Subpart A - General Scope of part. Definitions. Class locations. Incorporation be reference. lines. Gathering Outer continental shelf pipelines Petroleum gas systems. General. Conversion to service subject to this part. Rules of regulatory construction. Customer notification. 192.1 192.3 192.5 192.7 192.9 192.10 192.11 192.13 192.14 192.15 192.16 N N N N N Y N N N N N Y Y Y Y Y Y Y N N Y N Y N Y Y Y N Y
N N Y N N Y N N Y N N Y N N Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart B - Materials Scope. General. New steel pipe Used steel pipe New or used steel pipe Steel pipe not previously used New steel pipe that has been cold expanded Reserved New plastic pipe Used plastic pipe Pipe of a diameter not listed in a specification Reserved Marking of materials. Transportation of pipe. 192.51 192.53 192.55(a) 192.55(b) 192.55(c) 192.55(d) 192.55(e) 192.57 192.59(a) 192.59(b) 192.59(c) 192.61 192.63 192.65 N N N N N N N N N N N N Y Y Y Y Y Y N Y Y Y Y Y Y
N N Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart C - Pipe Design Scope. General. Design formula for steel pipe. Yield strength (S) for steel pipe. Nominal wall thickness (t) for steel pipe. Design factor (F) for steel pipe. Longitudinal joint factor (E) for steel pipe. Temperature derating factor (T) for steel pipe Reserved Reserved Design of plastic pipe. Design limitations for plastic pipe. Design of copper pipe. 192.101 192.103 192.105 192.107 192.109 192.111 192.113 192.115 192.117 192.119 192.121 192.123 192.125 N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N Y Y Y Y Y Y Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart D - Design of Pipeline Components Scope. General requirements. Qualifying metallic components. Valves Flanges and flange accessories. Standard fittings. Passage of internal inspection devices. Tapping. Components fabricated by welding. Welded branch connections. Extruded outlets. Flexibility. Supports and anchors Strain, forces, vibration Supports and anchors End force 192.141 192.143 192.144 192.145 192.147 192.149 192.150 192.151 192.153 192.155 192.157 192.159 192.161(a) 192.161(b) N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y Y Y Y
Y Y Y Y Y Y Y Y Y Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Supports and anchors Designed and installed Supports and anchors Designed and installed Supports and anchors 50 % or more of SMYS Supports and anchors Fixed object Supports and anchors Connection to new branches Compressor stations: Design and construction. Compressor stations: Liquid removal. Compressor stations: Emergency shutdown. Compressor stations: Pressure limiting devices. Compressor stations: Additional safety equipment. Compressor stations: Ventilation.
192.161(c)
Main O&M
192.161(c)
Support and anchor maintenance Transmission line O&M Support and anchor maintenance
Y Y Y
Y Y
Y Y Y
N N Y N N Y N N Y
Y Y Y
N N Y N N Y N N Y N N Y N N Y
Y Y Y Y Y
192.173
N N Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Pipe-type and bottle-type holders. Additional provisions for bottle-type holders. Transmission line valves. Distribution line valves. Vaults: Structural design requirements. Vaults: Accessibility. Vaults: Sealing, venting and ventilation. Vaults: Drainage and waterproofing. Design pressure of plastic fittings. Valve installation in plastic pipe. Protection against accidental overpressure. of gas, highPressure pressure distribution systems. Requirements for design of pressure relief and limiting devices. Materials
192.175 192.177 192.179 192.181 192.183 192.185 192.187 192.189 192.191 192.193 192.195 192.197
N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y N N Y
Y Y Y Y Y Y Y Y Y Y Y Y
192.199
N N Y
192.199(a)
N N Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Valves and valve seats Installed for ready operation and testing Supports Discharge stacks, vents, or outlet ports Installed to prevent hammering and impairment of relief capacity and installed Designed to prevent any single incident capacity of Required pressure relieving and limiting stations Installation and set point More than one pressure regulating or compressor station Low pressure distribution system Instrument, control, sampling pipe and components Applicability Materials and design
N N Y Y Y Y N N Y N N Y
Y Y Y Y Y Y Y
Pressure relief & limiting device maintenance Pressure relief & limiting device maintenance
Y Y Y
192.199(g) 192.201
Y Y Y
Y Y
192.201(a) 192.201(b)
Y Y Y N N Y
Y Y Y
192.201(c) 192.203
N N Y N N Y
Y Y
192.203(a) 192.203(b)
N N Y N N Y
Y Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart E - Welding of Steel in Pipelines Scope Welding - General. Welding by qualified welder with qualified procedures Record of procedures Qualification of welders. Limitations on welders. Qualifications based on NDE Engaged in welding in proceeding 6 months A welder qualified under 192.227(a) A welder qualified under 192.227(b) Protection from weather. Miter joints. Preparation for welding. Inspection and test of welds. Visual inspection of welds NDE of welds 192.221 192.225 192.225(a) 192.225(b) 192.227 192.229 192.229(a) 192.229(b) 192.229(c) 192.229(d) 192.231 192.233 192.235 192.241 192.241(a) 192.241(b) Welding Welding Welding N N Y Welding Y Y Y N N Y N N Y N N Y N N Y N N Y N N Y Y Y Y Y Y Y Y Y Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y
Y Y Y Y
Y Y
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Acceptability of welds Acceptability of welds Nondestructive testing. Repair or removal of defects. Removal & repair of unacceptable welds Repair process & inspection Repair process & inspection Repair process & inspection Repair in a previously repaired area Repair in a previously repaired area Repair in a previously repaired area
192.241(c) 192.241(c) 192.243 192.245 192.245(a) 192.245(b) 192.245(b) 192.245(b) 192.245(c) 192.245(c) 192.245(c)
Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y
Y Y Y
Welding Welding Welding - Visual inspection Welding - NDE Welding Welding - Visual inspection Welding - NDE
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y
10
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart F - Joining of Materials Other Than by Welding Scope General. Pipeline design & installation 192.271 192.273 192.273(a) N N Y N N Y N Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Joining in accordance with written procedures Joint inspection Cast iron pipe. Ductile iron pipe. Copper pipe. Plastic pipe. Disturbance of plastic pipe joints Solvent cement joints Heat-fusion joints Adhesive joints
192.273(b) 192.273(c) 192.275 192.277 192.279 192.281 192.281(a) 192.281(b) 192.281(c) 192.281(d)
Joining Joining inspection Joining cast iron pipe Joining ductile iron pipe Joining copper pipe Joining plastic pipe Joining plastic pipe solvent cement joints Joining plastic pipe heat-fusion joints Joining plastic pipe adhesive joints
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y
11
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Mechanical joints Plastic pipe: qualifying joining procedures. Plastic pipe: qualifying persons to make joints. Plastic pipe: inspection of joints.
Y Y Y N N Y N N Y N N Y
Y Y Y Y Y
12
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart G - General Construction Requirements for Transmission Lines and Mains Scope Compliance with specifications and standards. Compliance with specifications and standards. Inspection: General Inspection: General 192.301 192.303 Main O&M Compliance with specifications Transmission line O&M and standards. Compliance with specifications Main O&M - Inspection and standards. Inspection Transmission Line O&M Inspection - Inspection Main O&M - Inspection Inspection of materials Transmission Line O&M Inspection of - Inspection materials Main O&M Transmission line O&M Welding Welding - NDE Main O&M Transmission line O&M Main O&M N N Y Y Y Y N Y Y
192.303
Y Y Y
192.305 192.305
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y
Inspections of materials. 192.307 Inspections of materials. 192.307 Repair of steel pipe. Repair of steel pipe. Repair of steel pipe. Repair of steel pipe. Repair of plastic pipe. Repair of plastic pipe. Bends and elbows. 192.309 192.309 192.309 192.309 192.311 192.311 192.313
Y Y Y Y Y
13
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Bends and elbows. Wrinkle bends in steel pipe. Wrinkle bends in steel pipe. Protection from hazards. Protection from hazards Transmission lines hoop stress of 20% or more of SMYS Backfilling Backfilling Installation of offshore pipe Installation of plastic pipe. Installation of plastic pipe. Casings. Casings. Underground clearances. line Transmission clearances Main clearances Plastic transmission lines & mains, protection from heat
Transmission line O&M Main O&M Transmission line O&M Main O&M Transmission line O&M Transmission line O&M
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y
192.319(b) 192.319(b) 192.319(c) 192.321 192.321 192.323 192.323 192.325 192.325(a) 192.325(b) 192.325(c)
Main O&M Transmission line O&M Offshore pipeline O&M Main O&M Transmission line O&M Main O&M Transmission line O&M Transmission line O&M Main O&M Main O&M
Y Y Y Y Y Y Y
Y Y Y Y Y Y Y
Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y Y Y Y Y
14
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Plastic transmission lines & mains, protection from heat Pipe-type and bottle-type holder clearances Pipe-type and bottle-type holder clearances Cover. Transmission line cover Main cover Protection when minimum cover not met Protection when minimum cover not met Main cover less than 24 inches Pipe installed in navigable river, stream or harbor Pipe installed in navigable river, stream or harbor Pipe installed offshore, except in the Gulf of Mexico Pipelines installed in the Gulf of Mexico and its inlets
192.325(c)
Y Y Y
192.325(d) 192.325(d) 192.327 192.327(a) 192.327(b) 192.327(c) 192.327(c) 192.327(d) 192.327(e) 192.327(e) 192.327(f)
Y Y Y Y Y Y
Y Y Y Y
Transmission line O&M Main O&M Main O&M Transmission line O&M Main O&M Main O&M Transmission line O&M Offshore pipeline installation Offshore pipeline installation
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y
Abnormal operating condition Abnormal operating condition Abnormal operating condition Abnormal operating condition Abnormal operating condition Abnormal operating condition
Y Y
192.327(g)
Y Y Y
15
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
16
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart H - Customer Meters, Service Regulators, and Service Lines Scope Customer meters and regulators: Location. Customer meters and regulators: Protection from damage. Customer meters and regulators: Installation. Customer meter installations: Operating pressure. Service lines: Installation. Depth Support and backfill Grading for drainage Protection against strain and external loading Installation in buildings Service lines: Valve requirements. 192.351 192.353 192.355 N N Y Y Y Y Y Y Y N Y Y Y Y
Y Y
192.357 192.359
Meter installation
Y Y Y N N Y
Y Y Y
Service line O&M Service line O&M Service line O&M Service line O&M Service line O&M
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Construction versus O&M Construction versus O&M Construction versus O&M Construction versus O&M Construction versus O&M
Y Y Y N N Y
Y Y Y
17
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Service lines: Location of 192.365 valves. Service lines: 192.367 Requirements for connections to main piping. Service lines: Connections to cast iron or ductile iron.Steel. Service lines: Service lines: Cast iron and ductile iron. Service lines: Plastic. Service lines: Copper New service lines not in use. Service lines: Excess flow valve performance standards. Industry specification External protective coating Identification of excess flow valves Contaminants Location of excess flow valves 192.369 192.371 192.373 192.375 192.377 192.379 192.381
Y Y Y Y Y Y
Y Y Y Y
Y Y Y N N Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y
Service line O&M Service line O&M Service line O&M Service line O&M
N N Y N N Y Y Y Y N N Y Y Y Y
Y Y Y Y Y Y Y
18
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
192.383
N N Y
19
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart I Requirements for Corrosion Control Scope Applicability to converted pipelines. General. Buried or submerged pipelines installed after July 31, 1971 Protection from external corrosion External coating meeting 192.461 Cathodic protection system designed to meet this subpart Exemption from 192.455(a) Exemption from 192.455(a): Copper & temporary pipelines Externally coated pipeline Use of aluminum
N N Y N N Y N N Y
N Y Y
192.455(a) 192.455(a)(1) 192.455(a)(2) Corrosion control external Corrosion control external Corrosion control external Corrosion control external Corrosion control external External coating O&M Cathodic protection system O&M Monitor for corrosion Monitor for corrosion Cathodic protection system O&M Y Y Y Y Y Y Y Y Y Y Y Y
192.455(b) 192.455(c)
Y Y Y Y Y Y
Y Y Y Y
Y Y
192.455(d)
Y Y Y
Y Y
192.455(e)
N N Y
Specification
20
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Applicability to metal alloy fittings on plastic pipelinescorrosion External control: Buried or submerged pipelines Transmission lines
192.455(f) 192.457
N N Y
Specification
192.457(a)
Active corrosion pipelines other than cast and ductile iron Active corrosion pipelines other than cast and ductile iron Active corrosion Examination of buried pipeline when exposed. Examination of buried pipeline when exposed. External corrosion control: Protective coating. Application of coating Electrically insulating type coating
192.457(b)
192.457(b)
Cathodic protection system O&M Catodic protection system O&M Monitor for corrosion
Y Y Y
Y Y Y
Y Y
Y Y Y
Y Y
Y Y Y Y Y
Definition Y Y
Y Y Y
Y Specification
21
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Coating inspection
192.461(c)
Protection from damage 192.461(d) Protection from damage 192.461(e) External corrosion control: Cathodic protection. External corrosion control: Monitoring. Testing at intervals not exceeding 15 months Inspection of rectifiers or other impressed current power source Reverse current switch, diode, and interface bond check Remedial action to correct deficiencies Reevaluation of unprotected pipelines Reevaluation of unprotected pipelines 192.463 192.465 192.465(a) 192.465(b)
Y Y Y Y Y Y Y
Y Y Y Specification
Corrosion control external Corrosion control external Corrosion control external Corrosion control external Corrosion control external Corrosion control external
Monitor for corrosion Monitor for corrosion Monitor for corrosion Cathodic protection system O&M Monitor for corrosion Cathodic protection system O&M
Y Y Y Y Y Y
Y Y Y Y
Y Y
192.465(c)
Y Y Y
Y Y
192.465(d)
Y Y Y
Y Y
Y Y Y Y Y Y
Y Y Y Y
Y Y
22
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Corrosion control external Corrosion control external Corrosion control external Corrosion control external Corrosion control external
192.467(c)
Electrical isolation from 192.467(c) metallic casings, other measures Inspection and electrical 192.467(d) tests Installation of insulating device Proximity to fault currents corrosion External control: Test stations. External corrosion control: Test leads. Test lead connection 192.467(e)
Cathodic protection system O&M Cathodic protection system O&M Cathodic protection system O&M Cathodic protection system O&M Cathodic protection system O&M
Y Y Y
Y Y
Y Y Y
Y Y
Y Y Y
Y Y
Y Y Y
Y Y
Specification
192.467(f) 192.469 192.471 192.471(a) Corrosion control external Corrosion control external
N N Y N N Y
Y Y
Specification Specification
Y Y Y
Y Y
23
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Test lead attached to 192.471(b) minimize adverse affects Bared test lead and bared metallic area coating External corrosion control: Interference currents. Stray current program Impressed current type cathodic protection system installation Internal corrosion control: General provisions. Minimize internal corrosion of removed Inspection pipe Adjacent pipe Replacement Steps to minimize internal corrosion Storage of gas containing hydrogen sulfide in holders 192.471(c)
Y Y Y
Y Y
Y Y Y
Y Y
192.475 192.475(a) 192.475(b) 192.475(b)(1) 192.475(b)(2) 192.475(b)(3) 192.475(c) Corrosion control internal control Corrosion internal Corrosion control internal Corrosion control internal control Corrosion internal Pipeline O&M Monitor for corrosion Monitor for corrosion Pipeline O&M Pipeline O&M Y Y Y Y Y Y Y Y Y Y Y
Y Y Y
Y Y
N N Y
Specification
24
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
192.477
Y Y Y
Y Y
Evaluation of the coupons is not a covered task. However, activities to be able to insert and retrieve the coupons may be covered tasks.
Atmospheric corrosion control: General. Pipelines installed after July 31, 1971 Pipelines installed before August 1, 1971 Determine areas of atmospheric corrosion Take remedial action
192.479 192.479(a) 192.479(b) 192.479(b)(1) 192.479(b)(2) Corrosion control atmospheric Corrosion control atmospheric Corrosion control atmospheric Corrosion control atmospheric Corrosion control atmospheric Monitor for corrosion Pipeline O&M Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Corrosion control atmospheric External coating Y Y Y - O&M Y Y Y
Clean and coat or jacket 192.479(b)(3) Pipeline reevaluation Remedial action Remedial measures: General. Protective coating 192.481 192.481 192.483 192.483(a)
Y Y
25
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Cathodic protection
192.483(b)
Repaired pipe
192.483(c)
Y Y Y
Y Y
Y Y Y
Y Y
Remedial measures: Transmission lines. General corrosion: Transmission lines Localized corrosion pitting: Transmission lines Localized corrosion pitting: Transmission lines Localized corrosion pitting: Transmission lines Strength of pipe Remedial measures: Distribution lines General corrosion except cast iron or ductile iron General corrosion except cast iron or ductile iron Localized corrosion pitting
192.485 192.485(a) 192.485(a) 192.485(b) 192.485(b) 192.485(c) 192.487 192.487(a) 192.487(a) 192.487(b) Corrosion control Corrosion control Corrosion control Corrosion control Corrosion control Corrosion control Corrosion control Transmission line - O&M Pressure control Transmission line - O&M Pressure Control Y Y Y Y Y Y Y Y Y Y Y Y N N Y Y Y Y Y Y Y Y Y Y Specification
Y Y Y Y Y Y
26
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Remedial measures: Cast-iron and ductileiron pipelines. General graphitization Localized graphitization Corrosion control records.
192.489
Y Y Y Y N Specification
27
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart J - Test Requirements Scope. General Requirements. Operate a new segment or return to service a segment substantiate Tested to MAOP Potentially hazardous leak medium Test Hoop stress limitations Tie in joints Steel pipeline, hoop stress of 30 percent or more of SMYS. Strength testing in accordance with this section Compressor station, regulator station and measuring station Test duration 192.501 192.503 192.503(a) 192.503(a)(1) 192.503(a)(2) 192.503(b) 192.503(c) 192.503(d) 192.505 Pressure test Leak repair N N Y N N Y N N Y Y Y Y Y Y Y N N Y N N Y N N Y N N Y N N Y Y Y Y N N Y N Y Test medium specification Test hoop stress limitation specification Specifies tie in joints that do and do not require testing
Introduction
192.505(a)
Pressure test
Y Y Y
Y Y
192.505(b)
Pressure test
Y Y Y
Y Y
192.505(c)
Pressure test
Y Y Y
Y Y
28
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Manufacturer certified component other than pipe Preinstallation strength test Hoop stress less than 30 percent of SMYS, and at or above 100 p.s.i. Potentially hazardous leaks Test medium, 20 percent or more of SMYS Leak test Leak survey Test duration Test requirements for pipelines to operate below 100 p.s.i.g. Potentially hazardous leaks Test pressure Test requirements for service lines. Leak test
N N Y N N Y Y Y Y
Y Y Y Y Y
Leak repair
Y Y Y N N Y
Y Y Y Y Y Y Y Y Y Y Y
Y Introduction Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y
Pressure test
Y Y Y
Y Y
29
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Service line intended to be operated at a pressure of at least 1 p.s.i. but not more than 40 p.s.i. line intended to Service be operated at a pressure of more than 40 p.s.i. Test requirements for plastic pipelines. Tested in accordance with this section Potentially hazardous leaks Test pressure Temperature of thermoplastic material Environmental protection and safety requirements. Safety requirements Environmental requirements Records.
192.511(b)
Pressure test
Y Y Y
Y Y
192.511(c)
Pressure test
Y Y Y
Y Y
Y Y Y Y Y Y Y Y Y
N N N
30
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart K - Uprating Scope. General requirements. Pressure increases Check for leaks Repair of leaks Records Written plan Limitation on increase in MAOP Hoop stress of 30 percent or more of SMYS in steel pipelines. Requirements of this section Review of design, operating, and maintenance and testing Repairs, replacements or alterations Repairs, replacements or alterations Pipeline constructed before September 12, 1970 192.551 192.553 192.553(a) 192.553(a)(1) 192.553(a)(2) 192.553(b) 192.553(c) 192.553(d) 192.555 N N Y Pressure Control Leak survey Leak repair Y Y Y N N N Y Y Y N N N Y Y Y Y Y Y N Y Y Y Y Y Y N Y Y Y Y Y Record keeping Procedure Specification
192.555(a) 192.555(b)(1)
N N Y N N Y
Y Y
Y Y Y Y Y Y N N Y
Y Y Y Y Y
Y Y
31
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Not qualified under paragraph (c) Not qualified under paragraph (c) Increase in increments Hoop stress less than 30 percent of SMYS Requirements of this section
Pressure test
Y Y Y N N Y
Y Y Y Y Y
Pressure control
Y Y Y
N N Y
Y Y Y Y Y
Review of design, operating, and maintenance history Leakage survey Leakage survey Repairs, replacements, or alterations Repairs, replacements, or alterations Repairs, replacements, or alterations Reinforce or anchor offsets, bends and dead ends
192.557(b)(1)
N N Y
Leak survey Leak repair Main O&M Service Line O&M Transmission Line O&M Main O&M
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y
32
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Reinforce or anchor offsets, bends and dead ends Isolation Service regulators Increase in increments Incomplete records for cast iron or ductile iron pipelines Measure actual cover
192.557(b)(4)
Y Y Y
Y Y
Y Y Y N
Y Y Y N
Y Y Y Y
Y Y Y Y Y Y Y
Y Y
192.557(d)(2)
Y Y Y
Y Y
The act of taking or making the measurement is not a covered task. However, activities to be able to take or make the measurement may be covered tasks. The act of determining the wall thickness is not a covered task. However, activities to be able to take the measurement may be covered tasks. Specification
Y Y Y
Y Y
N N Y
33
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart L - Operations Scope. General provisions. Operation in accordance with this subpart Records Required amendment to plan Procedural manual General. Operating, maintaining and repairing the pipeline Controlling corrosion in accordance with Subpart I Availability of construction records, maps, operating history Gathering data for incident reporting Starting up and shutting down any part of the pipeline Maintaining compressor stations, including isolation and purging 192.601 192.603 192.603(a) 192.603(b) 192.603(c) 192.605 192.605(a) 192.605(b)(1) 192.605(b)(2) 192.605(b)(3) N N Y N N Y Y Y Y Y Y N N Y N N
Y N Y N N Y N N Y N N Y
N N N N
Y N Y Y Y Y
N Y Y Y
192.605(b)(6)
Y Y Y
34
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Starting, operating and shutting down compressor units Periodic review of work done by operating personnel Precautions in excavated trenches Testing and inspection of pipe-type and bottle-type holders Detection of external corrosion Sampling and testing of gas
192.605(b)(7)
Y Y Y
192.605(b)(8)
Y N Y
192.605(b)(9) 192.605(b)(10)
Y Y Y
Y Y Y Y Y Y
Y Y Y Y
Y Y Determination of dew point is not a covered task. However, activities to obtain the sample may be covered tasks. Y
Pressure limiting devices 192.605(b)(iii) Abnormal operation, 192.605(c) transmission lines Recognition of potential 192.605(d) safety-related conditions Surveillance, emergency 192.605(e) response, and accident investigation
Pressure control device maintenance Abnormal operations remedial action Emergency response
Y Y Y Y Y Y Y Y Y N N Y
Y Y Y Y Y
Y Y Y
35
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Reserved Change in class location: Required study Confirmation or revision of MAOP Hoop stress not commensurate with present class location MAOP if segment previously tested in place Corresponding hoop stress in accordance Testing with Subpart J Establishing MAOP Confirmed or revised MAOP may not exceed previous MAOP Application of 192.553 & 192.555 Confirmation or revision of MAOP with 18 months Pipelines in the Gulf of Mexico and its inlets. Inspection between October 3, 1989 and November 16, 1992
N N Y
N N Y
N N Y N N Y N N Y N N Y N N Y
Y Y Y Y Y
N N Y N N Y
Y Y
Y Y N
36
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Notification, marking and placement Continuing surveillance. Procedure for surveillancerecondition, Program to phase out, or reduce the MAOP Damage prevention program. Implementation of written damage prevention program Written program contents Participation in one call system Identification of excavators General notification Receiving and recording notification of planned excavations Notification of type of temporary markings and how to identify Temporary marking of buried pipelines in area of excavation
N N Y
N N Y N N Y
Y Y Y
192.614 192.614(a) N N Y Y
N N Y N N Y N N Y N N Y
Y Y Y Y
192.614(c)(4)
N N Y
192.614(b)(5)
Locate pipe
Y Y Y
Y Y
37
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Inspection for damage Leak survey Damage prevention program not required Pipelines operated by persons other than municipalities Emergency plans. Written procedures Receiving, identifying and classifying notices of events Establishing and maintaining communication Prompt and effective response to a notice Availability of personnel, equipment, tools, and materials Protecting people first and then property Emergency shutdown and pressure reduction
192.614(b)(6)(i Inspect third party ) excavation 192.614(b)(6)(ii Leak survey ) 192.614(d) 192.614(e)
Y Y Y Y Y Y N N Y N N Y
Y Y Y Y N N
Y Y
N N Y
192.615(a)(2)
N N Y
192.615(a)(3) 192.615(a)(4)
Y Y Y N N Y
Y Y Y
Y Y Y Y Y Y
N Y Y Y
38
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Making safe any actual or potential hazard Notification and coordination with public safety officials Safely restoring any service outage Action under 192.617 Furnish procedures, training and review of emergency response Liaison with public officials Public education. Investigation of failures. MAOP: steel or plastic pipelines. MAOP Over-pressure protective devices Highest actual operating pressure MAOP: high pressure distribution systems MAOP Over-pressure protective devices
192.615(a)(7) 192.615(a)(8)
N N Y Y N Y
N N
Service restoration
Y Y Y N N Y N N Y
Y Y N Y
192.615(c) 192.616 192.617 192.619 192.619(a) 192.619(b) 192.619(c) 192.621 192.621(a) 192.621(b) Pressure control Pressure control
N N Y N N Y N N Y
Y Y Y
Y Y Y N N Y Y Y Y
Y Y Y Y Y
Pressure control
Y Y Y N N Y
Y Y Y
39
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Low-pressure distribution systems. Maximum allowable operating pressure Minimum allowable operating pressure Odorization of gas. Distribution lines Transmission lines in Class 3 or Class 4 location requirements Odorant Odorant solubility Equipment for odorization Periodic sampling Tapping pipelines under pressure. Purging of pipelines.
192.623 192.623(a) 192.623(b) 192.625 192.625(a) 192.625(b) 192.625(c) 192.625(d) 192.625(e) 192.625(f) 192.627 192.629 Pressure control Pressure control Y Y Y Y Y Y Y Y Y Y
Odorization Odorization
Y Y Y Y Y Y N N N Y Y N N N Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y
Y Y Y
40
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Subpart M Maintenance Scope. General. Maintenance in accordance with this Subpart Repair, replacement or removal of unsafe pipeline segments Repair, replacement or removal of unsafe pipeline segments Prompt repair of hazardous leaks Transmission lines: Patrolling Transmission lines: patrol program Patrol frequency Patrol methods Transmission lines: Leakage surveys. Line markers for mains and transmission lines.
N N Y N N Y
N N
192.703(b)
Main O&M
Y Y Y
Y Y
192.703(b)
Y Y Y
Leak repair
Y Y Y
Y Y
Transmission Line Patrolling Transmission line patrols Leak survey Transmission Line Main O&M
Y Y Y N N Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y
Y Y
41
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Line markers for mains and transmission lines. Transmission lines: Record keeping. Transmission lines: General requirements for repair procedures. Transmission lines: Field repair of imperfections and damages. Transmission lines: Permanent field repair of welds. Transmission lines: Permanent field repair of leaks. Transmission lines: Testing of repairs. Testing of replacement pipe in place Testing of replacement pipe, prior to installation Testing of repairs made by welding Testing of repairs made by welding
Y Y Y Y Y Y
Y N Y
Y Y Y
192.713
Y Y Y
192.715
Welding
Y Y Y
192.717
Leak repair
Y Y Y
192.719 192.719(a) 192.719(a) 192.719(b) 192.719(b) Welding - Visual inspection Welding - NDE Pressure test Y Y Y N N Y Y Y Y Y Y Y Y Y Y Y Y Y
42
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Distribution system: Patrolling. Patrol frequency Patrolling Anticipated movement patrolling Distribution system: Leakage surveys. Provision for periodic leakage surveys Business district leakage surveys Leakage surveys outside business districts Test requirements for reinstating service lines Testing of disconnected service lines before reinstatement Testing of temporarily disconnected services lines before reinstatement or Abandonment deactivation of facilities.
192.721 192.721(a) 192.721(a) 192.721(b ) 192.723 192.723(a) 192.723(b)(1) 192.723(b)(2) 192.725 192.725(a) Pressure test Service lines Y Y Y Y Y Leak survey Leak survey Distribution Leak survey Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Distribution system: Patrolling Distribution system: Patrolling Distribution system: Patrolling N N Y Y Y Y Y Y Y Y Y Y Y Y Y
192.725(b)
Pressure test
Y Y Y
Y Y
192.727
43
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Abandonment or discontinuance in accordance with this section Abandonment in place Abandonment in place Abandonment in place
192.727(a)
N N Y
Inactive pipelines, except 192.727(c) service lines Inactive pipelines, except 192.727(c) service lines Service discontinuance 192.727(d) Purging with air Abandoned vaults Compressor stations: Inspection and testing of relief devices. Inspection and testing of pressure-relieving devicesor replacement of Repair defective or inadequate equipment 192.727(e) 192.727(f) 192.731
Transmission line O&M Abandonment in place Service line O&M Abandonment in place Main O&M Abandonment in place Main O&M Inactivation of main Transmission line O&M Inactivation of transmission line Service line O&M Service discontinuance Purging
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y N
192.731(a) 192.731(b)
Y Y Y Y Y Y
Y Y
Y Y
44
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Inspection and testing of 192.731(c) remote control shutdown devices Compressor stations: 192.735 storage of combustible material. Limits on quantity of 192.735(a) flammable and combustible material stored Above ground oil and gasoline storage Compressor buildings: Gas detection. Requirement for fixed gas detection and alarm system Continuous monitoring and warning Gas detection system maintenance and performance test Pressure limiting and regulating stations: Inspection and testing. 192.735(b) 192.736 192.736(a)
Y Y Y
N N Y
N N Y
Y N Y
192.736(b) 192.736(c) Maintain gas detection system Pressure control device maintenance
Y N Y Y Y Y
Y Y Y
192.739
Y Y Y
Y Y
45
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Telemetry or recording gauges. Distribution system more than one district pressure regulating station Distribution system single district pressure regulating station Abnormally high or low pressure Testing of relief devices Testing in place, if feasible Testing not feasible Insufficient capacity of relieving device Valve maintenance: Transmission lines. Valve maintenance: Distribution systems. Vault maintenance. Inspection Inspection of equipment if gas found Ventilation equipment inspection
192.741 192.741(a) N N Y Y
192.741(b)
N N Y
192.741(c) 192.743 192.743(a) 192.743(b) 192.743(c) 192.745 192.747 192.749 192.749(a) 192.749(b) 192.749(c)
Pressure control device maintenance Pressure control device maintenance Pressure control device maintenance Valve maintenance transmission Valve maintenance distribution Vault maintenance Pressure control device maintenance Vault maintenance
Y Y Y
Y Y
Y Y Y N N Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y
Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y
Y Y Y
46
8/13/2012
Draft
Title/Description
49CFR192 Rule
Covered Task
Subtask
O&M Task
LDC Tran
Notes
Vault cover inspection Prevention of accidental ignition. Steps to minimize accidental ignition of gas Gas vented into open air Gas or electric welding and cutting Warning signs Caulked bell and spigot joints. Sealing when pressure is more than 25 p.s.i.g. Sealing of exposed joints subject to pressure of 25 p.s.i.g. or less Protecting cast-iron pipelines. Protection during disturbance Permanent protection for disturbed segment
192.749(d) 192.751 192.751 192.751(a) 192.751(b) 192.751(c) 192.753 192.753(a) 192.753(b) Joining cast iron pipe Joining cast iron pipe Prevention of accidental Split Mains, ignition. Service, Trans Purging Welding Prevention of accidental Split Mains, ignition. Service, Trans
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y
Y Y Y Y Y Y
Y Y Y Y
192.755 192.755(a) 192.755(b) Support of cast iron pipe Support of cast iron pipe Y Y Y Y Y Y Y Y Y Y Y Y