The workshop was attended by over 45 people mostly from private sector working on CDM projects (List of participants is in the annex 1 where participants who returned feedback form is indicated). Out of all the participants, only 25 returned the feedback form to us. In the feedback form, we asked questions related to 1) assessment of the workshop (presentations, discussions and distributed materials), 2) future topic to be covered in capacity building workshop, 3) possible means of capacity building. Below is the summary of feedbacks collected. 1)To assess usefulness of the workshop, we requested participants to rate presentations, discussions and distributed materials on scale from 1-5 in increasing order (1-low, 5 very good) as well as to indicate ones which they found most useful. Average points given to each item (presentation, discussion and distributed materials) was well over 4 point. (4.57 for distributed materials, 4.2 for discussion, 4.47 for presentations respectively). About 20-30% of the respondents indicated their view on most useful presentations. And the rest didnt indicate any particular presentation.
No 1 2 3 4 5 6 Name of the presentation CDM Beyond 2012, IGES PDD Experience NEWCOM Standardized baseline, IGES Tax on CER, Energy authority Case study on SB , IGES ERPA 32% 28% 16% 16% 16% 12%
About 20% of the respondents indicated CDM in Charts as most useful distributed material while the rest, though rated distributed materials as good, didnt specify any particular material. 2) Regarding the question on possible topics for future workshop, various topics are suggested by the respondents.
No Future topics suggested 1 2 3 4 6 7 8 9 10 11 12 Standardized Baseline (potential and way to do it) Project development roadmap (practical steps) ERPA, finding buyer, contracts, DD (checklist for Due Diligence, how to find buyer, when to conclude ERPA) Selecting consulting or consulting company (Where to be careful, how to design the ToR) Financing of CDM projects Analysis of CDM characteristics by sectors CDM cost estimate (from PDD development until CER issuance) Baseline (how to establish baseline with more example) PDD writing Afforestation and reforestation CDM CDM beyond 2012 (price projection of CERs)
Percent of total respondents (25) who suggested the topic
12% 32% 36% 20% 48% 12% 20% 12% 12% 4% 40%
13 14 15 16
Update on CDM rules and regulations PoA Gold standard (Benefits and costs, what type of project is more suitable) Tax on CER (Taxation of CER in other countries)
3) Regarding the mode of capacity building, most of the respondents answered practical capacity building workshops as very useful while few people suggested other means of capacity building such as development of web based platform among project developers to facilitate further experience sharing as well as preparing and airing TV program on CDM to raise awareness. Also a number of respondents (around 5) suggested DNA to give advice to project developers and assist them in finding consultant as well as buyer.
Annex 1. List of participants who attended CDM project development experience sharing workshop on rd 3 November
1 Name Dagvadorj.D Position Chair of CCCO Organization Ministry of Nature, Environment and Toursim Ministry of Nature, Environment and Toursim Ministry of Nature, Environment and Toursim Yes Ulaanbaatar city authority Feedback form
Tsendsuren.B
Bat-Ulzii.B
4 5 6 7 8
Adiya.B
Yes Yes
Davaanyam. R Lhagvasuren. G
Bayarsaikhan Achit. M Bat-Erdene. B
Sainshand Wind Park LLC Ekh oron tsever baigali LLC Ekh oron tsever baigali LLC
Anodpower LLC Anodpower LLC Yes
Yes
Officer Officer Project Managar Project Manager General Engineer Expert Engineer
Manager
Mongolyn Alt Corporation Mongolyn Alt Corporation Envenco LLC Bridge group Usny Erchim LLC Mon-Energy LLC
MCS holding
Yes
26
Altantsetseg. D Bayarmaa. A
Dorjpurev. J Buyanbat.L Bayarsaikhan Enkhmanlai.G
Sustainable development fund for global air pollution reduction Newcom LLC
EEC LLC
Yes
27 28 29 30 31
Yes
Yes
Envenco LLC
MCS DME project Clean Production and Development NGO
Yes
32 33 34 35 36 37 38
Kazuhisa KOAKUTSU Mitsumasa MISAKI Yuriko KOYANAGI Osamu BANNAI Mitsumasa MISAKI Akeo Fukayama
Senior Researcher Deputy Director Programme Officer Assistant Resercher Programme Officer Programme Officer Deputy General Manager
Institution for Global Environmental Strategies (IGES) Global Environment Centre Foundation (GEC) Institution for Global Environmental Strategies (IGES) Global Environment Centre Foundation (GEC) Global Environment Centre Foundation (GEC) Suuri Keikaku Co.,ltd
Yes
39 40
41 42 43 44 45 46 47 48
Yes
Yes
UB City air quality office National Development and Innovation Committee National renewable energy center Trade and Development Bank of Mongolia Qleantech LLC Tree Global Inc Yes Yes Yes Yes