Performa for Submitting Energy Audit Report Name and address of the Energy Audit Firm Descon Limited

Plot No. X 1, 2 & 3, Block EP, Sector-V, Salt Lake City, Kolkata- 700 091 Tel: (033) 2357-7015, Fax- (033) 2357 3758 e-mail dsanyal@desconsoft.com Mr. S. Radhakrishanan Managing Director DPSC Limited Plot No. X 1, 2 & 3, Block EP, Sector-V, Salt Lake City, Kolkata- 700 091 Tel: 033 23577016 (D) (033) 2357-4308 to 10, Fax 033 23575678 E mail- srk@dpscl.com Mr. Subhendu Poddar General Superintendent Chinakuri Thermal Power Station Vill Radhanagar Post Sunderchalk Dist- Burdwan Ph. No 0341 2510648(D), 2511932 & 2510520 (EPBX) Fax No 0341 2510465 E-mail subhendupoddar@dpscl.com Chinakuri Thermal Power Station was established in the year of 1990 to generate 20 MW electricity with 2 TG sets of 10 MW each and 3 nos. 50 TPH at 60 kg/cm2 Coal Fired Stoker Boiler. From Feb 2003 onwards with another installation of a TG set of 10 MW plant is now running with a generation of 30 MW. The average energy generation in the year 03-04 to 04-05 196548470-unit/ year with a plant load factor of 75% (avg.). Auxiliary power consumption of the 8.7% in the year 2004-05. In order to improve the generation efficiency, DPSC Limited assigned Descon Limited to conduct Detailed Energy Audit of the plant. During the Energy Audit various aspects of the generation and connected issues were analyzed Power Generation Detailed Energy Audit December2005-February 2006

Name and address of the organization & contact persons

Name and address of the contact persons, where the energy audit was carried out

Background of the Industry

Sector Scope of the Work Duration of the energy audit

Details of equipment for which energy audit was undertaken

1. Boiler: Coal fired Spreader Stoker


Boilers 3 nos. 50 tph, 60 kg/cm2 with auxiliaries and coal handling plant 2. Turbine: Turbine with HP & LP extraction 3 nos. of 10 MW each with auxiliaries 3. Cooling Towers with 2500 m3/hr discharge at 26 OC 4. Auxiliary power distribution system

Quantified benefits to the industry

Install Energy Efficient Flat Belt In Compress with a savings of 19094 kWh Install Energy Saver Cum Soft Starter in Boiler SA Fan with a savings of 27521 kWh Install Soft Starter Cum Cyclic Energy Saver in Boiler ID Fan with a savings of 43290 kWh

List of the suggested equipments to the Industry

Install Energy Efficient Flat Belt in Compressor Install Energy Saver Cum Soft Starter in Boiler SA Fan Install Soft Starter Cum Cyclic Energy Saver in Boiler ID Fan Install Energy Efficient Flat Belt in Compress with an investment of Rs 68,000/-, payback period 23 Months Install Energy Saver Cum Soft Starter in Boiler SA Fan with an investment of Rs 70,000/-, payback period 16 Months Install Soft Starter Cum Cyclic Energy Saver in Boiler ID Fan with an investment of Rs 1,20,000/-, payback period 28 Months Replacement of Fluorescent Tubes by energy efficient Trulite To control the excess air the most common method is the continuous oxygen analyzer with a local readout mounted draft gauge by which the operator can adjust air flow Increase Turbine efficiency by cleaning of condenser tube, Concrete or hard base save carpet loss for coal

Overall Recommendation to The Industry