Beruflich Dokumente
Kultur Dokumente
1/4/2010
MANPOWER
1 2 3 4 5 6 7 ENGINEERS SUPERVISORS SKILLED Mason Group Carpenter Group Bar Bender Group UNSKILLED TOTAL 0
DATE
TOTAL % 22.02 4.15 29.74 2.36 3.38 20.04 4.82 6.50 0.18 6.00 0.81 100.0
1/4/2010
PLANNED 1/4/2010 ACHIEVED 1/4/2010
Earthwork Major Bridges Minor Bridges Pway Supply Pway Execution Retaining Wall S&T Electrical Buildings Design and Approval Road Diversion
Total
Machinery Deployment
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
0.00
0.00
Batching Plant(30M3/hr)) Concrete Mixer(10/7) Weigh Batcher Vibrators Dewatering Pump Water Tanker Tractor with trailors Shuttering Material Concrete Pumps Transit Mixers Vibro Roller Excavators JCB Dump Trucks Dozers Graders DATE 1/4/2010
BACK LOG
REMARKS
1) 1 2 3 4 5 6 2) 1 2 3 4 5 6 7 8 9 10 11 12 13
Earthwork Earthwork in Filling Earthwork in Cutting in all soils Earthwork in Cutting in rock which requires Chiseling and Drilling Earthwork in Cutting in rock which requires Blasting Blanketing Material Clearance and removal of trees Major Bridges Earthwork in Cutting of foundation in all soils Earthwork in Cutting of foundation in Soft rock Earthwork in Cutting of foundation in Hard rock 1200mm dia M 35 grade RCC cast-in-situ bored piles 6mm thick MS Liner around the 1200mm dia piles up to a depth of 3m Carrying out vertical load test (initial test), (compression) by hydraulic jack on single pile Carrying out vertical load test (routine test) (compression) by hydraulic jack on single pile Carrying out Lateral load test on two piles by introducing a hydraulic jack with gauge plain cement concrete CC 1:4:8 (Min cement content 160Kg/m3) in leveling course reinforced cement concrete of grade M35 for foundation works i.e. base raft, open foundation and pile cap reinforced cement concrete of grade M35 for superstructure works i.e. abutment, pier, pier cap, boxculvert base Supplying, bending and binding and laying in position steel reinforcement conforming to IS-1786:-1984 M 15 Concrete for Plain Cement Concrete Work for making
Cu.m Cu.m Cu.m Cu.m Cu.m N0's Cu.m Cu.m Cu.m RM RM No No No Cu.m Cu.m Cu.m Cu.m
16
17 18 19 20 21 3) 1 2 3 4 5
Cu.m 10508 MT Cu.m Cu.m Sq.m 1419 926 54826 686 9486 4562 4199 343 17494 MT Cu.m Cu.m Sq.m Sq.m Sq.m RM 200 2910 2699 3766 6373 7894 2941
6 7 8 9 10 4) 1 2 3 4 5 6 7 8 9 10 11 12 5
NAME OF WORK: Rail link project for Maithon Power Ltd. at Maithon (Jharkhand)
AS ON DATE: 1/4/2010 TIME : 7.00 p.m Days Weather:SUNNY
SLNO 1) 1 2 3 4 5 6 2) 1 2 3 4 5 6 7 8 9 10 11 12 13
Description Earthwork Earthwork in Filling Earthwork in Cutting in all soils Earthwork in Cutting in rock which requires Chiseling and Drilling Earthwork in Cutting in rock which requires Blasting Blanketing Material Clearance and removal of trees Major Bridges Earthwork in Cutting of foundation in all soils Earthwork in Cutting of foundation in Soft rock Earthwork in Cutting of foundation in Hard rock 1200mm dia M 35 grade RCC cast-in-situ bored piles 6mm thick MS Liner around the 1200mm dia piles up to a depth of 3m Carrying out vertical load test (initial test), (compression) by hydraulic jack on single pile Carrying out vertical load test (routine test) (compression) by hydraulic jack on single pile Carrying out Lateral load test on two piles by introducing a hydraulic jack with gauge plain cement concrete CC 1:4:8 (Min cement content 160Kg/m3) in leveling course reinforced cement concrete of grade M35 for foundation works i.e. base raft, open foundation and pile cap reinforced cement concrete of grade M35 for superstructure works i.e. abutment, pier, pier cap, boxculvert base Supplying, bending and binding and laying in position steel reinforcement conforming to IS-1786:-1984 M 15 Concrete for Plain Cement Concrete Work for making the toe wall, drop and curtain walls at U/S and D/S Supplying, Detailing, fabricating, transporting to site and
Unit Cu.m Cu.m Cu.m Cu.m Cu.m N0's Cu.m Cu.m Cu.m RM RM No No No Cu.m Cu.m Cu.m Cu.m Cu.m
TODAY'S PROGRESS
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
% ACHEVIED
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
191 0
0.00
0.00
0.00
MT 141.12
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
14 15 erecting in position the steel open web through type girder Supplying, Detailing, fabricating, transporting to site and erecting in position the mild steel chequered plates Fabrication, transportation, supply and fixing of new galvanized steel channel sleepers Supplying fitting fixing in position true to line and levels approved Rocker and Roller Bearing for 30.5 m span (a) Rocker bearing (b) Rocker cum Roller bearing Backfilling with filter media behind abutment, wing and return wall with good local coarse sand Providing and laying 600 mm thick boulders apron Providing and laying pitching stone in slopes Backfilling with 600mm thick boulders of size not less than 225mm behind abutment, wing and return wall Supplying, Providing and placing in position the reinforced cement concrete Hume Pipe of type NP-4 Retaining Wall Earthwork in Cutting of foundation in all soils Earthwork in Cutting of foundation in Soft rock Earthwork in Cutting of foundation in Hard rock plain cement concrete CC 1:4:8 (Min cement content 160Kg/m3) in leveling course Supplying, Providing and placing in position reinforced cement concrete of grade M35 for foundation works i.e. base raft, open foundation with 20mm Supplying, Providing and placing in position reinforced cement concrete of grade M35 for superstructure works i.e. retaining wall with 20mm Supplying, bending and binding and laying in position steel reinforcement conforming to IS-1786:-1984 Providing and laying M 15 Concrete for Plain Cement Concrete Work for making the toe wall Backfilling with filter media behind retaining wall with good local coarse sand Providing expansion joint with bituminous impregnated board type expansion joint Minor Bridges Earthwork in Cutting of foundation in all soils Earthwork in Cutting of foundation in Soft rock Earthwork in Cutting of foundation in Hard rock plain cement concrete CC 1:4:8 (Min cement content 160Kg/m3) in leveling course reinforced cement concrete of grade M35 for superstructure works i.e. abutment, pier, pier cap, boxculvert base Supplying, bending and binding and laying in position steel reinforcement conforming to IS-1786:-1984 Providing and laying M 15 Concrete for Plain Cement Concrete Work for making the toe wall Backfilling with filter media behind abutment, wing and return wall with good local coarse sand Providing and laying 600 mm thick boulders apron on river bed Providing and laying pitching stone in slopes Backfilling with 600mm thick boulders of size not less than 225mm behind abutment, wing and return wall Supplying, Providing and placing in position the reinforced cement concrete Hume Pipe of type NP-4 as per IS:458:2003 MT MT
2.51 110
16
17 18 19 20 21 3) 1 2 3 4 5
0.00
0.00
0.00
Cu.m 10508
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 7 8 9 10 4) 1 2 3 4 5 6 7 8 9 10 11 12
0.00
0.00
0.00
0.00
#REF!