HRSG START-UP PROCEDURE GD Should have to be in open condition.

. (Check the open feedback) HP,IP & LP Drum level 50% to 60%. HP, IP & LP Start-up vent (Boiler end) 40% to 50% open. HP, IP & LP By-pass system to ACC should have to be in closed condition. All the manual drain lines should have to be in crack open condition. Check all the isolation valves condition in the field. Deaerator level 95% CRT tank level 65% For Cold start GT Exhaust temp 3800C TO 4200C. For Warm start GT Exhaust temp 4400C TO 4700C. For Hot start GT Exhaust temp 4900C TO 5200C. Open the DD 10% (15 min)(Check the feedback) Check the flue gas temp. It should have to be in the raising trend. Open the DD 20% (15 min)(Check the feedback) If the HP Drum pr. Increase above 2Kg/cm2, close the hp drum vent (2_MOV_04_006 & 2_MOV_04_007). If the HP Drum pr. Increase above 5Kg/cm2 check the IBD valves (2_MOV_04_008 & 2 _MOV_04_009) are closed. If the HP Drum pr. Increase above 5Kg/cm2 start the Vaccum pumps & ACC fans. Ens ure one hotwell pump should have to be in auto mode. Start the gland steam cooler fan. Once the HP MS Pr. & Temp. reaches above 25Kg/cm2 & 3500C open the boiler end by -pass valve for line warm-up. Open the DD 25% (10 min)(Check the feedback). Frequently check the flue gas temp trend. Once the HP MS Pr. & Temp. reaches above 45Kg/cm2 & 4000C open the boiler end ma in stop valve for line warm-up, close the by-pass valve & open the HP By-pass PR DS valve 10% - 15%.(Check the feedback) Once the HP By-pass PRDS valve opened, monitor the vaccum pr. frequently. If the IP Drum pr. Increase above 2Kg/cm2, close the ip drum vent (2_MOV_04_017 & 2_MOV_04_018). Open the DD 30% (10 min) (Check the feedback). Frequently check the flue gas tem p trend. If the IP Drum pr. Increase above 5Kg/cm2 check the IBD valve (2_MOV_04_020) is closed. If the CRT Tank level increases above 65% start the CEP Pump as per starting pro cedure. At the time of CEP start up keep the recirculation valve set point as 50 . Once the IP MS Pr. & Temp. reaches above 8Kg/cm2 & 1600C open the boiler end mai n stop valve for line warm-up & close the IP start-up vent. Switch on the gland steam cooler fan Open the DD 40% (15 min). Frequently check the flue gas temp trend. Open IP Gland sealing PRDS valve 20% (Check the feedback) for line warm-up. Gradually open the IP Gland sealing PRDS valve to 100% Once the line temperature reaches above 180 Deg. Cel. Admit the steam to gland. Once the steam admitted to the gland, frequently monitor the vaccum pr. If the LP Drum pr. Increase above 4Kg/cm2 open the LP bypass valve and then op en the LP main steam stop valve boiler end Open the DD 45% (10 min). Frequently check the flue gas temp trend. Check all the drum pr. & temp. frequently. Start the SOP & Now open the HP Main steam stop valve manually ( appr. 03 turns ) for line warm-up & turbine end start-up vent 40 -50% open. Once the rolling parameters obtained check all parameters again. Before resetting the control oil pressure. QCNRV IP/LP wheels should have to be in closed condition & starting device in closed condition. Once the control oil pr. Developed, open the starting device slowly to open the turbine ESV. Then reset the alarm in the STG DCS.

Then reset the alarm in the STC ETS panel. Then reset in the TTL page. Then open the DD gradually to 100%

Das könnte Ihnen auch gefallen