CONTRACTS & SPECIFICATION( ARE 459)

PROJECT PHASES
ARE 459 CONTRACTS & SPECIFICATION CLASS -2

By
Zulfikar Aliyu Adamu ARE DEPT
1

CONTRACTS & SPECIFICATION( ARE 459)

Presentation Outline

Phases of a construction project


Planning Design Construction Procurement Construction Post construction (Occupancy) Notice to Bidders

CONTRACTS & SPECIFICATION( ARE 459)

Objectives of Class :
To acquire a working knowledge of the principal project phases. To identify activities associated with each phase of a construction project. To provide an understanding of the design and construction process and the roles of the different participants, and the types of documents produced during each phase

CONTRACTS & SPECIFICATION( ARE 459)

Major Project Phases


The major phases in the project cycle that are common to most design and construction projects are : Project Planning Design Schematic Design Design Development Contract Documents Construction Procurement (Bidding Phase) Construction Occupancy
4

CONTRACTS & SPECIFICATION( ARE 459)

Phase 1 :Project Planning


The planning stage of the project : During this phase of the project the owner makes decisions that set the tone for the project. All projects begin with an idea or a need During this stage the owner : selects the project site, and establishes a conceptual estimate, schedule. The most critical decision that is made during this project phase is to make a decision as to whether or not to proceed with 5 the project (called a go/no go decision).

CONTRACTS & SPECIFICATION( ARE 459)

Phase 1: Project Planning Phase Activities


Feasibility studies Facility programming Budgeting Project delivery system selection Scheduling Site selection/acquisition Site investigation Financing Design services procurement

CONTRACTS & SPECIFICATION( ARE 459)

Phase 2 :DESIGN PHASE


Design process involves: Schematic Design Talk to owner, rough sketches Design Development Major Systems & component selected Contract Documents Preliminary Cost estimate Develop Preliminary working drawings Develop working drawings with Specifications

CONTRACTS & SPECIFICATION( ARE 459)

Schematic Design
The A/E reviews and evaluates the owners program and budget requirements and discusses with the owner alternative approaches to the design and construction During schematic design, the A/E prepares conceptual design documents. These may include: Preliminary sketches ,Small scale schematic plans, elevations, sections, diagrams, renderings, and other graphic and written documents, General written description of project. The completion of the schematic design phase represents approximately 30 percent design completion for the project

CONTRACTS & SPECIFICATION( ARE 459)

Design Development
The design development phase takes the project from about 30 percent to approximately 60 percent design. It is the time when the design team will be evaluating and selecting all the major systems and components of the project. During this phase of the project the design team is involved in the evaluation and finalization of all the architectural components and project systems. The project's budget and schedule continue to be monitored and adjusted.
9

CONTRACTS & SPECIFICATION( ARE 459)

The Architectural Design Process - General

10

CONTRACTS & SPECIFICATION( ARE 459)

11

CONTRACTS & SPECIFICATION( ARE 459)

Architectural Fee - Payment Schedule


Construction Supervision 20% Conceptual Design 15%

Design Development 20% Working Drawing 45%

12

CONTRACTS & SPECIFICATION( ARE 459)

Construction Bid Documents


Architect
Structural Engineer Mechanical Engineer

CAD Drafting Software

Specifications

Architectural Drawings

Structural Drawings

Mechanica & Electrica Drawings

Construction Bid Documents


13

CONTRACTS & SPECIFICATION( ARE 459)

Phase 3: Construction Procurement


Contractor qualification/bidder list Solicitation Proposal preparation Bid/proposal opening Bid/proposal evaluation Award of contract Final negotiation

Phase 4: Construction
Mobilization
Subcontracting Purchasing Permits Site preparation

Foundations Interior finishes and equipment

14

CONTRACTS & SPECIFICATION( ARE 459)

Phase 5: Occupancy/Post construction


Start-up and testing Leasing Tenant improvements Move-in Operation Correction Repairs/maintenance Building evaluation

15

CONTRACTS & SPECIFICATION( ARE 459)

Development, Design, Construction, and Management Process

Identify & Acquire Real Estate

Plan & Develop Project

Architectural Engineering Design

Secure Financing

Construction

Sales, Marketing & Promotion

Operation & Management

Architect

Architect

Contractors

Developers Owners
16

CONTRACTS & SPECIFICATION( ARE 459)

17

CONTRACTS & SPECIFICATION( ARE 459)

18

CONTRACTS & SPECIFICATION( ARE 459)

Cost-Influence Curve

19

CONTRACTS & SPECIFICATION( ARE 459)

CONCLUSION
The major phases in the project cycle are : Project Planning Design Schematic Design Design Development Contract Documents Construction Procurement (Bidding Phase) Construction Post Construction( Occupancy)
20