EXAMPLE FOR PLOTTING CONTROL CHARTS AS THE PROCESS OF STATISTICAL ANALYSIS OF CONCRETE CUBE RESULTS - M30 28days Comp.

Str. of each set 30.54 37.00 33.63 33.19 33.93 34.07 30.44 30.74 29.93 34.22 34.67 29.19 29.33 32.89 29.93 30.96 30.52 31.11 28.30 33.93 33.19 29.48 30.78 31.74 2.184 As per Good Acceptable Industry Practise limits (As per IS 456) UCL UWL 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 26.00 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 36.55 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37 34.37

No

Fck

TMS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00 30.00

33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36 33.36

STANDARD DEVIATION

Get the standard deviation directly using =(stdev num1,.num n)

Notes Abbreviation Description Characteristic Strength (M30) Target Mean Strength (Fck+1.64*SD) Fck - 4 (Fck + 3 * SD) (Fck + 2 * SD) (Fck - 2 * SD) or (Fck - 4)
If a margin of (3 * SD) is adopted there is very little chance of a result falling outside this limit due to natural variation The probability of two consecutive results falling oustide the warning limits is only 0.21% if we adopt (2*SD) Whichever is higher

How to arrive

Remarks

Fck TMS

Accep. Limits Acceptable limits UCL UWL LWL Upper Control Limit Upper Warning Limit Lower Warning Limit

PROGRESS CHART SHOWING THE COMPRESSIVE STRENGTH RESULTS OF CONCRETE CUBE


40

UCL
UWL
28days Comp. Str.

TMS Fck
30

Comp.strength

Accep. Limits

20

11

13
Sample No.

15

17

19

21

23

Characteristic strength

Compressive strength

Upper warning limit

upper control limit

Acceptable limits

Target Mean Strength

Observations: 1 The Presence of one or more points lying outside of the Upper Control Limit (UCL) is primary evidence that the system is out of control at that point, an immediate investigation into the cause should be undertaken (Sample 2 outside UCL) 2 The Presence of two consecutive, or more than 1 in 40, points beyond upper warning limit(UWL) is evidence that the process is out of control and an investigation of data should be undertaken. ( Samples 10 & 11 outside UWL) 2 3 The individual test sample should be greater than F ck - 4, (ie., 26 N/mm in this example.) 4 The Control limits are determined by the standard deviation, it is therefore important to monitor the standard deviation. 5 Lesser the standard deviation,means the process is under control. 6 If a margin of (3 * SD) is adopted there is very little chance of a result falling outside this limit due to natural variation (ie., aggregate grading,batching accuracy, sampling etc) 7 From the chart, it is visible that the magnitude of variation is more and necessary action should be taken 8 For best quality control the graph should be closer to TMS with minimal variation on either side 9 Standard deviation should be below 2.5