the performance of electronic and electrical equipments. Therefore it is necessary that all electronic equipments or systems must be constructed so as to ensure that any electromagnetic disturbance it generates allows radio and telecommunication equipment and other apparatus to operate as intended, further equipment must be constructed with an inherent level of immunity to externally generated electromagnetic disturbances. Testing & evaluation has thus become necessary to ensure that the products work satisfactorily in the present day electromagnetic environment. It is essential that each equipment or system design meets the compatibility levels specified in the National / International Standards.

2 of 3

3/9/2012 4:34 PM

CPRI- EMI / EMC Test Facility, Bangalore

http://www.cpri.in/testing/id/emi_id.html

HOME

CONTACT US

CAREERS

PHOTO GALLERY

EVENTS

TENDERS

POWER LINKS

SITEMAP

ROUTE MAP

E-MAIL

INTRANET

SEARCH

Designed, Developed & Maintained by Utility Automation Research Center Central Power Research Institute (An autonomous society under Ministry of Power, Govt of India)

3 of 3

3/9/2012 4:34 PM

Das könnte Ihnen auch gefallen