Sie sind auf Seite 1von 39

MW & MUX Hardware Installation Quality

Engineering service department 2009-7-9

MW installation

Installation material

MW installation

IF connector

MW installation

IF cable connector

MW installation

Power cable connector

Power connector

GND

MW installation

Installation material

MW installation

Installation material

MW installation

Installation material

MW installation

Installation material

MW installation

Installation material

MW installation

Antenna installation
The antenna and ODU polarization should be consistent with the engineering design document

MW installation

Antenna installation

The fixation of antenna and pole are reliable. For the more than 1.2m antenna, the side strut must be installed and fixed position is correct.

MW installation

Antenna installation

MW installation

Antenna polarization

MW installation

ODU polarization

MW installation

ODU Check

MW installation

Hybrid installation

MW installation

Hybrid installation

MW installation

Hybrid installation

MW installation

Hybrid installation for 6/7/8G

MW installation

Hybrid polarization

MW installation

ODU installation
The IF connector of ODU should be waterproofed and face downward.

The ODU grounding cable should be shortest length as possible and attached to grounding system by the cable clamp.

MW installation

ODU installation

MW installation

IF cable routing
IF redundant: Leave enough slack when connecting cables to the ODU to facilitate future maintenance, and IF cable should be fixed tightly

MW installation

IF cable routing

The IF cable route and position for the cabling should be designed beforehand and arranged neatly. IF cable turns should be smooth, and the bending radius should be larger than 30 cm.

MW installation

IF cable routing

MW installation

Rack installation

MW installation

Rack installation

MW installation

IDU installation
IF cable Every cable should be labeled

Power cable: red to 0;Blue to -48V

Grounding cable

E1 cable

MUX Installation

The MUX has two power input.

MW installation

IDU installation

MW installation

IDU Power cable

MW installation

E1 cable in DDF box

MUX Installation

Keep 1U distance at least between MUX and IDU.

Firber Routing

The fiber connection lines should be routed as required by the design

and engineering drawings (or the user);

Redundant length of fiber connection lines at both ends should be identical and compliant with the technical requirements.

Firber Routing

The bending radius of the fiber connection lines inside the troughs at the turning points should be not less than 38 ~ 40 mm.

Fiber connection lines should be protected with tubes or troughs. The parts without tubes should be bound with proper force with cable ties.

The bundled fiber connection lines should be straight without evident twists in troughs.

Optical fiber from the connector at both ends of 1-2cm department

should paste a good label, and the label should be written normally.

E1 Cable

Redundant length of cables at end should be bended.

The route and direction of E1 cables should comply with the design.

E1 Cable
The cables in the aisle must be

bounded. The bundled cables


should be tightly against each with straight appearance.

Das könnte Ihnen auch gefallen