This 3 sentence summary provides the key details from the plastering checklist document:
The document is a checklist for plastering work that includes 9 items to check such as ensuring the correct plastering materials are being used, that mechanical, electrical, and plumbing clearances have been obtained, and that plaster accessories like corner beads and expanded mesh have been properly installed before plastering begins. The checklist also includes checks for the plastering finish, alignments, and right angles at corners and openings as well as ensuring curing arrangements are in place after plastering is complete. Representatives from both the contractor and customer are required to sign off on the checklist to confirm the plastering work meets specifications.
This 3 sentence summary provides the key details from the plastering checklist document:
The document is a checklist for plastering work that includes 9 items to check such as ensuring the correct plastering materials are being used, that mechanical, electrical, and plumbing clearances have been obtained, and that plaster accessories like corner beads and expanded mesh have been properly installed before plastering begins. The checklist also includes checks for the plastering finish, alignments, and right angles at corners and openings as well as ensuring curing arrangements are in place after plastering is complete. Representatives from both the contractor and customer are required to sign off on the checklist to confirm the plastering work meets specifications.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als XLS, PDF, TXT herunterladen oder online auf Scribd lesen
This 3 sentence summary provides the key details from the plastering checklist document:
The document is a checklist for plastering work that includes 9 items to check such as ensuring the correct plastering materials are being used, that mechanical, electrical, and plumbing clearances have been obtained, and that plaster accessories like corner beads and expanded mesh have been properly installed before plastering begins. The checklist also includes checks for the plastering finish, alignments, and right angles at corners and openings as well as ensuring curing arrangements are in place after plastering is complete. Representatives from both the contractor and customer are required to sign off on the checklist to confirm the plastering work meets specifications.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als XLS, PDF, TXT herunterladen oder online auf Scribd lesen
GTC/371A/2010 QATAR POWER TRANSMISSION SYSTEM EXPANSION PHASE 10 SUBSTATIONS PACKAGE S1,S2 AND S6
CHECKLIST FOR PLASTERING Date : SRUCTURE: Drawing no: Description of Checks
1. 2. 3. 4. 5 6 7 Plastering 'Materials as per approval MEP Clearance for plastering taken Mortar Machine available with spares & connected to water supply Level pads, plaster accessories fixed before start of plastering Fill the joint gaps (if any) of block works Apply specified key coat to concrete surfaces Corner beads, expanded mesh fixed as necessary at joint between concrete and masonry and corners / edges Plastering finish, evenness, alignment checked Right angle at wall /floor corners, openings checked Curing arrangement for plastering work done