Estimate for attending the HTUG Cable Fault between O.T.Pete Unique Plaza RMU and ABB make RMU Feeder of F09, 'VHS' Station in O&M-13, W4 Sub Division, BESCOM, Bangalore.
SL No
Qty
Unit
Rate
Klip Seal make Tapex type Transition jointing kits 1 for PILC/XLPE cable with Copper lugs & Al ferrules OF Size 3x95 SqMM. 2 Miscellaneous Materials Total Material Charges
Set
9,000.00
ABSTRACT
1 2
3
Rs. Rs. Rs. Rs. Ninteen Thousand Six Hundred And Ninty only
Certificate: Certified that I have personally visited the spot and prepared this estimate in most economical and saf the work as per current SR.
Report: The above estimate amounting to Rs.9690.00 only has been prepared for attending the HTUG Cable Fa Plaza RMU and O.T.Pete ABB RMU, F09 Feeder of VHS Station in O&M-13, W4 Sub Division, BESCOM, Banga tapex type cable joint is made provisional due to the existing cable joint place has always been effected by wastage Hence the estimate may kindly be sanctioned . Fault Occurred on : 25 /12/11 MPD Staff detect the Fault on : 26 /12/11 Fault attended by making CableJoint on : 27 /12/11
Asst Executive En
COMPANY
Amount
Material Code
9,000.00
Market Price
500.00 9,500.00
9500.00 190.00
9,690.00
inty only
ding the HTUG Cable Fault between Unique vision, BESCOM, Bangalore.In this estimate been effected by wastage water.
Estimate for attending the HTUG Cable Fault between SVS RMU and Ganzaam RMU at BVKI road Feeding from the Feeder of F21, 'A' Station in O&M-13, W4 Sub Division, BESCOM, Bangalore.
SL Name of the Material Unit Qty Rate No Heat Shrinkable Transition jointing kits for PILC 1 cable with Copper lugs & Al ferrules OF Size 3x95 Set 1 6,388.00 SqMM. 2 Miscellaneous Materials Total Material Charges 3 Labour Charges
Providing and laying granite basalt or trap jelly cement concrete 1:2:4 proportion using 20 mm and down size jelly including Mixing a. laying Tamping. Curing and finished for exposed faces with necessary centering and form work etc., complete.
b. Miscellaneous Materials/Labours TOTAL LABOUR CHARGES
CMT
3,820.00
7,640.00
L/s
500.00 8,140.00
ABSTRACT 1 Materials Cost 2 Labour Charges 3 Service Tax @ 10.30% on Total Labour Charges (2+3) Rs. Rs. Rs. Rs. Rs. Rs. 6,888.00 8,140.00 838.42 300.56 814.00 16,980.98
4 Contingencies @ 2% on Total material & labour 5 Employees cost @ 10% on total labour Charges Total Cost of Estimate in Rs.
Rs. Sixteen Thousand Nine Hundred And Eighty One Only only
Certificate: Certified that I have personally visited the spot and prepared this estimate in most economical and safe way of executing the work as per current SR.
Cable Fault Occurred On :19/09/11 MPD Staff detect the fault on : 20/09/11
Report: The above estimate amounting to Rs.16981.00 only has been prepared for attending the HTUG Cable Fault between SVS RMU and Ganzam RMU, F21 Feeder of A Station in O&M-13, W4 Sub Division, BESCOM, Bangalore. Hence the estimate may kindly be sanctioned .
Asst Executive Engineer (Ele) W4 Sub Division, BESCOM AnandaRao Circle, Bangalore
NY
Engineer (Ele)
ion, BESCOM
cle, Bangalore
Estimate for attending the HTUG Cable Fault between DK Lane RMU and Dinesh Jain LBS at DK Lane,Opposite to SBS Jain Complex Feeding from the Feeder of F27, 'A' Station in O&M-13, W4 Sub Division, BESCOM, Bangalore.
Unit Qty
Rate
Amount
Heat Shrinkable Transition joint kit for XLPE 1 cable with Copper lugs & Al ferrules OF Size 3x95 Set SqMM. 2 Miscellaneous Materials
6,388.00
6,388.00
500.00
6,888.00
3 Labour Charges
Sub Total
4,320.00
ABSTRACT
1 Materials Cost
Rs.
6,888.00
2 Labour Charges
Rs.
4,320.00
Rs.
444.96
Rs.
224.16
Rs.
432.00
Rs.
12,309.12
Certificate: Certified that I have personally visited the spot and prepared this estimate in most economical and safe way of executing the work as per current SR.
Report: The above estimate amounting to Rs.12309.00 only has been prepared for attending the HTUG Cable Fault between DK Lane RMU and Dinesh Jain LBS, F27 Feeder of A Station in O&M-13, W4 Sub Division, BESCOM, Bangalore.This fault has occured on 22-08-2011.The MPD Staff has located the fault on 28.08.2011 Hence the estimate may kindly be sanctioned .
BESCOM, Bangalore
ANY
e in most economical
vision, BESCOM
Circle, Bangalore
Estimate for attending the HTUG Cable Fault between Datta RMU and Balekaimandi RMU at BVK Iyangar Road Feeding from the Feeder of F7, 'VHS' Station in O&M-13, W4 Sub Division, BESCOM, Bangalore.
SL Name of the Material No Heat Shrinkable Transition joint kit for XLPE 1 cable with Copper lugs & Al ferrules OF Size 3x400 SqMM. 2 Miscellaneous Materials Total Material Charges 3 Labour Charges a.
Rate 8,040.00
Providing and laying granite basalt or trap jelly cement concrete 1:2:4 proportion using
1.5
CMT L/s
ABSTRACT 1 Materials Cost 2 Labour Charges 3 Service Tax @ 10.30% on Total Labour Charges (2+3) Rs. Rs. Rs. Rs. Rs. Rs. 16,580.00 6,230.00 641.69 456.20 623.00 24,530.89
4 Contingencies @ 2% on Total material & labour 5 Employees cost @ 10% on total labour Charges Total Cost of Estimate
Certificate: Certified that I have personally visited the spot and prepared this estimate in most economical and safe way of executing the work as per current SR.
Report: The above estimate amounting to Rs.24531.00 only has been prepared for attending the HTUG Cable Fault between Datta RMU and Balekaimandi RMU, F7 Feeder of 'VHS' Station in O&M-13, W4 Sub Division, BESCOM, Bangalore. Hence the estimate may kindly be sanctioned .
Asst Executive Engineer (Ele) W4 Sub Division, BESCOM AnandaRao Circle, Bangalore
ANY
e in most economical
vision, BESCOM
Circle, Bangalore
Estimate for attending the HTUG Cable Fault between SVS RMU and Ganzaam RMU at BVKI road Feeding from the Feeder of F21, 'A' Station in O&M-13, W4 Sub Division, BESCOM, Bangalore. SL Name of the Material No Heat Shrinkable Transition jointing kits for PILC 1 cable with Copper lugs & Al ferrules OF Size 3x95 SqMM. 2 Miscellaneous Materials Total Material Charges 3 Labour Charges
Qty
Sub Total
Providing and Laying Granite or Basalt or trap jelly concrete 1:4:8 proporation using 40 mm and down size jelly for foundation laid in a. 15 cm thick layers and well compacted CMT including curing complete (including material rate for cement , jelly, sand and labours)
b. Miscellaneous Materials/Labours TOTAL LABOUR CHARGES ABSTRACT 1 Materials Cost 2 Labour Charges 3 Service Tax @ 10.30% on Total Labour Charges (2+3) L/s
2,868.00
5,736.00
500.00 6,236.00
4 Contingencies @ 2% on Total material & labour 5 Employees cost @ 10% on total labour Charges Total Cost of Estimate in Rs.
Rs.Fourteen thousand Six hundred Fifty Two only Certificate: Certified that I have personally visited the spot and prepared this estimate in most economical and safe way of executing the work as per current SR. Report: The above estimate amounting to Rs.14652.00 only has been prepared for attending the HTUG Cable Fault between SVS RMU and Ganzam RMU, F21 Feeder of A Station in O&M-13, W4 Sub Division, BESCOM, Bangalore. Hence the estimate may kindly be sanctioned .
Report: The above estimate amounting to Rs.14652.00 only has been prepared for attending the HTUG Cable Fault between SVS RMU and Ganzam RMU, F21 Feeder of A Station in O&M-13, W4 Sub Division, BESCOM, Bangalore. Hence the estimate may kindly be sanctioned .
Asst Executive Engineer (Ele) W4 Sub Division, BESCOM AnandaRao Circle, Bangalore
ANY
e in most economical
Estimate for attending the HTUG Cable Fault between Datta RMU and Balekai Mandi RMU Feeding from the Feeder of F7,VHS MUSS in O&M-13, W4 Sub Division, BESCOM, Bangalore. SL Name of the Material No Heat Shrinkable Straight through jointing kits for 1 PILC cable with Copper lugs & Al ferrules OF Size 3x400SqMM. 2 Miscellaneous Materials TOTAL MATERIAL CHARGES 3 Labour Charges
Qty
SUB TOTAL
Providing and Laying Granite or Basalt or trap jelly concrete 1:4:8 proporation using 40 mm and down size jelly for foundation laid in a. 15 cm thick layers and well compacted CMT including curing complete (including material rate for cement , jelly, sand and labours)
b. Miscellaneous Materials/Labours TOTAL LABOUR CHARGES ABSTRACT 1 Materials Cost 2 Labour Charges 3 Service Tax @ 10.30% on Total Labour Charges (2+3) L/s
2,868.00
5,736.00
500.00 6,236.00
4 Contingencies @ 2% on Total material & labour 5 Employees cost @ 10% on total labour Charges Total Cost of Estimate in Rs.
Rs.THIRTEEN THOUSAND NINE HUNDRED AND TWENTY TWO only Certificate: Certified that I have personally visited the spot and prepared this estimate in most economical and safe way of executing the work as per current SR.
Report: The above estimate amounting to Rs.6295.44 only has been prepared for attending the HTUG Cable Fault between Datta RMU and Balekaimandi RMU, F7 Feeder of VHS MUSS in O&M-13, W4 Sub Division, BESCOM, Bangalore. Hence the estimate may kindly be sanctioned .
Report: The above estimate amounting to Rs.6295.44 only has been prepared for attending the HTUG Cable Fault between Datta RMU and Balekaimandi RMU, F7 Feeder of VHS MUSS in O&M-13, W4 Sub Division, BESCOM, Bangalore. Hence the estimate may kindly be sanctioned .
Asst Executive Engineer (Ele) W4 Sub Division, BESCOM AnandaRao Circle, Bangalore
submitted
ANY
in most economical
Estimate for attending the 3x95 SqMM Outdoor type HT Cable termination Fault of DTC 32,250kVA O.T.Pete feeding from the Feeder of F14, 'A' Station in O&M-13, W4 Sub Division, BESCOM, Bangalore. SL No 1 2 Material Code 288302
Name of the Material Heat Shrinkable Outdoor type cable termination kit for XLPE cable Miscellaneous Materials Total Material Charges
Qty 1
Unit Set
Rate 2,212.00
ABSTRACT
1 2
3
Certificate: Certified that I have personally visited the spot and prepared this estimate in most economical and saf way of executing the work as per current SR.
Report: The above estimate amounting to Rs.9690.00 only has been prepared for attending the HTUG Cable Fa between Unique Plaza RMU and O.T.Pete ABB RMU, F09 Feeder of VHS Station in O&M-13, W4 Sub Divis BESCOM, Bangalore.In this estimate tapex type cable joint is made provisional due to the existing cable joint pl has always been effected by wastage water. Hence the estimate may kindly be sanctioned . Fault Occurred on : 25 /12/11 MPD Staff detect the Fault on : 26 /12/11 Fault attended by making CableJoint on : 27 /12/11
ANY
2412.00 48.24
9,690.00
ng the HTUG Cable Fault &M-13, W4 Sub Division, existing cable joint place
Asst Executive Engineer (Ele) W4 Sub Division, BESCOM AnandaRao Circle, Bangalore