Sie sind auf Seite 1von 111

CERC

Capital Cost Benchmarking


Formatting of Headers / Dividers
Sheet Header 1

CERC

SheetHeader1

Sheet Header 2
Sheet Header 3

Capital Cost Benchmarking

SheetHeader2
SheetHeader3

Header 1

Header1
Header2
Header3

Header 1
Header 2
Header 3

Header 2
Header 3

Inputs Divider

Operational Assumptions

Inputs_Divider

Table Heading 2

Table Heading 2
Table Heading 3
Table Heading 4

Table_Heading2

Table Heading 3
Table Heading 4

Individual Cell Assumptions


Standard Assumption

100

Assumptions

Offsheet Reference

100

Offsheet

Flex Cell

100

Assumption_Flex

Name Inputs

Cost Type

Technical_Input

Technical Input

1,000.00

Empy Cell

Input
Empty_Cell

Background for Flag

Flag

Infrastructure
Sub-Total

Sub-Total

Sub-Total

Line Total
Units

100.00
USD

Line_Summary
Unit

Operation Line (Non-Addition)

100

Line_Operation

Operation (Addition / Total)

100

Line_Total

Closing Balance

100

Line_ClosingBal

100

Key Line

Line_Key

Development Styles
WIP

WIP

Central Electricity
Regulatory Commission
Capital Cost Benchmarking for Transmission SubStation 400/220 kV

CERC
Capital Cost Benchmarking
Description

S.No.
1

The model for Transmission sub-station is meant to provide benchmark cost for selected configuration in terms
number of ICTs, reactors, bays etc.

There are 20 standard configurations (called alternates here) provided in the model. The cost has been compu
each of the alternates.For example alternate-1 has configuration given below:Number of Line Bays
Number of ICT Bays
Number of ICTs -Capacity in MVA
Number of Reactors

400 kV
220 kV
400 kV
220 kV
315
500
Shunt Reactor
Bus Reactor

The user has to select the alternate that matches the configuration as given by petitioner using drop down list g
C10 of Computation_sheet

In case none of the alternates matches the configuration given by petitioner, user has to select the closest alte
matches the configuration. The user may then add/substract components as given in cells C46 to C51 of
"Computation_Sheet" to match the required configuration.

The benchmark cost shall get computed in the cell C54 of "Computation_Sheet"

The month and the year of escalation can be chosen from drop down list provided in cell D5

The model can be updated by entering the value of indices in sheet named "Indices" for corresponding month
The user to refer to IEEMA publications for the same.

elected configuration in terms of

el. The cost has been computed for

4
6
2
2
2
0
0
0

titioner using drop down list given in cell

has to select the closest alternate that


n in cells C46 to C51 of

in cell D5

es" for corresponding month and year.

CERC
Capital Cost Benchmarking
Jan-09

Choose Month and Year of Escalation


Choose Desired Configuration (from Alternates show n below )
Alt - 1

Choose Sub-Station Configuration


Descripction
Number of Line Bays
Number of ICT Bays
Number of ICTs -Capacity in MVA
Number of Reactors

Alt - 1
400 kV
220 kV
400 kV
220 kV
315
500
Shunt Reactor
Bus Reactor

Description
Number of Line Bays
Number of ICT Bays
Number of ICTs -Capacity in MVA
Number of Reactors

Alt - 2
4
6
2
2
2
0
0
0

Alt - 3
4
6
2
2
2
0
2
0

Alt - 4
4
6
2
2
2
0
4
0

Alt - 5
4
4
2
2
2
0
2
0

Alt - 6
2
4
2
2
2
0
2
0

Alt - 7
2
4
1
1
1
0
2
0

Alt - 8
6
6
2
2
2
0
2
0

Alt - 9
4
11
1
1
0
1
3
0

Alt - 10
11
12
2
2
0
2
5
0

Alt - 11
6
6
2
2
2
0
2
2

Alt - 12
2
4
2
2
2
0
1
0

Alt - 13
2
4
2
2
2
0
0
1

Alt - 14
2
4
1
1
1
0
1
1

Alt - 15
6
6
2
2
0
2
2
2

Alt - 16
4
6
3
3
3
0
2
1

2
4
2
2
2
0
0
0

Alt - 17

Alt - 18
2
4
2
2
2
0
2
1

Alt - 19
12
5
2
2
2
0
4
2

Alt - 20
7
2
1

4
2
1

Alt - 1
400 kV
220 kV
400 kV
220 kV
315
500
Shunt Reactor
Bus Reactor

4
6
2
2
2
0
0
0

For Modification in above configuration please


choose from drop down list

Combination-2
Combination-3
Combination-4
Combination-5
Combination-6

Configuration
400 kV Line Bay with Shunt Reactor
400kV Line Bay
220KV Line Bay
1 x 315 MVA ICT with 400 kV & 220 kV Bays
Addition of Shunt Reactor to 400KV Line Bay
400 kV Bus Reactor Bay

Choose Combination to be added/ subtracted


Choose Combination to be added/ subtracted
Choose Combination to be added/ subtracted
Choose Combination to be added/ subtracted
Choose Combination to be added/ subtracted
Choose Combination to be added/ subtracted

Combination Name

None
None
None
None
None
None

Combination-1

Component

Add/ Subtract?

1
1
1
1
1
1

Add
Add
Add
Add
Add
Add
None
Combination-1

Total Hard cost of the Configuration


chosen (INR Crores)

66.19

Combination-2
Combination-3
Combination-4
Combination-5
Combination-6

None

Alt - 1

Alt - 2

Alt - 3

Alt - 4

Alt - 5

Alt - 6

Alt - 7

Alt - 8

Alt - 9

Alt - 10

Alt - 11

Alt - 12

Alt - 13

Alt - 14

Alt - 15

Alt - 16

Alt - 17

Alt - 18

Alt - 19

Alt - 20

Jan-06

Feb-06

Mar-06

Apr-06

May-06

Jun-06

Jul-06

Aug-06

Sep-06

Oct-06

Nov-06

Dec-06

Jan-07

Feb-07

Mar-07

Apr-07

May-07

Jun-07

Jul-07

Aug-07

Sep-07

Oct-07

Nov-07

Dec-07

Jan-08

Feb-08

Mar-08

Apr-08

May-08

Jun-08

Jul-08

Aug-08

Sep-08

Oct-08

Nov-08

Dec-08

Jan-09

Feb-09

Mar-09

Apr-09

May-09

Jun-09

Jul-09

Aug-09

Sep-09

Oct-09

Nov-09

Dec-09

Jan-10

Feb-10

Mar-10

Apr-10

May-10

Jun-10

Jul-10

Aug-10

Sep-10

Oct-10

Nov-10

Dec-10

Jan-11

Feb-11

Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

Jan-13

Feb-13

Mar-13

Apr-13

May-13

Jun-13

Jul-13

Aug-13

Sep-13

Oct-13

Nov-13

Dec-13

Jan-14

Feb-14

Mar-14

CERC
Capital Cost Benchmarking
S.No.

Particulars

Power Transformer

a)
b)
c)
d)
e)
f)

Copper
Electrical Lamination Steel
Contructing Steel
Insulating Material
Oil
Labour

LT Transformer

a)
b)
c)
d)
e)
f)

Copper
Electrical Lamination Steel
Contructing Steel
Insulating Material
Oil
Labour

Circuit Breaker

a)
b)
c)
d)
e)

Contructing Steel
Copper
Aluminium
Epoxy Resin
Labour

Current Transformer and Voltage Transformer

a)
b)
c)
d)
e)
f)
g)
h)
i)

Index INSLR
Contructing Steel
Oil
Index No.for Insulator
Electrical Steel Sheets
Copper
Aluminium
Epoxy Resin
Labour

Isolator

a)
b)
c)
d)
e)

Contructing Steel
Copper
Alluminium
Epoxy Resin
Labour

Surge Arrester

a)
b)
c)
d)
e)
f)
g)

Zinc
Cobalt
Alluminium
Ball clay
Bismath
Fuels/power
Labour

Substation Structures including bolts and Nuts

a)
b)
c)

Published Price Index of Structurel Steel


Published Price Index of Electrolytic Zinc
Labour

Index INSLR

a)
b)

Oil
Labour

a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)

Units

Jan-06

Mar-06

Apr-06

May-06

Jul-06

Aug-06

Sep-06

Oct-06

Nov-06

Dec-06

Jan-07

Feb-07

Mar-07

Apr-07

May-07

Jun-07

Jul-07

Aug-07

Sep-07

Oct-07

Nov-07

Dec-07

Jan-08

Feb-08

Mar-08

Apr-08

May-08

Jun-08

Jul-08

Aug-08

Sep-08

Oct-08

Nov-08

Dec-08

Jan-09

Feb-09

Mar-09

Apr-09

May-09

Jun-09

Jul-09

Aug-09

Sep-09

INR/ MT
INR/ MT
Index No
INR/ Kg
INR/ KL
Index No.

234,065.00
200,074.00
257.90
286.83
34,017.00
130.07

257,714.00
195,894.00
256.90
288.92
34,017.00
129.12

259,846.00
194,855.00
233.40
300.68
36,127.00
129.60

321,694.00
221,331.00
243.30
309.05
38,018.00
130.77

401541.00
204827.00
226.20
308.45
38018.00
130.77

367411.00
203822.00
243.30
307,52
40350.00
130.77

396727.00
212009.00
243.90
306.86
40655.00
131.71

396250.00
210100.00
243.40
303.78
42602.00
133.83

388127.00
209593.00
250.80
302.10
42241.00
135.00

377445.00
200334.00
253.50
290.46
43946.00
135.00

349767.00
203675.00
254.90
287.38
41113.00
136.18

331319.00
198712.00
258.90
286.94
38995.00
138.30

321137.00
200218.00
259.30
286.94
38779.00
138.30

266730.00
195011.00
259.20
286.94
38562.00
138.30

268199.00
196183.00
259.90
286.94
38661.00
138.30

300799.00
191168.00
260.10
282.48
38183.00
139.39

341326.00
182565.00
261.20
282.48
36487.00
138.30

331023.00
185109.00
266.20
282.48
35573.00
139.39

343064.00
219073.00
268.30
331.53
35269.00
132.01

310398.00
198404.00
276.70
275.40
32484.00
133.01

327855.00
209701.00
276.70
305.11
36007.00
133.01

350128.00
191920.00
217.22
281.76
49950.00
144.88

340897.00
192092.00
276.70
281.17
35827.00
144.83

291788.00
195575.00
277.30
286.55
35827.00
145.92

271169.00
188296.00
277.90
302.69
36319.00
145.92

298979.00
194326.00
280.10
311.55
38599.00
145.92

384365.00
231172.00
280.60
365.31
39304.00
138.01

356028.00
195118.00
280.00
365.00
39304.00
147.00

374688.00
203869.00
287.40
373.71
40182.00
149.19

378574.00
212968.00
357.10
374.56
45215.00
150.28

378065.00
215227.00
354.60
389.66
49358.00
151.37

379097.00
225373.00
357.90
411.88
56272.00
152.46

342410.00
229721.00
353.67
406.98
59080.00
147.25

349353.00
243082.00
348.92
399.71
56642.00
149.31

254789.00
238764.00
341.61
392.28
54287.00
150.34

201489.00
230946.00
338.67
390.17
53145.00
150.34

166808.00
226040.00
330.60
387.81
52986.00
147.01

175396.00
213066.00
322.70
363.11
49375.00
147.00

207578.00
214251.00
319.10
359.59
46625.00
148.00

232254.00
204758.00
286.10
384.24
46250.00
148.00

240138.00
202337.00
289.00
373.24
45500.00
148.00

258090.00
184752.00
286.00
381.53
44125.00
150.64

271982.00
178393.00
286.20
392.25
45300.00
160.00

314505.00
177277.00
286.70
407.77
47250.00
162.00

308032.00
170233.00
286.40
408.76
58950.00
162.00

INR/ MT
INR/ MT
Index No
INR/ Kg
INR/ KL
Index No.

234,065.00
200,074.00
257.90
286.83
34,017.00
130.07

257,714.00
195,894.00
256.90
288.92
34,017.00
129.12

259,846.00
194,855.00
233.40
300.68
36,127.00
129.60

321,694.00
221,331.00
243.30
309.05
38,018.00
130.77

401541.00
204827.00
226.20
308.45
38018.00
130.77

367411.00
203822.00
243.30
307.52
40350.00
130.77

396727.00
212009.00
243.90
306.86
40655.00
131.71

396250.00
210100.00
243.40
303.78
42602.00
133.83

388127.00
209593.00
250.80
302.10
42241.00
135.00

377445.00
200334.00
253.50
290.46
43946.00
135.00

349767.00
203675.00
254.90
287.38
41113.00
136.18

331319.00
198712.00
258.90
286.94
38995.00
138.30

321137.00
200218.00
259.30
286.94
38779.00
138.30

266730.00
195011.00
259.20
286.94
38562.00
138.30

268199.00
196183.00
259.90
286.94
38661.00
138.30

300799.00
191168.00
260.10
282.48
38183.00
139.39

341326.00
182565.00
261.20
282.48
36487.00
138.30

331023.00
185109.00
266.20
282.48
35573.00
139.39

343064.00
219073.00
268.30
331.53
35704.00
132.01

310398.00
198404.00
276.70
275.40
35269.00
133.01

327855.00
209701.00
276.70
305.11
37131.00
133.01

350128.00
215120.00
217.22
281.76
49950.00
144.88

340897.00
192092.00
276.70
281.17
35827.00
144.83

291788.00
195575.00
277.30
286.55
35827.00
145.92

271169.00
188296.00
277.90
302.69
36319.00
145.92

298979.00
194326.00
280.10
311.55
38599.00
145.92

384365.00
231172.00
280.60
375.31
39304.00
138.01

356028.00
195118.00
280.00
365.00
39304.00
147.00

374688.00
203689.00
387.40
373.31
40182.00
149.19

378574.00
212968.00
357.10
374.56
45215.00
150.28

378065.00
215227.00
354.60
389.66
49538.00
151.37

379097.00
225373.00
357.90
411.88
56272.00
152.46

342410.00
229721.00
353.67
406.98
59080.00
147.25

349353.00
243082.00
348.92
399.71
56642.00
149.31

254789.00
238764.00
341.61
392.28
54287.00
150.34

201489.00
230946.00
338.67
390.17
53145.00
150.34

166808.00
226040.00
330.60
387.81
52986.00
147.01

175396.00
213066.00
322.70
363.11
47221.00
147.00

207578.00
214251.00
319.10
359.59
32138.00
148.00

232254.00
204758.00
286.10
384.24
32681.00
148.00

240138.00
202337.00
289.00
373.24
28067.00
148.00

258090.00
184752.00
286.00
381.53
26595.00
150.64

271982.00
178393.00
286.20
392.25
45300.00
160.00

314505.00
177277.00
286.70
407.77
47250.00
162.00

308032.00
170233.00
286.40
408.76
58950.00
162.00

Index No.
INR/ MT
INR/ MT
INR/ Kg
Index No.

257.90
245,956.00
140,300.00
168.00
130.07

256.90
257,714.00
146,300.00
168.00
129.12

233.40
259,846.00
147,800.00
168.00
129.60

243.30
326,199.00
148,800.00
168.00
130.77

226.20
401541.00
161800.00
168.00
130.77

243.30
367411.00
161800.00
168.00
130.77

243.90
396727.00
153300.00
180.00
131.71

243.40
396250.00
153800.00
180.00
133.83

250.80
388127.00
155300.00
180.00
135.00

253.50
377445.00
154800.00
180.00
135.00

254.90
349767.00
166300.00
180.00
136.18

258.90
331319.00
162300.00
198.00
138.30

259.30
321137.00
166300.00
198.00
138.30

259.20
266730.00
162900.00
198.00
138.30

259.90
268199.00
162900.00
198.00
138.30

260.10
300799.00
160400.00
198.00
139.39

261.20
341326.00
159400.00
198.00
138.30

266.20
331023.00
155900.00
198.00
139.39

267.20
327276.00
152900.00
198.00
132.01

268.70
343064.00
155900.00
198.00
133.01

268.30
328486.00
148900.00
198.00
133.01

217.22
350128.00
145900.00
198.00
144.88

276.70
299451.00
147400.00
198.00
144.83

277.30
283695.00
144900.00
198.00
145.92

277.90
302578.00
141400.00
198.00
145.92

280.13
340650.00
143400.00
198.00
145.92

280.60
384365.00
141317.00
198.00
138.01

280.60
3,56,028
1,63,400
198.00
147.00

287.40
374688.00
167400.00
198.00
149.19

357.10
378574.00
175400.00
198.00
150.28

354.60
378065.00
174400.00
198.00
151.37

357.00
379097.00
178400.00
198.00
152.46

353.67
342410.00
167410.00
198.00
147.25

348.92
349353.00
159465.00
198.00
149.31

341.61
254789.00
151836.00
198.00
150.34

338.67
201489.00
14398.00
198.00
150.34

330.60
155954.00
131900.00
198.00
147.01

322.70
166808.00
128400.00
198.00
147.00

319.10
175396.00
128400.00
188.00
148.00

286.10
207578.00
128400.00
188.00
148.00

289.00
232254.00
131400.00
188.00
148.00

286.00
240138.00
126900.00
188.00
150.64

286.20
258090.00
132400.00
188.00
160.00

286.70
271982.00
144650.00
188.00
162.00

286.40
314505.00
150650.00
188.00
162.00

Index No
Index No
INR/ KL
Index No
INR/ MT
INR/ MT
INR/ MT
INR/ Kg
Index No

136.69
257.90
34,017.00
136.69
200,074.00
245,956.00
140,300.00
168.00
130.07

136.24
256.90
34,017.00
136.24
195,894.00
257,714.00
146,300.00
168.00
129.12

134.10
233.40
36,127.00
134.10
194,855.00
259,846.00
147,800.00
168.00
129.60

133.93
243.30
38,018.00
133.93
198,351.00
326,199.00
148,800.00
168.00
130.77

134.42
226.20
38018.00
134.42
204827.00
401541.00
161800.00
168.00
130.77

137.60
243.30
40350.00
137.60
203822.00
367411.00
161800.00
168.00
130.77

138.99
243.90
40655.00
138.99
212009.00
396727.00
153300.00
180.00
131.71

139.25
243.40
42602.00
139.25
210100.00
396250.00
153800.00
180.00
133.83

141.91
250.80
42241.00
141.91
209593.00
388127.00
155300.00
180.00
135.00

142.76
253.50
43946.00
142.76
200334.00
377445.00
154800.00
180.00
135.00

143.83
254.90
41113.00
143.83
203675.00
349767.00
166300.00
180.00
136.18

144.08
258.90
38995.00
144.08
198712.00
331319.00
162300.00
198.00
138.30

143.74
259.30
38779.00
143.74
200218.00
321137.00
166300.00
198.00
138.30

142.89
259.20
38562.00
142.89
195011.00
266730.00
162900.00
198.00
138.30

144.33
259.90
38661.00
144.33
196183.00
268199.00
162900.00
198.00
138.30

143.95
260.10
38183.00
143.95
191168.00
300799.00
160400.00
198.00
139.39

143.74
261.20
36487.00
143.74
182565.00
341326.00
159400.00
198.00
138.30

144.43
266.20
35573.00
144.43
185109.00
331023.00
155900.00
198.00
139.39

144.78
267.20
35704.00
144.78
195331.00
327276.00
152900.00
198.00
132.01

144.88
268.70
35269.00
144.88
190181.00
343064.00
155900.00
198.00
133.01

144.72
268.30
37131.00
144.72
190143.00
328486.00
148900.00
198.00
133.01

144.79
217.22
49950.00
144.79
215120.00
343215.00
145900.00
198.00
144.88

145.71
276.70
35827.00
145.71
192092.00
299451.00
147400.00
198.00
144.83

146.40
277.30
35827.00
146.40
195575.00
283695.00
144900.00
198.00
145.92

148.13
277.90
36319.00
148.13
188296.00
302578.00
141400.00
198.00
145.92

148.18
280.13
38599.00
148.18
194326.00
340650.00
143400.00
198.00
145.92

148.21
280.60
39304.00
148.21
231172.00
384365.00
141317.00
198.00
138.01

148.21
280.60
39304.00
148.21
1,95,118.
3,56,028
1,63,400
198.00
147.00

150.71
287.40
40182.00
150.71
2,03,869
374688.00
1,67,400
198.00
149.19

159.36
357.10
45215.00
159.36
212968.00
378574.00
175400.00
198.00
150.28

160.11
354.60
49538.00
160.11
215227.00
378065.00
174400.00
198.00
151.37

167.71
357.90
56272.00
167.71
225373.00
3,79,097
1,78,400
198.00
152.46

170.33
353.67
59080.00
170.33
229721.00
342410.00
167410.00
198.00
147.25

171.24
348.92
56642.00
171.24
243082.00
349353.00
159465.00
198.00
149.31

168.45
341.61
54287.00
168.45
248367.00
254789.00
151836.00
198.00
150.34

164.89
338.67
53145.00
164.89
249862.00
201489.00
14398.00
198.00
150.34

161.94
330.60
52986.00
161.94
250205.00
155954.00
131900.00
198.00
147.01

157.02
322.70
47221.00
157.02
228507.00
166808.00
128400.00
198.00
147.00

159.87
319.10
32138.00
159.87
237253.00
175396.00
128400.00
188.00
148.00

150.87
286.10
32681.00
150.87
222515.00
207578.00
128400.00
188.00
148.00

150.64
289.00
28067.00
150.64
219799.00
232254.00
131400.00
188.00
148.00

150.70
286.00
26595.00
150.70
186754.00
240138.00
126900.00
188.00
150.64

153.18
286.20
27178.00
153.18
187491.00
258090.00
132400.00
188.00
160.00

153.63
286.70
30436.00
153.63
182536.00
271982.00
144650.00
188.00
162.00

156.06
286.40
36277.00
156.06
170393.00
314505.00
150650.00
188.00
162.00

Index No
INR/ MT
INR/ MT
INR/ Kg
Index No.

257.90
245,956.00
140,300.00
168.00
130.07

256.90
257,714.00
146,300.00
168.00
129.12

233.40
259,846.00
147,800.00
168.00
129.60

243.30
326,199.00
148,800.00
168.00
130.77

226.20
401541.00
161800.00
168.00
130.77

243.30
367411.00
161800.00
168.00
130.77

243.90
396727.00
153300.00
180.00
131.71

243.40
396250.00
153800.00
180.00
133.83

250.80
388127.00
155300.00
180.00
135.00

253.50
377445.00
154800.00
180.00
135.00

254.90
349767.00
166300.00
180.00
136.18

258.90
331319.00
162300.00
198.00
138.30

259.30
321137.00
166300.00
198.00
138.30

259.20
266730.00
162900.00
198.00
138.30

259.90
268199.00
162900.00
198.00
138.30

260.10
300799.00
160400.00
198.00
139.39

261.20
341326.00
159400.00
198.00
138.30

266.20
331023.00
155900.00
198.00
139.39

267.20
327276.00
152900.00
198.00
132.01

268.70
343064.00
155900.00
198.00
133.01

268.30
328486.00
148900.00
198.00
133.01

217.22
350128.00
145900.00
198.00
144.88

276.70
299451.00
147400.00
198.00
144.83

277.30
283695.00
144900.00
198.00
145.92

277.90
302578.00
141400.00
198.00
145.92

280.13
340650.00
143400.00
198.00
145.92

280.60
384365.00
141317.00
198.00
138.01

280.60
3,56,028
1,63,400
198.00
147.00

287.40
374688.00
1,67,400
198.00
149.19

357.10
378574.00
175400.00
198.00
150.28

354.60
3,78,065
1,74,400
198.00
151.37

357.90
3,79,097
1,78,400
198.00
152.46

353.67
342410.00
167400.00
198.00
147.25

348.92
349353.00
159465.00
198.00
149.31

341.61
254789.00
151836.00
198.00
150.34

338.67
201489.00
14398.00
198.00
150.34

330.60
155954.00
131900.00
198.00
147.01

322.70
166808.00
128400.00
198.00
147.00

319.10
175396.00
128400.00
188.00
148.00

286.10
207578.00
128400.00
188.00
148.00

289.00
232254.00
131400.00
188.00
148.00

286.00
240138.00
126900.00
188.00
150.64

286.20
258090.00
132400.00
188.00
160.00

286.70
271982.00
144650.00
188.00
162.00

286.40
314505.00
150650.00
188.00
162.00

INR/ MT
INR/ Kg
INR/ MT
INR/ MT
INR/ Kg
Index No
Index No

107,100.00
1,756.49
140,300.00
1,575.00
550.99
312.40
130.07

124,500.00
1,566.66
146,300.00
1,575.00
538.49
310.70
129.12

121,500.00
1,436.71
147,800.00
1,575.00
535.53
311.00
129.60

140,200.00
1,545.07
148,800.00
1,575.00
465.31
313.50
130.77

171900.00
1716.50
161800.00
1575.00
516.54
314.70
130.77

197900.00
1794.76
161800.00
1675.00
517.64
316.80
130.77

166200.00
1698.04
153300.00
1725.00
505.75
319.70
131.71

175300.00
1655.52
153800.00
1725.00
511.61
320.10
133.83

181600.00
1985.91
155300.00
1725.00
526.80
326.50
135.00

180500.00
2203.03
154800.00
1725.00
555.84
328.90
135.00

212300.00
1996.81
166300.00
1725.00
649.34
331.40
136.18

228800.00
2024.60
162300.00
1725.00
690.01
329.60
138.30

221500.00
2889.92
166300.00
1725.00
792.79
326.70
138.30

176500.00
2725.73
162900.00
1725.00
916.72
322.40
138.30

178000.00
2762.56
162900.00
1725.00
978.70
322.30
138.30

160400.00
3064.45
160400.00
1725.00
1108.54
320.70
139.39

174000.00
2954.22
159400.00
1725.00
1402.73
319.60
138.30

166300.00
2806.47
155900.00
1725.00
1671.45
320.30
139.39

157800.00
2665.83
152900.00
1725.00
1723.64
322.00
132.01

163500.00
2550.15
155900.00
1725.00
1658.22
321.90
133.01

144500.00
2443.39
148900.00
1725.00
1664.86
321.80
133.01

136700.00
2662.27
145900.00
1725.00
1469.70
322.40
144.88

131100.00
2764.57
147400.00
1725.00
1315.72
321.70
144.83

111100.00
3038.87
144900.00
1725.00
1272.41
323.70
145.92

109800.00
3632.43
141400.00
1725.00
1236.55
326.50
145.92

104200.00
4203.70
143400.00
1725.00
1103.05
334.40
145.92

107300.00
4570.15
141317.00
1725.00
1158.03
334.20
138.01

107300.00
4784.31
1,63,400
1725.00
1416.12
334.20
147.00

98000.00
4726.05
1,67,400
1725.00
1525.07
334.20
149.19

97700.00
4772.21
175400.00
1725.00
1433.90
334.20
150.28

90300.00
4495.37
1,74,400
1725.00
1287.77
334.20
151.37

88700.00
4035.76
1,78,400
1725.00
1158.03
334.20
152.46

83657.00
3827.61
1,67,400
1725.00
1148.83
334.20
147.25

76145.00
33143.28
159465.00
1725.00
1182.67
334.20
149.31

72134.00
2892.46
151836.00
1846.00
1136.94
334.20
150.34

68926.00
22637.34
14398.00
1893.00
1185.26
334.20
150.34

63400.00
1677.63
131900.00
1975.00
1066.29
350.20
147.01

68900.00
2003.71
92267.00
1975.00
1073.42
331.80
147.00

67900.00
1748.72
96267.00
1975.00
1114.50
329.50
148.00

80700.00
1602.87
96250.00
2025.00
1086.91
323.50
148.00

88400.00
1850.25
96250.00
2025.00
972.94
321.00
148.00

88200.00
1721.26
96433.00
2025.00
873.21
322.60
150.64

91000.00
1642.20
98100.00
2275.00
798.12
325.20
160.00

98900.00
2023.92
105600.00
2275.00
763.51
327.10
162.00

106900.00
2210.95
115433.00
2275.00
780.47
338.40
162.00

Index No
INR / MT
Index No

22,310.00
107,100.00
130.07

23,269.00
124,500.00
129.12

24,214.00
121,500.00
129.60

25,444.00
140,200.00
130.77

24541.00
171900.00
130.77

24068.00
197900.00
130.77

23595.00
166200.00
131.71

24257.00
175300.00
133.83

25203.00
181600.00
135.00

25783.00
180500.00
135.00

25783.00
212300.00
136.18

26729.00
228800.00
138.30

26729.00
221500.00
138.30

27188.00
176500.00
138.30

27925.00
178000.00
138.30

28680.00
160400.00
139.39

28881.00
174000.00
138.30

28126.00
166300.00
139.39

28611.00
157800.00
132.01

29237.00
163500.00
133.01

29334.00
144500.00
133.01

35286.00
136700.00
144.88

35900.00
131100.00
144.83

36245.00
111100.00
145.92

37567.00
109800.00
145.92

38889.00
104200.00
145.92

46434.00
107300.00
138.01

46434.00
107300.00
147.00

46675.00
98000.00
149.19

48117.00
97700.00
150.28

49269.00
90300.00
151.37

49632.00
88700.00
152.46

49582.00
86400.00
147.25

49696.00
82600.00
149.31

49874.00
75800.00
150.34

49963.00
72500.00
150.34

50867.00
63400.00
147.01

49471.00
68900.00
147.00

49894.00
67900.00
148.00

49766.00
80700.00
148.00

49806.00
88400.00
148.00

46805.00
88200.00
150.64

47030.00
91000.00
160.00

47030.00
98900.00
162.00

47360.00
106900.00
162.00

INR/ KL
Index No

PVC/XLPE Insulated power and control cables


PVC Compound
Metal
Aluminium
Copper
weight in MT of metal KM(Size wise)
IOC _HST basic ceiling selling price ex -refinery issued by IOC
Northern region New Delhi
All india average consuer prize index for industrial worker(base
1982=100)as published by labour bureau ,Govt of india and
circulated by emo.
Index No.of whole sell price in india for iron and steel as
published by reserve bank of india bulletein
Index No.of whole sell price in india for non metalic mineral
products(Structural Clay Product) as published by RBI.
Cement
Diesel

INR / MT
INR / MT
INR / MT
INR / MT

Index No
Index No
Index No

Particulars

Copper
Electrical Lamination Steel
Contructing Steel
Insulating Material
Oil
Labour

LT Transformer
Copper
Electrical Lamination Steel
Contructing Steel
Insulating Material
Oil
Labour

Circuit Breaker

a)
b)
c)
d)
e)

Contructing Steel
Copper
Alluminium
Epoxy Resin
Labour

Current Transformer and Voltage Transformer

a)
b)
c)
d)
e)
f)
g)
h)
i)

Index INSLR
Contructing Steel
Oil
Index No.for Insulator
Electrical Steel Sheets
Copper
Alluminium
Epoxy Resin
Labour

Isolator

a)
b)
c)
d)
e)

Contructing Steel
Copper
Alluminium
Epoxy Resin
Labour

Surge Arrester

a)
b)
c)
d)
e)
f)
g)

Zinc
Cobalt
Alluminium
Ball clay
Bismath
Fuels/power
Labour

Substation Structures including bolts and Nuts

a)
b)
c)

Published Price Index of Structurel Steel


Published Price Index of Electrolytic Zinc
Labour

8
a)
b)

Oil
Labour

PVC/XLPE Insulated Power and Control Cables


PVC Compound
Metal
Alliminium
Copper
Weight in MT of metal KM (Size wise)
IOC _HST basic ceiling selling price ex -refinery issued by IOC
Northen region New Delhi
All india average consuer prize index for industrial worker(base
1982=100)as published by labour bureau, Govt of india and
circulated by emo.
Index No.of whole sell price in india for iron and steel as
published by reserve bank of india bulltein
Index No.of whole sell price in india for non metalic mineral
products(Structurel clay product) as published by RBI.
Cement
Diesel

g)
h)
i)
j)
k)

Units

INR/ MT
INR/ MT
Index No
INR/ Kg
INR/ KL
Index No.

INR/ MT
INR/ MT
Index No
INR/ Kg
INR/ KL
Index No.

Index No.
INR/ MT
INR/ MT
INR/ Kg
Index No.

Index No
Index No
INR/ KL
Index No
INR/ MT
INR/ MT
INR/ MT
INR/ Kg
Index No

Index No
INR/ MT
INR/ MT
INR/ Kg
Index No.

INR/ MT
INR/ Kg
INR/ MT
INR/ MT
INR/ Kg
Index No
Index No

Index No
INR / MT
Index No

Index INSLR

9
a)
b)
c)
d)
e)
f)

Jan-09

Power Transformer

a)
b)
c)
d)
e)
f)

a)
b)
c)
d)
e)
f)

136.69
34,017.00
130.07

136.24
34,017.00
129.12

134.10
36,127.00
129.60

133.93
38,018.00
130.77

134.42
38018.00
130.77

137.60
40350.00
130.77

138.99
40655.00
131.71

139.25
42602.00
133.83

141.91
42241.00
135.00

142.76
43946.00
135.00

143.83
41113.00
136.18

144.08
38995.00
138.30

143.74
38779.00
138.30

142.89
38562.00
138.30

144.33
38661.00
138.30

143.95
38183.00
139.39

143.74
36487.00
138.30

144.43
35573.00
139.39

144.78
35704.00
132.01

144.88
35269.00
133.01

144.72
37131.00
133.01

144.79
49950.00
144.88

145.71
35827.00
144.83

146.40
35827.00
145.92

148.13
36319.00
145.92

148.18
38599.00
145.92

148.21
39304.00
138.01

148.21
39304.00
147.00

150.71
40182.00
149.19

159.36
45215.00
150.28

160.11
49538.00
151.37

167.71
56272.00
152.46

170.33
59080.00
147.25

171.24
56642.00
149.31

168.45
54287.00
150.34

164.89
53145.00
150.34

161.94
52986.00
147.01

161.94
47221.00
147.00

157.02
32138.00
148.00

150.87
32681.00
148.00

150.64
28067.00
148.00

150.70
26595.00
150.64

153.18
45300.00
160.00

153.63
47250.00
162.00

156.06
58950.00
162.00

77,250.00
123,200.00
253,217.00
-

77,250.00
131,133.00
265,322.00
-

77,250.00
128,567.00
267,517.00
-

77,250.00
132,733.00
335,829.00
-

73500.00
0.00
161800.00
409628.00
0.00

73500.00
0.00
161800.00
374811.00
0.00

74750.00
0.00
153300.00
404717.00
0.00

80750.00
0.00
153800.00
404230.00
0.00

84000.00
0.00
155300.00
395943.00
0.00

84000.00
0.00
154800.00
385046.00
0.00

82000.00
0.00
166300.00
356811.00
0.00

82750.00
0.00
162300.00
337991.00
0.00

83750.00
0.00
147900.00
287323.00
0.00

84000.00
0.00
144500.00
279653.00
0.00

84000.00
0.00
144500.00
315666.00
0.00

82650.00
0.00
142167.00
361752.00
0.00

83650.00
0.00
137167.00
346886.00
0.00

83650.00
0.00
133000.00
337667.00
0.00

83650.00
0.00
130000.00
356255.00
0.00

86000.00
0.00
131667.00
340050.00
0.00

89000.00
0.00
125333.00
341598.00
0.00

87000.00
0.00
112467.00
350128.00
0.00

87000.00
0.00
147400.00
299451.00
0.00

87500.00
0.00
144900.00
283695.00
0.00

87500.00
0.00
141400.00
302578.00
0.00

88000.00
0.00
143400.00
340650.00
0.00

89000.00
0.00
141317.00
384365.00
0.00

89000.00
0.00
1,63,400
3,56,028
0.00

91000.00
0.00
1,67,400
3,74,688
0.00

92000.00
0.00
1,75,400
3,78,574
0.00

97000.00
0.00
1,74,400
3,78,065
0.00

97000.00
0.00
1,78,400
3,79,097
0.00

97000.00
0.00
1,67,400
3,42,410
0.00

95000.00
0.00
159465.00
3,49,353
0.00

92650.00
0.00
151836.00
254789.00
0.00

85280.00
0.00
14398.00
201489.00
0.00

80250.00
58000.00
131900.00
185521.00
0.00

83000.00
70200.00
104150.00
192169.00
0.00

84000.00
63900.00
104150.00
222863.00
0.00

84500.00
78600.00
104150.00
254794.00
0.00

84500.00
89100.00
104150.00
255759.00
0.00

84500.00
86100.00
104267.00
274252.00
0.00

87600.00
96200.00
105933.00
276648.00
0.00

88000.00
102100.00
113433.00
335659.00
0.00

91500.00
114800.00
123267.00
337892.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

451.10

452.20

452.20

452.20

452.20

481.40

481.40

481.40

130.07

129.12

129.60

130.77

130.77

130.77

131.71

133.83

135.00

135.00

136.18

138.30

138.30

138.30

138.30

139.39

138.30

139.39

132.01

133.01

133.01

144.88

144.83

145.92

145.92

145.92

138.01

147.00

149.19

150.28

151.37

152.46

147.25

149.31

150.34

150.34

147.01

147.00

148.00

148.00

148.00

150.64

160.00

162.00

162.00

169.90

256.90

233.40

191.00

226.20

243.30

243.90

243.40

250.80

253.50

254.90

258.90

259.30

259.20

259.90

260.10

261.20

266.20

267.20

268.70

268.30

217.22

276.70

277.30

277.90

280.13

280.60

280.60

287.40

357.10

354.60

357.90

342.50

337.90

335.20

346.10

330.60

322.70

319.10

286.10

289.00

286.00

286.20

286.70

286.40

Index No

Month and Year of Escalation

S.No.

Jun-06

Index No

Labour Correction Factor

Month and Year of Escalation

Feb-06

INR/ KL
Index No

INR / MT
INR / MT
INR / MT
INR / MT

Index No
Index No
Index No
Index No
Index No

186.20

188.88

190.60

191.20

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

190.60

211.70

211.70

213.50

214.30

216.80

219.40

219.40

219.40

219.40

220.16

220.24

220.78

220.86

223.10

223.10

223.10

224.00

224.00

224.00

224.00

224.00

227.20

227.20

227.20

191.20
418.00

191.20
418.00

191.20
418.00

191.20
418.00

191.20
418.00

191.20
418.00

191.20
418.00

191.20
418.00

191.20
418.00

191.20
418.00

220.20
418.00

220.20
418.00

220.20
418.00

220.20
418.00

220.20
418.00

220.20
418.00

220.20
449.50

220.20
449.50

220.20
449.50

220.20
449.50

220.20
449.50

220.20
449.50

220.20
449.50

220.30
451.50

220.50
451.50

220.60
451.50

220.80
465.80

220.80
465.80

220.80
465.80

220.80
465.80

220.80
465.80

220.80
478.90

220.80
478.90

220.80
478.90

220.80
478.90

221.40
478.90

221.40
482.30

222.70
451.10

224.50
452.20

227.70
452.20

227.70
452.20

227.70
452.20

230.90
481.40

230.50
481.40

228.10
481.40

Labour Correction Factor

LT Transformer

P1 = Po x { 0.15 x (A1/Ao) + 0.26 x (B1/Bo) + 0.08x (C1/Co) + 0.05


x (D1/Do) + 0.11 x (E1/Eo) + 0.12 x (L1/Lo)} Po
Auto Transformer
P1 = Po x { 0.15 + 0.23 x (A1/Ao) + 0.26 x (B1/Bo) + 0.07 x (C1/Co)
+ 0.05 x (D1/Do) + 0.15 x (E1/Eo) + 0.12 x (L1/Lo)} Po
Circuit Breakers
P1 = Po x { 0.15 + 0.15 x (C1/Co) + 0.23 x (A1/Ao) + 0.22 x
(Al1/Alo) + 0.15 x (D1/Do) + 0.20 x (L1-Lo)/Lo)} Po
Current Transformer & Capacity Voltage Transformer

P1 = Po x { 0.15 + 0.13 x (A1/Ao) + 0.12 x (B1/Bo) + 0.11 x (C1/Co)


+ 0.23 x (D1/Do) + 0.06 x (E1/Eo) +0.20 x (L1-Lo)/Lo)} Po
Isolators
P1 = Po x { 0.15 + 0.17 x (C1/Co) + 0.18 x (A1/Ao) + 0.25 x
(Al1/Alo) + 0.05 x (D1/Do)+ 0.20 x (L1-Lo)/Lo)} Po
Surge Arrestor

P1 = Po x { 0.15 + 0.20 x (Zn1/Zno) + 0.20 x (CO1/COo) + 0.15 x


(Bi1Bio) + 0.10 x(Ba1/Bao)+ 0.20 x (L1-Lo)/Lo)} Po
11 kV XLPE/PVC Insulated Power and Control Cables

P1 = Po x { 0.85 + 0.15 x (PVC1/PVCo) } Po + (M1- Mo)


Sub-station Structures {Lattice Steel structures& Pipe Structures
(Including Bolts and Nuts, washers & Foundation Bolts)
P1 = Po x { 0.15 + 0.58 x (Sa1/Sao) + 0.16 x (Zn1/Zno) + 0.11 x
(L1)/Lo)} Po
For Indian Rupee portion of Erection Price

ER1 = ERo x (0.20 + 0.80 x (L1/Lo)


Switchyard Fencing

P1= Po x { (0.30 + 0.50 x (C1/Co) + 0.20 x (L1/Lo) }


Bus-Bar Materials

P1= Po x { (0.15 + 0.60 x (Al1/Alo) + 0.15 x (D1/Do) + 0.10 x (L1/Lo)


}
P1 = Price Adjustment amount, expressed in currency of bid
Po =Ex-work price of main equipment in currency of Bid
A = Copper Prices as published by IEEMA
B = CRGO Electrical Sheets
C= Iron and Steel
D= Insulating Material
E= Transformer Oil Base Stock
I = Insulator
CO= Cobalt
Bi = Bismuth
Ba= Ball Clay
Al = Aluminum
M= Weight in MT per km of Cable x Published Index of metal
converted into currency (For Power Cable: Aluminum, For
Control Cable : Copper)
Zn = Zinc
INS= Index INSTR
Sa = Steel Angle
L = Labour Index

Oct-09

Nov-09

Dec-09

Jan-10

Feb-10

Mar-10

Apr-10

May-10

Jun-10

Jul-10

Aug-10

Sep-10

Oct-10

Nov-10

Dec-10

Jan-11

Feb-11

Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Aug-12

Sep-12

Oct-12

Nov-12

Dec-12

Jan-13

Feb-13

Mar-13

Apr-13

May-13

Jun-13

Jul-13

Aug-13

Sep-13

Oct-13

Nov-13

Dec-13

Jan-14

CERC
Capital Cost Benchmarking
Project Costs (Actual)
Name of the Utility
Name of sub-station

Reference P.O. No.

Month and Year of Commissioning

S.No.

Name of the Component

Unit

Power Transformer

a)

ICT 400/3/220 3/ 33KV,167 MVA, single phase autotransformer including


Insulating Oil Frieght & Insurance

INR Lakhs

b)

I.C.T 315 MVA, 3 Phase, 400/220/33 KV including including Insulating Oil


Frieght & Insurance

INR Lakhs

c)

ICT 400/3/220 3/ 33KV,105 MVA, single phase autotransformer including


Insulating Oil Frieght & Insurance

INR Lakhs

d)

I.C.T 250 MVA, 3 Phase, 400/220/33 KV including including Insulating Oil


Frieght & Insurance

Shunt Reactor

a)
b)

420KV, 125 MVAR, 3-Phase Shunt Reactor


420KV, 80 MVAR, 3-Phase Shunt Reactor

INR Lakhs
INR Lakhs

c)
d)
e)

420KV, 63/50 MVAR, 3-Phase Shunt Reactor


NGR with oil, for above 400 kV Shunt Reactor
Surge Arrestors 120 kV for NGR

INR Lakhs
INR Lakhs
INR Lakhs

f)

Spares for NGR &120KV SA

INR Lakhs

Bus Reactor

a)
b)
c)
d)
e)
f)

125 MVAR 400 kV


80 MVAR 400 kV
63 / 50 MVAR 400 kV
50 MVAR
Oil for shunt Reactor
Spares for Bus Reactor

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

420 kV Equipments

a)
b)
c)
d)
e)
g)
h)
j)

420 kV Breakers with CR


420 kVBreakers without CR
420 kV CTs 2000A, 40KA, 5-Core,
420 kv CVT 4400 PF
420 kv CVT 8800 PF
420 KV,2000 A,40 kA Isolators 3-Phase with one E/S (3 Phase) with
insulators
420 KV,2000A,40 kA Isolators 3-Phase with two E/S with insulators
420 KV,2000A,40 kA Isolators one Phase with one E/S
Surge Arrestors 390 kV

400 kV Control and Protection Panel

a)
b)
c)

Circuit Breaker panel with Auto Reclose


Circuit Breaker panel without Auto Reclose
Line protection panel

INR Lakhs
INR Lakhs
INR Lakhs

d)

Transformer protection panel(both HV and MV)

INR Lakhs

e)
f)

Reactor protection panel


Bus Bar Protection Panel

INR Lakhs
INR Lakhs

245 kV Equipment

a)

Circuit Breakers 245 kV


1600 A, 40 kA
2500 A, 40 kA
Current Transformers 245 kV

INR Lakhs
INR Lakhs

1600 A, 40 kA , 5 core, with 120% extended current

INR Lakhs

1600 A, 40 kA, 5 core, with 150% extended current

INR Lakhs

f)

b)

c)

d)

e)
f)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Capacitive Voltage Transformer 245 kV


8800 pf, S- Ph, with 3 secondaries

INR Lakhs

4400 pf, S- Ph with 3 secondaries

INR Lakhs

Isolators 245 kV
1600A, 40 kA, DB Type with two E/S

INR Lakhs

1600A, 40 kA, DB Type with one E/S

INR Lakhs

1600A, 40 kA, DB, Tandem Type without E/S


2500A, 40 KA, DB Type with Two E/S
1600A, 40 kA with one E/S S-phase

INR Lakhs
INR Lakhs
INR Lakhs

1600A, 40 kA without E/S S phase

INR Lakhs

216 kV Surge Arrestors


220 kV Control & Potection Panel
Circuit Breaker panel with Auto Reclose
Circuit Breaker panel without Auto Reclose
Line protection panel

INR Lakhs
INR Lakhs
INR Lakhs

Bus Bar Protection panel

INR Lakhs

Foundations

a)
b)
c)
d)

INR Lakhs
INR Lakhs
INR Lakhs

f)

ICT -315 MVA


ICT -S-ph 167 MVA
Reactors
400 kV equipments
420 KV Circuit breakers
420KV Isolators
420 KV Current Transformers
420KV CVT
390KV surge Arrestors
Towers , Lattice Type
Lightning cum Lighting Masts
B.P.I.
Line( Wave) Traps both for 400 & 220 kV
220 kV equipments
245 KV Circuit breakers
245 KV Isolators
245 KV Current Transformers
245 KV CVT
216 KV surge Arrestors
Towers , Lattice Type
BPI
L.T Transformers

Firewalls for Single Phase ICT & Reactors

INR Lakhs

Common Equipments

a)

Control & Relay panel.


Complete Substation automation system for 400/230kV S/S including
hardware and software for remote control station alongthwith associated
equipments and Kiosks for the following bays ( bays) as defined in the
teechnical specification, Sec-Substaion Automation
LT Switchgear
800KVA 33/.400 KV Distribution Transformer
630KVA, 11/400VKV Distribution Transformer
72.5 kV Isolator with insulators
72.5KV , 1250A, 25KA Circuit Breaker
72.5KV, 25KA, 3 Core Current Transformer 3 Nos
72.5KV, 2 Core, 33kV /3 / 110 V/3
CVT / PT
Relay panel for 800 kVA Transformer on 72.5 kV side
11KV Horn gap Fuse
11KV Isolator without ES

e)

b)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

INR Lakhs

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

b)
c)
d)
e)
f)
g)
h)

11KV Surge Arrestor.


415V Main Switch Board
415V ACDB
415V MLDB
415V Emergency LDB
220V DCDB
50V DCDB
220V Battery
50V Battery
Battery Charger for 220V Battery
Battery Charger for 50V Battery
DG Set-250KVA with control panel
High Wall Type Split AC unit of 2TR Capacity
Illumination(Indoor and Outdoor)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

10

PLCC equipments on 400 kV side (Both for 400 & 220 kV)

INR Lakhs

11

Mandatory Spares

INR Lakhs

12

Steel Structures - Unit MT

a)

Lattice Type

INR Lakhs

b)

Tubular support structures

INR Lakhs

13

Earth mat- 40 mm rods - Per kM

INR Lakhs

14

Bus Bar Materials

a)

400 kV Switchyard

INR Lakhs

A
Moose ACSR
Twin disc Ins. string with Tension Hardware fr Twin Moose
Twin disc Ins. string with Suspension Hardware fr Twin Moose
400KV BPI
Tee Clamp for Twin Moose to 4" IPS Al. Tube
Tee Clamp for Twin Moose to Twin Moose ACSR
PG Clamps
Spacer to Twin Moose ACSR
Ground wire and accessories
b)

220 kV Switchyard
Quad disc Ins. string with Tension Hardware fr Quad Moose
Twin disc Ins. string with Suspension Hardware fr Quad Moose
Twin disc Ins. string with Tension Hardware fr Twin Moose
Twin disc Ins. string with Suspension Hardware fr Twin Moose

INR Lakhs

220KV BPI
4" IPS Al. Tube
Moose ACSR
Tee Clamp for Quad Moose to Twin Moose ACSR
Tee Clamp for Twin Moose to Twin Moose ACSR
Tee Clamp for Twin Moose to 4" IPS Al. Tube
Spacer to Quad Moose ACSR
Spacer to Twin Moose ACSR
PG Clamps
Ground wire and accessories

15

Fire fighting Equipment including one 315 MVA Transformer.

INR Lakhs

16

Power Cables -- Cost per kM

INR Lakhs

17

Control cables --- Cost per kM

INR Lakhs

18

Land devolopment & Civil engineering works

a)

k)

Soil Investigation (lump Sum)


Intial Civil Engineering Works like Levelling,Retaining walls, Appoach Road,
Peripheral Fencing etc. (lump Sum)
Ant weed treatment & Site Surfing Cost per Meter
Road work (Cost per Meter)
Storm water drain, Road culverts drain crossing, cable trench crossing
Switch yard fencing
DG room & Fire fighting Room (FFPH)
Control room with cable vaults
Cable ducts
Providing water supply including drinking water & water for fire fighting
system and sewage system
Parking sheds,Rain water Harvesting systems & land scaping etc.

19

Erection charges

a)

Common equipments

b)
c)
d)
e)
f)
g)
h)
j)
j)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Auxiliary Transformers,LT Switchgear, AC & DC Panels.72.5 kV ,33kV & 11


kV equipments etc.

INR Lakhs

Station D.C Batteries 220 V, 500 AH

INR Lakhs

Station D.C Batteries 50 V, 500 AH

INR Lakhs

Battery Charger System 220 V, 70A / 50 A Float cum Boost

INR Lakhs

Battery Charger System 50 V, 70 A / 50 A Float cum Boost

INR Lakhs

Common equipment pertaining to C&R system.( Automation)

INR Lakhs

Power cables

INR Lakhs

b)

c)
d)

e)

f)

h)
i)
j)
k)

Control cables
Earth mat 40 mm Rods ( Main Earth Mat)
Diesel Generator set with AMF panel 250 kVA
Air Conditioning and Ventilation
Fire Fighting System
Lightning & lightnening masts
Illumination System - Indoor & outdoor
ICTs ( Power Transformers)
I.C.T 315 MVA, 3Phase, 400/220/33 KV class
I.C.T 167 MVA, S-Phase, 400/220 kV ( Single Phase 167 MVA Units)
Shunt & Bus Reactors 400 kV
400 kV equipments
420 KV Circuit breakers
420KV Isolators
420 KV Current Transformers
420KV CVT
390KV surge Arrestors
Towers , Beams Lattice Type
Tubular type pipe structures
Bus Bars formation etc.
Control & Protection panels
400KV CB relay Panel
400KV Line Protection Panel
400-220/33KV Transformer Protection Panel
400KV Reactor Protection Panel
Duplicate Bus Bar Protection Panel - 400KV
PLCC Equipments (Both for 400 kV & 220 kV)
220 kV Equipments
245 KV Circuit breakers
245 KV Isolators
245 KV Current Transformers
245 KV CVT
216 KV surge Arrestors
220 kV Towers & beams
220 tubular pipe structures
220 kV Bus Bars formation etc
Control & Protection panels
Circuit breaker relay panel With Auto reclosure
Line protection panel
Single Bus Bar protection panel

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

400/220 kV S/S,
ARASUR(New)

400/220 kV S/S
AT,ROORKEE

400/220 kV S/S,
PUGALUR(New)

400/220 kV S/S,
DAMOH (New)

400/220 kV S/S,
KARAIKUDI(New)

Ref:- LOA-55803Ref:- LOA C-55802Ref:- LOA C-56301Ref-C-13901-S919ARef:- LOA C-56204S119A-7/LOA-1/1986


S119A-7/LOA-1/1966
S919A-3/LOA3/LOA-I/2198 & 2199
S919A-3/LOA-I/2025 &
&1987 Dated 10-03&1967(Proj-1) Dated
II/2128&2129 dated 23DATED 01/11/2006
2026 DATED:20/04/06
2006
24/02/06
08-2006
Aug-05

Apr-06

585.90

Aug-05

Jan-06

730.44

Aug-05

32.70
5.36
3.12
5.93
6.86
0.88

37.11
7.85
6.01
5.58
6.78
1.10

30.52
4.64
3.01
6.20
7.15
1.65

34.83
27.44
5.17
3.11
8.15
9.35
1.48

27.01
5.09
3.22
4.91
7.51
0.98

7.59
6.28
35.67
19.71
107.73

6.46
5.23
27.21
17.01
181.78

6.44
6.44
13.58
18.76
13.63
159.75

5.36
5.61
13.30
17.19
12.54
96.37

12.02
12.02

15.97
16.80

14.49
14.49

2.73
2.84

3.34
3.34

2.30
2.43

2.38

3.56

2.09

2.90
2.46
2.07
3.02
0.38

3.45
2.91
2.39
3.63
0.53

2.85
2.51
2.22
2.99
0.59

13.19
13.19
2.64
2.69
2.22
3.88
3.29
3.79
4.09
0.55
6.44
6.44
13.58

12.99
12.99
2.60
2.65
2.18
2.28
1.62
2.52
2.02
0.63
5.61
5.36
13.30

6.28
6.28
24.86

5.23
5.23
18.52

65.70

111.98

50.22

45.50

15.00
15.00
10.00
1.25
0.50
0.10
0.10
0.05
3.00
4.00
0.05
0.50
0.50
0.40
0.10
0.10
0.40
2.50
0.40
0.20
1.00

5.28
4.46
1.58
6.14
2.73
2.88
4.37
0.10
0.13

18.94
18.11
-

7.52
5.01
0.74
6.28
2.52
1.53
4.06
0.16
0.35

12.21
10.12
0.97
5.38
2.43
2.43
6.44
0.13
0.54

13.17
12.74
1.08
5.40
0.90
0.90
0.18
0.52

0.18
9.40
9.75
3.08
1.23
2.05
1.52
6.39
1.94
1.50
1.06
13.39
0.36
-

13.05
6.73
2.93
0.79
1.49
1.34
6.17
1.69
2.93
2.26
17.63
0.44
-

0.07
8.79
5.78
2.73
1.16
0.97
0.91
5.70
1.41
3.56
2.66
19.62
0.30
-

0.11
11.29
10.96
2.76
0.79
3.16
3.16
4.57
1.21
2.35
1.79
22.21
0.32
-

0.04
12.85
12.96
4.75
0.86
2.25
2.16
5.11
1.45
2.85
1.83
24.75
0.37
-

0.60

0.80

6.00

160.00

180.00

180.00

75.00

1.20

1.00

2.00

70.00
0.00
0.02
0.02
0.00
56.00
100.00
90.00

5.00
30.00

0.10

0.20

0.15
7.00
4.00

2.00
0.25

6.00
15.00
0.60
0.90
8.00
0.90
10.00

6.00
6.00
4.00

0.30
0.20
0.06
0.06
0.03
6.30
2.00
15.00

0.30
0.90
0.55
0.10
1.60
1.25

0.20
0.15
0.05
0.05
0.03
6.00
3.00
16.00

0.25
0.66
2.00

10

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

400/220 kV S/S AT,


WARANGAL

Kankroli

Kaithal

Tirunelveli

Shubashgram

C-52705-S919A3/LOA-II/1842 DT:
02/11/2005

C-42406-S919A3/LOA-I/1237 & 1238


DT: 30/01/2004

May-05

Sep-03

Ref-C-55807-S119AC-13502-S919AC-1128-S948-3/LOA7/LOA-I-2020 &
3/LOA-I/1905 & 2021
I/1064 DT:
2021 DATED
DT: 16/01/2006
28/03/2003
31/03/2006
Aug-05

May-05

Jun-02

723.28

31.12
7.12
4.84
5.75
6.83
0.99

40.17
46.08
7.22
5.21
7.99
9.45
1.44

29.73
3.27
2.30
5.91
7.01
1.47

31.36
27.93
5.14
4.31
6.59
7.72
1.32

29.44
27.41
5.08
4.07
7.51
8.76
1.50

9.79
8.17
18.28
11.61
68.28

10.84
9.04
15.03
12.83
13.12
133.64

1.44
1.13
10.60
5.21
5.16

10.45
9.73
17.99
27.66
13.67
210.46

2.59
5.26
16.90
9.80
29.66

12.74
12.74
3.44
3.51
2.53
2.72
2.33
1.98
2.81
0.52
9.79
8.17
18.28

12.46
12.46

10.92
10.92
1.81
1.91
1.79
2.88
2.43
2.01
2.93
0.62
1.44
1.14
9.82

12.08
12.08
2.50
2.50
2.50
3.22
2.80
2.43
3.38
0.60
10.45
9.73
17.99

12.02
12.76
2.34
2.44
2.44
3.42
2.91
2.42
3.51
0.59
5.26
2.59
13.34

3.79
3.85
2.81
3.72
3.18
3.40
3.91
0.75
10.84
9.04
15.03

47.84

61.22

10.36
6.21
0.64
5.68
0.63
0.57
0.27
0.31

7.42
5.70
0.85
0.17
-

73.68

18.46

5.60
3.04
-

6.89
4.95
0.70
0.21
0.32

3.97
2.79
0.94
0.09
0.57

0.10
11.71
5.19
3.46
1.18
1.30
1.06
5.47
1.66
1.20
1.10
15.05
0.41
-

15.76
6.98
4.65
1.58
4.34
1.74
6.38
1.93
1.64
1.50
19.35
0.49
-

8.73
4.23
1.11
0.34
3.07
1.86
5.22
1.22
1.78
1.13
10.81
-

0.14
13.93
6.32
3.37
0.76
1.38
1.25
5.58
1.76
2.46
1.59
23.57
0.29
-

12.75
6.33
3.79
1.25
1.44
1.37
4.57
1.66
1.56
1.10
12.09
-

11

12

13

14

15

PGCIL

PGCIL
Amritsar

PGCIL
Ludhiyana,
Extn of Jalandhar
& Malerakotla

PGCIL

Raigarh

PGCIL
Kolar,Munirabad &
Somanahalli extn
works

C-32306-S919A3/LOA-I/1424 DT:
11/10/2004
Mar-04

C-21501-S919ALTCD/EIC/PGCIL/56
3/LOA-I/1349 & 1350 004/ONLN /2005/101
Sep-03

Nov-04

Fatehabad

C-21702-S919A3/LOA-I/1759

C-21703-S919A3/LOA-I/1718

Oct-04

Oct-04

30.67
28.10
4.77
3.82
7.17
8.27
1.30

29.29
5.50
4.25
9.20
10.15
1.30

33.55
5.85
6.10
2.03
1.36

33.91
6.05
5.03
7.73
9.03
1.51

26.76
4.73
2.88
8.67
10.11
1.48

3.50
1.94
15.68
8.56
6.42
89.02

2.22
1.50
23.54
6.02
16.94

21.48
15.82
24.54
19.82
14.82
244.09

8.29
8.14
20.38
20.78
13.45
107.45

12.19
12.24
2.36
2.40
2.23
3.70
3.15
2.60
3.81
0.62
4.23
2.33
18.44

12.10
12.10
2.05
2.07
2.32
3.28
2.82
2.53
3.77
0.45
2.22
1.50
23.54

14.21
14.21
2.96
2.96
2.89
2.38
1.27
0.86
0.69
-

14.72
14.72
2.84
2.84
2.65
3.57
3.07
2.94
3.65
0.63
21.48
15.82
24.54

12.35
12.35
2.37
2.44
1.90
3.58
4.31
3.03
4.28
0.59
8.29
8.14
20.38

56.00

16.94

4.59
3.71
0.61
0.12
0.57

5.11
2.54
-

86.27

55.58

5.27
4.40
-

6.81
4.90
-

0.16
14.94
6.79
3.62
0.82
1.48
1.34
6.34
1.87
1.52
1.29
13.46
0.25
-

5.62
4.35
2.11
0.55
1.23
1.16
5.22
1.19
2.08
1.18
13.00
0.30
-

8.78
6.34
2.27
0.51
1.89
1.52
6.59
1.79
1.77
1.52
18.78
-

9.12
10.24
3.46
0.62
3.18
2.80
7.71
1.71
2.95
1.74
18.71
-

16

17

18

19

20

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Gwalior

Patna

Muzaffarpur &
Biharsheriff

Narendra

Melakottaiyur

.C-324054-S9193/LOA-I/1549 DT: 1403-05

:C-45907-S919A3/L0A-I/1708

C-42407-S919A3/LOA-I/1294
DT: 29/03/2004

C-55102-S919A3/LOA-1/1208 dt:
31/12/2003:

C-56103-S919A3/LOA-I/1921
dated 31/01/2006

Oct-04

Aug-04

Sep-03

Sep-03

May-05

38.66
32.76
5.84
4.87
4.99
7.46
8.68
1.46

39.87
29.13
5.76
3.74
8.36
9.55
1.67

43.36
5.04
5.81
9.01
2.70

24.71
4.55
2.79
8.75
10.02
1.78

39.67
6.96
5.05
8.82
10.22
1.39

20.78
15.29
23.68
19.11
14.37
234.94

4.26
3.22
30.32
19.17
13.52
181.96

2.67
1.94
16.37
9.38
6.18

11.19
9.64
18.75
11.78
8.59
123.29

14.31
14.31
2.74
2.74
2.55
3.46
2.97
2.49
3.54
0.61
20.78
15.29
23.68

12.62
12.62
2.83
2.99
2.58
3.68
3.16
2.63
3.78
0.57
4.19
3.16
29.83

11.79
11.79
2.05
2.47
1.74
3.75
3.12
2.58
3.68
0.66
2.67
1.94
15.95

16.49
16.49
3.57
3.63
2.76
3.88
3.36
2.87
4.06
0.72
11.19
9.64
18.75

82.91

90.63

48.51

5.07
4.45
0.76
0.12
0.52

4.01
3.45
1.03
0.57
0.56

7.28
7.28
3.62
0.86
0.27

7.28
6.34
3.98
0.82
0.51

0.39
8.48
6.12
2.20
0.49
1.84
1.47
6.36
1.65
1.71
1.47
18.33
0.48
-

0.31
10.68
8.32
3.55
1.28
1.96
1.86
9.85
2.99
1.75
1.30
14.68
0.31
-

0.40
0.12
9.88
6.79
2.70
0.60
2.36
1.70
5.37
1.53
2.15
1.50
20.06
0.38

0.39
0.18
15.14
6.71
4.47
1.52
1.68
1.37
5.48
1.63
1.52
1.32
18.62
0.39

21

22

23

24

25

26
NSPCL -Sail
RVPN
APTRANSCO
MSETCL
MSETCL
MSETCL
power company
Khaparkheda NSPCL -Sail
Jaisalmer Malkaram KoradiChakan- MSETCLMSETCLpower company
Rajasthan State
A.P.TRANSCO
Maharastra
Maharastra
Maharastra
for Bilai steel plant
RVPN:400 kV
OM - 0332
REF:
REF:
REF:
LOA No.C&M-101Design/Xtn(Tr)/TN- CE/Const./400KV/
No.MSETCL/CO/ No.MSETCL/CO/
TBMS/08/E1036/P
231-080-9-FC231/Supply/PO274
SE.PM-II/D2Tr.
Tr.
D Rev 01 DT
NOA-6 dated
/D.1236. Jaipur A1/MLKM/Supply/
Proj./TKP/2007Proj./TKP/200712.5.09
15.12.2005
Dt:22-04-08
D. No. 604/2008
08/23 DT: 30-11- 08/23 DT: 30-11Oct-07
Mar-08
Jan-09
Oct-07
Oct-07
Aug-05

414.69

790.61

691.81

392.75

391.50

26.61
5.15
3.60
8.59
9.67
1.02

32.91
7.14
4.39
6.70
7.92
1.30

24.77
5.46
3.26
4.59
5.28
1.53
1.01

38.21
38.21
7.26
4.65
4.08
5.03
2.05
1.49

35.76
35.76
6.80
4.35
1.39

37.51
33.93
6.34
5.07
4.07
4.64
0.99

13.71
16.07
16.39
11.10
109.30

6.70
4.54
14.74
17.87
44.16

10.54
22.18
25.19
133.58

20.36
26.10
37.90

16.94
35.69

11.61
2.50
4.72
3.80
0.32
13.71

13.98
13.98
3.69
3.20
3.67
3.23
0.55
4.34
12.97

11.24
3.48
3.92
3.20
2.86
0.38
17.14

16.05
4.14
1.67
1.14
0.51
-

15.02
3.87
0.48
-

14.04
14.05
4.53
3.40
3.09
2.53
2.09
3.14
0.37
-

71.14

74.16

13.12
10.44
2.24
-

7.97
6.99
0.56
0.84
0.84
0.42
-

85.51

10.09
-

10.09
-

5.11
2.54
-

16.65
14.52
4.34
1.11
3.59
3.45
17.43
3.80
3.70
1.79
17.61
-

0.48
12.09
11.48
5.02
2.80
3.19
10.41
7.92
10.38
3.54
21.18
-

0.33
13.26
7.56
0.65
5.10
3.19
7.50
2.82
3.67
2.86
-

0.33
13.26
7.56
0.65
5.10
3.19
7.50
2.82
3.67
2.86
-

5.62
4.35
2.11
0.55
1.23
1.16
5.22
1.19
2.08
1.18
13.00
0.30
-

27

28

29

30

31

32

PGCIL
Shulajpur(New),
Dehgam & VAPI
(Extn Works)
55701-S1163/LOA-1/2582
&2583 Dated 1407-2008

PGCIL

PGCIL
(Extn Works),
GWALIOR,
WARDHA,

PGCIL

PGCIL

PGCIL

Pirana,Gwaliar &
Bina

GIS New Delhi

Gwalior

Dec-07

Mandola,Malerakotla
Biharsherief,
C-00703 -S-9163/LOA-1/2340:
DT:18-04-2007
Dec-06

C-33501-S11633501-S116C-41414-S919 A- C-32404-S1163/LOA-1/2534 &


3/LOA-I/2534 DT:
I/1553
3I/1LOA/1582
2535 Dt:02-0502-05-2008 :
DT:29-03-2005 : DT: 24-03-2005 :
2008
Jul-07

Jul-07

Aug-04

Aug-04

800.83

896.00

837.75

870.00

533.32

530.36

33

34

35

36

37

38

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Batapara

Amritsar

Navi Mumbai

Kota

Kankroli

Ludhiyana

C-32404-S1163I/1LOA/1582
DT: 24-03-2005 :
Aug-04

C-22101-S916- C-33402-S119A3/LOA/1980 DT:


3/LOA-II/2472
02-03-2006
DT:20/03/2008:
Sep-05

Nov-07

534.69

708.39

C-13501-S9173/LOA/1730
Sep-04

C-21702-S916C-13501-S9173/LOA/1535 DT:
3/LOA/1730
07-03-2005 :
Sep-04

Jul-04

522.40

522.97

544.81

1,023.72

39

40

41

42

43

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Fathebad

Moga

Sonepat

Khandwa

Dehgan

C-14404-S-116C-33601-S117C-21702-S916- C-22101-S9163/C-156/LOA7/LOA-I/2458 &


3/LOA/1535 DT: 3/LOA/1980 DT:
12462 DT;20-03LOA -II / 2459
07-03-2005 :
02-03-2006 :
08
DT:05-03-2008 :
Jul-04

Sep-05

Sep-07

Aug-07

C-33601-S117-7/LOAI/2458 & LOA -II /


2459 DT:05-03-2008 :
Aug-07

544.81

841.35

642.70

408.00
-

412.00
-

44

45

PGCIL
765 kV & 400 kV
pooling station- Bihar
sherief

PGCIL
Ludhiyana

C-14803-S117-3/LOAC-21702-S9171/2708:
3/LOA/1664 DT: 04-05DT:22-10-2008 :
2005 :
Apr-08

Jul-04

323.25
-

23.72
0.95

258.00
-

46

47

48

49

50

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Udamalpet & Trichi

Fathebad

Patna

Ranchi

Trivandrum, &
Madurai

C -56401 - S117 - 3 / C -56401 - S117 - 3 /


C-21702-S917C-45906-S917LOA - 1 / 2478 DT: 25 LOA - 1 / 2478
3/LOA/1664 DT: 04- 3/LOA/1438 DT:
03 - 2008 :
DT: 25 - 03 - 2008 :
05-2005
20-10-2004 :
Sep-07

Sep-07

Jul-04

Mar-04

C-45906-S9173/LOA/1438 DT:
20-10-2004
Mar-04

228.00

217.25

228.00

354.50
-

350.90
-

217.00
-

205.00
16.60
1.30

51

52

53

54

55

56

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL
Bihar
Sharif,Sasaram &
Ranchi

PGCIL

Gaya, DVC &


Maithon
C -33701 - S117 C -47208 C-45906-S917- 3 / P-165/LOA- C-13501-S917- C-13501-S917- C -47208 - S117 - S117 - 3 / LOA 3/LOA/1438 DT: 1/2584 & 2585
3/LOA/1730
3/LOA/1730
3 / LOA - 1 / 2706
1 / 2706
20-10-2004 :
Dt:18-10-04
Dt:18-10-04
DT: 22 -10 - 2008
DT: 14 - 07 DT: 22 -10 2008 :
2008
Mar-04
Dec-07
Jan-05
Sep-04
Apr-08
Apr-08
Bihar Sharif

Shujalpur

Kankroli

Kota

237.25

256.30

409.35
-

408.50
-

333.90
23.30
0.95

234.50
17.60
1.60

320.90
23.60
0.95

322.25
23.65
0.95

57

58

59

60

61

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Lucknow

Agra

Fatepur

Balia

Allahabad

C -14803 - S117 - 3 C -14803 - S117 - 3 C -00704 - S917 - 3


C -47208 - S117 - 3 C -47208 - S117 - 3
/ LOA - 1 / 2708 & / LOA - 1 / 2708 & / LOA - 1 / 2365 &
/ LOA - 1 / 2706
/ LOA - 1 / 2706
2709
2709
2366
DT: 22 -10 - 2008 DT: 22 -10 - 2008
DT:22 - 10 - 2008 : DT:22 - 10 - 2008 : DT: 25 - 06 - 2007
Apr-08

Apr-08

Apr-08

Apr-08

Dec-06

405.30
-

404.15
-

404.15
347.65

408.15
-

319.05
23.45
0.95

23.45
0.95

312.50
-

62

63

64

65

PGCIL

PGCIL

PGCIL

PGCIL

Itarsi

Vijayawada

Rourkela

Tiruvanneli

C -00704 - S917 - 3 C -00704 - S917 - 3 C -00704 - S917 C-45906-S917/ LOA - 1 / 2365 & / LOA - 1 / 2365 & 3 / LOA - 1 / 2365
3/L0A/1438
2366
2366
& 2366
DT:13-06-2005:
DT: 25 - 06 - 2007 DT: 25 - 06 - 2007 DT: 25 - 06 - 2007
Dec-06

Dec-06

Dec-06

May-05

307.00
-

312.00
-

316.00
-

274.85
16.75
2.25

CERC
Capital Cost Benchmarking
Month and Year of Escalation

Jan-09

Project Costs (Escalated)


1
Name of the Utility

Name of sub-station

Month and Year of Commissioning

S.No.

Name of the Component

ICT 400/3/220 3/ 33KV,167 MVA, single phase autotransformer


including Insulating Oil Frieght & Insurance
I.C.T 315 MVA, 3 Phase, 400/220/33 KV including including
Insulating Oil Frieght & Insurance

INR Lakhs

ICT 400/3/220 3/ 33KV,105 MVA, single phase autotransformer


including Insulating Oil Frieght & Insurance

INR Lakhs

d)

I.C.T 250 MVA, 3 Phase, 400/220/33 KV including including


Insulating Oil Frieght & Insurance

Shunt Reactor

a)

420KV, 125 MVAR, 3-Phase Shunt Reactor

INR Lakhs

b)
c)

420KV, 80 MVAR, 3-Phase Shunt Reactor


420KV, 63/50 MVAR, 3-Phase Shunt Reactor

INR Lakhs
INR Lakhs

NGR with oil, for above 400 kV Shunt Reactor


Surge Arrestors 120 kV for NGR

INR Lakhs

f)

Spares for NGR &120KV SA

INR Lakhs

Bus Reactor
125 MVAR 400 kV

INR Lakhs

b)
c)
d)
e)
f)

80 MVAR 400 kV
63 / 50 MVAR 400 kV
50 MVAR
Oil for shunt Reactor
Spares for Bus Reactor

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

420 kV Equipments

a)
b)
c)
d)
e)

420 kV Breakers with CR


420 kVBreakers without CR
420 kV CTs 2000A, 40KA, 5-Core,
420 kv CVT 4400 PF
420 kv CVT 8800 PF
420 KV,2000 A,40 kA Isolators 3-Phase with one E/S (3 Phase) with
insulators

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

Line protection panel


Transformer protection panel(both HV and MV)
Reactor protection panel
Bus Bar Protection Panel

245 kV Equipment

a)

Circuit Breakers 245 kV


1600 A, 40 kA

41

42

MSETCL

MSETCL

MSETCL

NSPCL -Sail power


company for Bilai steel
plant

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Malkaram A.P.TRANSCO

Koradi- Maharastra

Khaparkheda MSETCL- Maharastra

Chakan- MSETCLMaharastra

NSPCL -Sail power


company for Bilai steel
plant

Shulajpur(New),
Dehgam & VAPI
(Extn Works)

Mandola,MalerakotlaB
iharsherief,
Hyderabad &
Durgapaur

(Extn Works),
GWALIOR, WARDHA,
PUNE, RAIPUR

Pirana,Gwaliar & Bina

GIS New Delhi

Gwalior

Batapara

Amritsar

Navi Mumbai

Kota

Kankroli

Ludhiyana

Fathebad

Moga

Sonepat

Khandwa

Oct-07

Mar-08

Jan-09

Oct-07

Oct-07

Aug-05

Dec-07

Dec-06

Jul-07

Jul-07

Aug-04

Aug-04

Aug-04

Sep-05

Nov-07

Sep-04

Sep-04

Jul-04

Jul-04

Sep-05

Sep-07

Aug-07

692.45

Firewalls for Single Phase ICT & Reactors

Common Equipments

712.14

414.69

43

44

PGCIL

Dehgan

Aug-07

382.21
-

381.00
-

817.62

797.02

877.07

799.23

829.99

874.30

869.46

876.55

771.40

779.29

780.14

838.52

838.52

699.87

815.75
-

33.32
7.62
5.18
-

43.78
50.22
7.87
5.68
-

41.80
4.59
3.23
-

34.18
30.44
5.61
4.70
-

38.77
36.10
6.69
5.35
-

35.83
32.83
5.57
4.46
-

38.57
7.24
5.60
-

37.49
6.54
-

5.26

6.16

8.71

8.31

7.18

9.89

8.38

12.11

6.82

8.04

7.31

10.30

9.86

8.41

11.53

9.66

13.37

1.05

1.06

1.57

2.07

1.44

1.97

1.52

1.71

6.46
5.23
27.21
17.01
181.78

6.44
6.44
13.58
18.76
13.63
159.75

5.36
5.61
13.30
17.19
12.54
96.37

9.79
8.17
18.28
11.61
68.28

10.84
9.04
15.03
12.83
13.12
133.64

1.44
1.13
10.60
5.21
5.16

10.45
9.73
17.99
27.66
13.67
210.46

2.59
5.26
16.90
9.80
29.66

3.50
1.94
15.68
8.56
6.42
89.02

2.22
1.50
23.54
6.02
16.94

15.51
15.51
2.46
2.60
2.24

13.28
13.28
2.66
2.71
2.23

12.66
11.06

2.55

15.57
16.37
3.26
3.26
3.47

1.86

13.64
13.64
3.69
3.75
2.71

13.58
13.58
4.13
4.20
3.06

15.35
15.35
2.55
2.68
2.52

13.16
13.16
2.72
2.72
2.72

15.83
16.80
3.08
3.21
3.21

14.24
14.30
2.76
2.80
2.60

15.93
15.93
2.70
2.73
3.05

15.88
15.88
3.31
3.31

3.15
2.67
2.25
3.28
0.41

3.40
2.86
2.35
3.57
0.52

3.10
2.73
2.41
3.25
0.64

3.95
3.35
3.86
4.17
0.56

2.25
1.60
2.48
1.99
0.62

2.95
2.53
2.15
3.05
0.56

4.05
3.47
3.71
4.26
0.82

4.05
3.42
2.83
4.12
0.87

3.51
3.05
2.65
3.68
0.65

4.50
3.83
3.19
4.62
0.77

4.32
3.68
3.04
4.45
0.72

4.32
3.71
3.33
4.96
0.59

3.23
2.66
1.42
0.96
0.77

5.23
5.23
18.52
111.98

6.44
6.44
13.58
50.22

5.61
5.36
13.30
45.50

9.79
8.17
18.28
47.84

10.84
9.04
15.03
61.22

1.44
1.14
9.82
-

10.45
9.73
17.99
73.68

5.26
2.59
13.34
18.46

4.23
2.33
18.44
56.00

2.22
1.50
23.54
16.94

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

INR Lakhs
INR Lakhs

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

2.92
3.04

6.28
6.28
24.86
65.70

INR Lakhs
INR Lakhs

15.00
15.00
10.00
1.25
0.50
0.10
0.10
0.05
3.00
4.00
0.05
0.50
0.50
0.40
0.10
0.10
0.40
2.50
0.40
0.20

INR Lakhs

1.00

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

411.75
-

28.91
5.45
3.45
-

INR Lakhs

f)

1.49

INR Lakhs
INR Lakhs

245 KV Circuit breakers


245 KV Isolators
245 KV Current Transformers
245 KV CVT
216 KV surge Arrestors
Towers , Lattice Type
BPI
L.T Transformers

9.41

1600A, 40 kA with one E/S S-phase

B.P.I.
Line( Wave) Traps both for 400 & 220 kV
220 kV equipments

8.20

1600A, 40 kA without E/S S phase


216 kV Surge Arrestors
220 kV Control & Potection Panel

420 KV Current Transformers


420KV CVT
390KV surge Arrestors
Towers , Lattice Type
Lightning cum Lighting Masts

35.05
27.61
5.20
3.13
-

INR Lakhs

420 KV Circuit breakers


420KV Isolators

1.77

INR Lakhs

e)

7.65

INR Lakhs
INR Lakhs

400 kV equipments

6.64

INR Lakhs

ICT -315 MVA


ICT -S-ph 167 MVA
Reactors

854.81

32.67
4.97
3.22
-

INR Lakhs

Foundations

1.07

1600A, 40 kA, DB Type with one E/S


1600A, 40 kA, DB, Tandem Type without E/S

Line protection panel


Bus Bar Protection panel

6.61

2500A, 40 KA, DB Type with Two E/S

863.27

5.44

8800 pf, S- Ph, with 3 secondaries

d)

36.17
7.65
5.86
-

4400 pf, S- Ph with 3 secondaries


Isolators 245 kV

a)
b)
c)

45

PGCIL

PGCIL

765 kV & 400 kV pooling


station- Bihar sherief
(Balia,Phathepur, Agra,
Lucknow)

Ludhiyana

Apr-08

Jul-04

46

47

PGCIL

Trivandrum, &
Madurai

Sep-07

48

49

50

PGCIL

51

52

53

54

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Udamalpet & Trichi

Fathebad

Patna

Ranchi

Bihar Sharif

Shujalpur

Kankroli

Kota

Sep-07

Jul-04

Mar-04

Mar-04

Mar-04

Dec-07

Jan-05

Sep-04

55

PGCIL

56

PGCIL

Bihar Sharif,Sasaram
& Ranchi

Apr-08

57

58

59

PGCIL

60

PGCIL

61

62

63

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

PGCIL

Gaya, DVC & Maithon

Lucknow

Agra

Fatepur

Balia

Allahabad

Itarsi

Vijayawada

Apr-08

Apr-08

Apr-08

Apr-08

Apr-08

Dec-06

Dec-06

Dec-06

2.21
2.26

2.27
1.52

37.94
6.77
5.63
-

29.94
5.30
3.22
-

43.26
36.66
6.53
5.45
5.58

44.65
32.63
6.45
4.19
-

57.10
6.64
7.65
-

32.54
6.00
3.68
-

43.24
7.59
5.50
-

8.65

9.70

8.35

9.36

11.86

11.52

10.10

11.31

9.71

10.69

1.69

1.66

1.63

1.87

25.10
4.86
3.40
-

29.48
6.40
3.93
-

24.77
5.46
3.26
-

36.04
36.04
6.85
4.39
-

9.61

8.10

6.00

4.59

3.85

4.36

13.19

11.14

9.12

7.09

5.28

4.74

4.97

3.56

2.34

1.51

0.96

1.16

1.53
1.01

1.93
1.41

21.48
15.82
24.54
19.82
14.82
244.09

8.29
8.14
20.38
20.78
13.45
107.45

20.78
15.29
23.68
19.11
14.37
234.94

16.47
16.47
3.18
3.18
2.97

13.82
13.82
2.65
2.73
2.13

3.99
3.44
3.29
4.08
0.70
21.48
15.82
24.54
86.27

33.73
33.73
6.41
4.10
-

1.31

1.06

4.26
3.22
30.32
19.17
13.52
181.96

2.67
1.94
16.37
9.38
6.18

11.19
9.64
18.75
11.78
8.59
123.29

13.71
16.07
16.39
11.10
109.30

6.70
4.54
14.74
17.87
44.16

10.54
22.18
25.19
133.58

20.36
26.10
37.90

16.94
35.69

14.40
14.40
2.76
2.76
2.57

14.14
14.14
3.17
3.35
2.89

15.52
15.52
2.70
3.25
2.29

17.97
17.97
3.89
3.95
3.01

10.95
2.36

12.52
12.52
3.31
2.87

11.24
3.48
3.92
-

15.14
3.90
-

14.17
3.65
-

15.03
15.04
4.85
3.64

4.01
4.82
3.39
4.79
0.66

3.48
2.99
2.51
3.56
0.61

4.12
3.54
2.95
4.23
0.64

4.94
4.11
3.40
4.85
0.87

4.23
3.66
3.13
4.43
0.78

4.45
3.58
0.30

3.29
2.89
0.49

3.20
2.86
0.38

1.58
1.08
0.48

0.45

3.36
2.75
2.27
3.41
0.40

8.29
8.14
20.38
55.58

20.78
15.29
23.68
82.91

4.19
3.16
29.83
90.63

2.67
1.94
15.95
-

11.19
9.64
18.75
48.51

13.71
71.14

4.34
12.97
74.16

17.14
85.51

415.79
-

307.22
22.54
0.90
-

397.09
-

343.71
-

340.22
-

350.92
333.99
-

357.68
337.51
27.33
1.36
-

375.38
-

390.61
-

332.31
23.19
0.99
-

345.14
25.90
2.35
-

382.33
-

389.05
304.99
22.43
0.99
-

388.24
306.27
22.48
0.99
-

385.20
-

384.11
303.23
22.29
0.99
-

384.11
330.41
22.29
0.99
-

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

17.98
17.19
13.05
6.73
2.93
0.79
1.49
1.34
6.17
1.69
2.93
2.26
17.63

8.84
5.89
0.87
7.38
2.96
1.80
4.06
0.16
0.41
0.07
8.79
5.78
2.73
1.16
0.97
0.91
5.70
1.41
3.56
2.66
19.62

12.71
10.53
1.01
5.60
2.53
2.53
6.44
0.13
0.63
0.11
11.29
10.96
2.76
0.79
3.16
3.16
4.57
1.21
2.35
1.79
22.21

15.48
14.98
1.27
6.35
0.85
0.85
0.18
0.62
0.04
12.85
12.96
4.75
0.86
2.25
2.16
5.11
1.45
2.85
1.83
24.75

12.18
7.30
0.75
6.68
0.74
0.67
0.27
0.36
0.10
11.71
5.19
3.46
1.18
1.30
1.06
5.47
1.66
1.20
1.10
15.05

9.30
7.14
1.07
-

8.57
4.66
-

8.63
6.21
0.88
-

7.01
4.92
1.66
-

7.33
5.92
0.97
-

9.03
4.49
-

8.28
6.91
-

10.70
7.70
-

5.28
4.64
0.79
-

6.38
5.49
1.64
-

12.86
12.86
6.39
1.52

9.12
7.95
4.99
1.03

13.12
10.10
2.17
-

0.17
15.76
6.98
4.65
1.58
4.34
1.74
6.38
1.93
1.64
1.50
19.35

8.73
4.23
1.11
0.34
3.07
1.86
5.22
1.22
1.78
1.13
10.81

0.21
0.38
0.14
13.93
6.32
3.37
0.76
1.38
1.25
5.58
1.76
2.46
1.59
23.57

0.09
0.67
12.75
6.33
3.79
1.25
1.44
1.37
4.57
1.66
1.56
1.10
12.09

0.12
0.67
0.16
14.94
6.79
3.62
0.82
1.48
1.34
6.34
1.87
1.52
1.29
13.46

5.62
4.35
2.11
0.55
1.23
1.16
5.22
1.19
2.08
1.18
13.00

8.78
6.34
2.27
0.51
1.89
1.52
6.59
1.79
1.77
1.52
18.78

9.12
10.24
3.46
0.62
3.18
2.80
7.71
1.71
2.95
1.74
18.71

0.12
0.61
0.39
8.48
6.12
2.20
0.49
1.84
1.47
6.36
1.65
1.71
1.47
18.33

0.57
0.66
0.31
10.68
8.32
3.55
1.28
1.96
1.86
9.85
2.99
1.75
1.30
14.68

0.32
0.40
0.12
9.88
6.79
2.70
0.60
2.36
1.70
5.37
1.53
2.15
1.50

0.60
0.39
0.18
15.14
6.71
4.47
1.52
1.68
1.37
5.48
1.63
1.52
1.32

16.65
14.52
4.34
1.11
3.59
3.45
17.43
3.80
3.70
1.79
17.61

7.05
6.18
0.50
21.39
20.31
0.42
0.48
12.09
11.48
5.02
2.80
3.19
10.41
7.92
10.38
3.54
21.18

10.09
0.33
13.26
7.56
0.65
5.10
3.19
7.50
2.82
3.67
2.86
-

9.77
0.33
13.26
7.56
0.65
5.10
3.19
7.50
2.82
3.67
2.86
-

6.01
2.99
5.62
4.35
2.11
0.55
1.23
1.16
5.22
1.19
2.08
1.18
13.00

INR Lakhs

6.21
5.24
1.86
7.22
3.64
3.39
4.37
0.10
0.15
0.18
9.40
9.75
3.08
1.23
2.05
1.52
6.39
1.94
1.50
1.06
13.39

High Wall Type Split AC unit of 2TR Capacity

INR Lakhs

0.36

0.44

0.30

0.32

0.37

0.41

0.49

0.29

0.25

0.30

0.48

0.31

20.06

18.62

0.30

h)

Illumination(Indoor and Outdoor)

INR Lakhs

0.38

0.39

10

PLCC equipments on 400 kV side (Both for 400 &


220 kV)

INR Lakhs

11

Mandatory Spares

INR Lakhs

12

Steel Structures - Unit MT

72.5KV , 1250A, 25KA Circuit Breaker


72.5KV, 25KA, 3 Core Current Transformer 3 Nos
72.5KV, 2 Core, 33kV /3 / 110 V/3 CVT / PT
Relay panel for 800 kVA Transformer on 72.5 kV side
11KV Horn gap Fuse
11KV Isolator without ES
11KV Surge Arrestor.
415V Main Switch Board
415V ACDB
415V MLDB
415V Emergency LDB
220V DCDB
50V DCDB
220V Battery

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

50V Battery
Battery Charger for 220V Battery
Battery Charger for 50V Battery

INR Lakhs
INR Lakhs
INR Lakhs

DG Set-250KVA with control panel

0.60
0.80

a)

Lattice Type

INR Lakhs

b)

Tubular support structures

INR Lakhs

13

Earth mat- 40 mm rods - Per kM

INR Lakhs

6.00

14

Bus Bar Materials

a)

400 kV Switchyard

INR Lakhs

160.00

Moose ACSR
Twin disc Ins. string with Tension Hardware fr Twin Moose
Twin disc Ins. string with Suspension Hardware fr Twin Moose
400KV BPI
Tee Clamp for Twin Moose to 4" IPS Al. Tube
Tee Clamp for Twin Moose to Twin Moose ACSR
PG Clamps
Spacer to Twin Moose ACSR
Ground wire and accessories
b)

220 kV Switchyard

INR Lakhs

180.00

15

Fire fighting Equipment including one 315 MVA


Transformer.

INR Lakhs

75.00

16

Power Cables -- Cost per kM

INR Lakhs

17

Control cables --- Cost per kM

INR Lakhs

18

Land devolopment & Civil engineering works

1.20
0.98

Soil Investigation (lump Sum)


Intial Civil Engineering Works like Levelling,Retaining walls,
Appoach Road, Peripheral Fencing etc. (lump Sum)
Ant weed treatment & Site Surfing Cost per Meter
Road work (Cost per Meter)
Storm water drain, Road culverts drain crossing, cable trench
crossing
Switch yard fencing
DG room & Fire fighting Room (FFPH)
Control room with cable vaults
Cable ducts
Providing water supply including drinking water & water for fire
fighting system and sewage system

INR Lakhs

2.00

INR Lakhs

70.00

INR Lakhs

5.00

Parking sheds,Rain water Harvesting systems & land scaping etc.

INR Lakhs

30.00

INR Lakhs
INR Lakhs

0.00
0.02

INR Lakhs

0.02

INR Lakhs

0.00
56.00
100.00
90.00

INR Lakhs
INR Lakhs
INR Lakhs

40.15
36.32
6.79
5.43
-

INR Lakhs

387.91
-

Control & Relay panel.


Complete Substation automation system for 400/230kV S/S including
hardware and software for remote control station alongthwith
associated equipments and Kiosks for the following bays ( bays) as
defined in the teechnical specification, Sec-Substaion Automation
LT Switchgear
800KVA 33/.400 KV Distribution Transformer
630KVA, 11/400VKV Distribution Transformer
72.5 kV Isolator with insulators

k)

40

APTRANSCO

Jaisalmer -Rajasthan
State

May-05

0.94

1600A, 40 kA, DB Type with two E/S

Circuit Breaker panel with Auto Reclose


Circuit Breaker panel without Auto Reclose

j)

39

RVPN

Melakottaiyur

Sep-03

7.34

INR Lakhs

j)

38

PGCIL

Narendra

Sep-03

6.35

INR Lakhs

f)

37

PGCIL

Muzaffarpur &
Biharsheriff

Aug-04

35.01
5.74
3.34
-

1600 A, 40 kA , 5 core, with 120% extended current

g)
h)

36

PGCIL

Patna

Oct-04

INR Lakhs

1600 A, 40 kA, 5 core, with 150% extended current


Capacitive Voltage Transformer 245 kV

e)

35

PGCIL

Gwalior

Oct-04

INR Lakhs
INR Lakhs

2500 A, 40 kA
Current Transformers 245 kV

b)

34

PGCIL

Fatehabad

Oct-04

INR Lakhs

c)

c)
d)

33

PGCIL

Ludhiyana,
Extn of Jalandhar
& Malerakotla

Nov-04

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

b)

a)

32

PGCIL

Kolar,Munirabad &
Somanahalli extn
works

Sep-03

12.87
12.87

Circuit Breaker panel with Auto Reclose


Circuit Breaker panel without Auto Reclose

d)
e)
f)

f)

31

PGCIL

Amritsar

Mar-04

g)

30

PGCIL

Raigarh

Sep-03

7.59
6.28
35.67
19.71
107.73

b)

29

PGCIL

Shubashgram

May-05

INR Lakhs
INR Lakhs

c)
d)
e)

28

PGCIL

Tirunelveli

Jun-02

400 kV Control and Protection Panel

b)

10

PGCIL

Kaithal

a)

PGCIL

May-05

420 KV,2000A,40 kA Isolators 3-Phase with two E/S with insulators

e)
f)

PGCIL

Kankroli

Aug-05

420 KV,2000A,40 kA Isolators one Phase with one E/S


Surge Arrestors 390 kV

d)

PGCIL

400/220 kV S/S AT,


WARANGAL

Aug-05

g)

c)

PGCIL

400/220 kV S/S,
KARAIKUDI(New)

Jan-06

h)
j)

a)
b)

PGCIL

400/220 kV S/S,
DAMOH (New)

Aug-05

INR Lakhs

e)

f)

PGCIL

400/220 kV S/S,
PUGALUR(New)

Apr-06

Unit

INR Lakhs

b)
c)

a)

PGCIL

400/220 kV S/S
AT,ROORKEE

Aug-05

Power Transformer

a)

d)

PGCIL

400/220 kV S/S,
ARASUR(New)

305.90
-

300.51
-

305.41
-

19
a)

Erection charges
Common equipments
Auxiliary Transformers,LT Switchgear, AC & DC Panels.72.5 kV
,33kV & 11 kV equipments etc.
Station D.C Batteries 220 V, 500 AH
Station D.C Batteries 50 V, 500 AH

INR Lakhs

Battery Charger System 220 V, 70A / 50 A Float cum Boost

INR Lakhs

I.C.T 315 MVA, 3Phase, 400/220/33 KV class

INR Lakhs

I.C.T 167 MVA, S-Phase, 400/220 kV ( Single Phase 167 MVA Units)

INR Lakhs

6.00

INR Lakhs

4.00
0.30
0.20
0.06
0.06
0.03
6.30
2.00
15.00
0.30
0.90
0.55
0.10
1.60
1.25
0.20
0.15
0.05
0.05
0.03
6.00
3.00
16.00
0.25
0.66
2.00

Fire Fighting System


Lightning & lightnening masts
Illumination System - Indoor & outdoor
ICTs ( Power Transformers)

Shunt & Bus Reactors 400 kV


400 kV equipments
420 KV Circuit breakers
420KV Isolators
420 KV Current Transformers
420KV CVT
390KV surge Arrestors
Towers , Beams Lattice Type
Tubular type pipe structures
Bus Bars formation etc.
Control & Protection panels
400KV CB relay Panel
400KV Line Protection Panel

220 kV Equipments
245 KV Circuit breakers
245 KV Isolators
245 KV Current Transformers
245 KV CVT
216 KV surge Arrestors

h)
i)
j)
k)

0.15
7.00
4.00
6.00
15.00
0.60
0.90
8.00
0.90
10.00
6.00

400-220/33KV Transformer Protection Panel


400KV Reactor Protection Panel
Duplicate Bus Bar Protection Panel - 400KV
PLCC Equipments (Both for 400 kV & 220 kV)
f)

0.20

INR Lakhs
INR Lakhs

Diesel Generator set with AMF panel 250 kVA

e)

2.00
0.25
0.10

INR Lakhs

Air Conditioning and Ventilation

b)

INR Lakhs

INR Lakhs

Power cables
Control cables
Earth mat 40 mm Rods ( Main Earth Mat)

c)
d)

INR Lakhs

Battery Charger System 50 V, 70 A / 50 A Float cum Boost


Common equipment pertaining to C&R system.( Automation)

220 kV Towers & beams


220 tubular pipe structures
220 kV Bus Bars formation etc
Control & Protection panels
Circuit breaker relay panel With Auto reclosure
Line protection panel
Single Bus Bar protection panel

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

64

65

PGCIL

PGCIL

Rourkela

Tiruvanneli

Dec-06

May-05

309.32
-

347.22
21.16
2.35
-

CERC
Capital Cost Benchmarking
Average Rates

S.No.

Name of the Component

Unit

Power Transformer

a)

ICT 400/3/220 3/ 33KV,167 MVA, single phase


autotransformer including Insulating Oil Frieght & Insurance

INR Lakhs

b)

I.C.T 315 MVA, 3 Phase, 400/220/33 KV including including


Insulating Oil Frieght & Insurance

INR Lakhs

c)

ICT 400/3/220 3/ 33KV,105 MVA, single phase


autotransformer including Insulating Oil Frieght & Insurance

INR Lakhs

d)

I.C.T 250 MVA, 3 Phase, 400/220/33 KV including including


Insulating Oil Frieght & Insurance

INR Lakhs

Shunt Reactor

a)
b)
c)
d)
e)
f)

420KV, 125 MVAR, 3-Phase Shunt Reactor


420KV, 80 MVAR, 3-Phase Shunt Reactor
420KV, 63/50 MVAR, 3-Phase Shunt Reactor
NGR with oil, for above 400 kV Shunt Reactor
Surge Arrestors 120 kV for NGR
Spares for NGR &120KV SA

Bus Reactor

a)
b)
c)
d)
e)
f)

125 MVAR 400 kV


80 MVAR 400 kV
63 / 50 MVAR 400 kV
50 MVAR
Oil for shunt Reactor
Spares for Bus Reactor

420 kV Equipments

a)
b)
c)
d)
e)

420 kV Breakers with CR


420 kVBreakers without CR
420 kV CTs 2000A, 40KA, 5-Core,
420 kv CVT 4400 PF
420 kv CVT 8800 PF

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

f)

420 KV,2000 A,40 kA Isolators 3-Phase with one E/S (3


Phase) with insulators

INR Lakhs

g)

420 KV,2000A,40 kA Isolators 3-Phase with two E/S with


insulators

INR Lakhs

h)
j)

420 KV,2000A,40 kA Isolators one Phase with one E/S


Surge Arrestors 390 kV

INR Lakhs
INR Lakhs

400 kV Control and Protection Panel

a)
b)
c)
d)
e)
f)

Circuit Breaker panel with Auto Reclose


Circuit Breaker panel without Auto Reclose
Line protection panel
Transformer protection panel(both HV and MV)
Reactor protection panel
Bus Bar Protection Panel

245 kV Equipment

a)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Circuit Breakers 245 kV


INR Lakhs
INR Lakhs

b)

1600 A, 40 kA
2500 A, 40 kA
Current Transformers 245 kV

INR Lakhs
INR Lakhs

c)

1600 A, 40 kA , 5 core, with 120% extended current


1600 A, 40 kA, 5 core, with 150% extended current
Capacitive Voltage Transformer 245 kV

INR Lakhs
INR Lakhs

d)

8800 pf, S- Ph, with 3 secondaries


4400 pf, S- Ph with 3 secondaries
Isolators 245 kV

e)
f)

1600A, 40 kA, DB Type with two E/S


1600A, 40 kA, DB Type with one E/S
1600A, 40 kA, DB, Tandem Type without E/S
2500A, 40 KA, DB Type with Two E/S
1600A, 40 kA with one E/S S-phase
1600A, 40 kA without E/S S phase
216 kV Surge Arrestors
220 kV Control & Potection Panel

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Circuit Breaker panel with Auto Reclose


Circuit Breaker panel without Auto Reclose
Line protection panel
Bus Bar Protection panel

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

7
a)
b)
c)

Foundations
ICT -315 MVA
ICT -S-ph 167 MVA
Reactors

INR Lakhs
INR Lakhs
INR Lakhs

d)

e)

400 kV equipments
420 KV Circuit breakers
420KV Isolators
420 KV Current Transformers
420KV CVT
390KV surge Arrestors
Towers , Lattice Type
Lightning cum Lighting Masts
B.P.I.
Line( Wave) Traps both for 400 & 220 kV
220 kV equipments
245 KV Circuit breakers
245 KV Isolators
245 KV Current Transformers
245 KV CVT
216 KV surge Arrestors
Towers , Lattice Type
BPI

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

f)

L.T Transformers

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Firewalls for Single Phase ICT & Reactors

INR Lakhs

Common Equipments

a)

Control & Relay panel.


Complete Substation automation system for 400/230kV S/S
including hardware and software for remote control station
alongthwith associated equipments and Kiosks for the
following bays ( bays) as defined in the teechnical
specification, Sec-Substaion Automation
LT Switchgear

b)

800KVA 33/.400 KV Distribution Transformer


630KVA, 11/400VKV Distribution Transformer
72.5 kV Isolator with insulators
72.5KV , 1250A, 25KA Circuit Breaker
72.5KV, 25KA, 3 Core Current Transformer 3 Nos
72.5KV, 2 Core, 33kV /3 / 110 V/3
CVT / PT
Relay panel for 800 kVA Transformer on 72.5 kV side
11KV Horn gap Fuse
11KV Isolator without ES
11KV Surge Arrestor.
415V Main Switch Board
415V ACDB
415V MLDB
415V Emergency LDB

INR Lakhs

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

220V DCDB
50V DCDB
220V Battery
50V Battery
Battery Charger for 220V Battery
Battery Charger for 50V Battery
DG Set-250KVA with control panel
High Wall Type Split AC unit of 2TR Capacity
Illumination(Indoor and Outdoor)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

10

PLCC equipments on 400 kV side (Both for 400 &


220 kV)

INR Lakhs

11

Mandatory Spares

INR Lakhs

12

Steel Structures - Unit MT

b)
c)
d)
e)
f)
g)
h)

a)
b)

Lattice Type
Tubular support structures

13

Earth mat- 40 mm rods - Per kM

14

Bus Bar Materials

a)

400 kV Switchyard
A
Moose ACSR
Twin disc Ins. string with Tension Hardware fr Twin Moose
Twin disc Ins. string with Suspension Hardware fr Twin Moose
400KV BPI
Tee Clamp for Twin Moose to 4" IPS Al. Tube
Tee Clamp for Twin Moose to Twin Moose ACSR
PG Clamps
Spacer to Twin Moose ACSR
Ground wire and accessories
220 kV Switchyard
Quad disc Ins. string with Tension Hardware fr Quad Moose
Twin disc Ins. string with Suspension Hardware fr Quad
Moose
Twin disc Ins. string with Tension Hardware fr Twin Moose
Twin disc Ins. string with Suspension Hardware fr Twin Moose
220KV BPI
4" IPS Al. Tube
Moose ACSR
Tee Clamp for Quad Moose to Twin Moose ACSR

b)

INR Lakhs
INR Lakhs
INR Lakhs

INR Lakhs

INR Lakhs

Tee Clamp for Twin Moose to Twin Moose ACSR


Tee Clamp for Twin Moose to 4" IPS Al. Tube
Spacer to Quad Moose ACSR
Spacer to Twin Moose ACSR
PG Clamps
Ground wire and accessories

15

Fire fighting Equipment including one 315 MVA


Transformer.

INR Lakhs

16

Power Cables -- Cost per kM

INR Lakhs

17

Control cables --- Cost per kM

INR Lakhs

18

Land devolopment & Civil engineering works

a)

Soil Investigation (lump Sum)

INR Lakhs

b)

Intial Civil Engineering Works like Levelling,Retaining walls,


Appoach Road, Peripheral Fencing etc. (lump Sum)

INR Lakhs

c)
d)
e)
f)
g)
h)
j)
j)
k)

Ant weed treatment & Site Surfing Cost per Meter


Road work (Cost per Meter)
Storm water drain, Road culverts drain crossing, cable trench
crossing
Switch yard fencing
DG room & Fire fighting Room (FFPH)
Control room with cable vaults
Cable ducts
Providing water supply including drinking water & water for
fire fighting system and sewage system
Parking sheds,Rain water Harvesting systems & land scaping
etc.

19

Erection charges

a)

Common equipments
Auxiliary Transformers,LT Switchgear, AC & DC Panels.72.5
kV ,33kV & 11 kV equipments etc.
Station D.C Batteries 220 V, 500 AH
Station D.C Batteries 50 V, 500 AH
Battery Charger System 220 V, 70A / 50 A Float cum Boost
Battery Charger System 50 V, 70 A / 50 A Float cum Boost
Common equipment pertaining to C&R system.( Automation)
Power cables
Control cables
Earth mat 40 mm Rods ( Main Earth Mat)
Diesel Generator set with AMF panel 250 kVA

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Air Conditioning and Ventilation


Fire Fighting System
Lightning & lightnening masts
Illumination System - Indoor & outdoor
ICTs ( Power Transformers)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

e)

I.C.T 315 MVA, 3Phase, 400/220/33 KV class


I.C.T 167 MVA, S-Phase, 400/220 kV ( Single Phase 167
MVA Units)
Shunt & Bus Reactors 400 kV
400 kV equipments
420 KV Circuit breakers
420KV Isolators
420 KV Current Transformers
420KV CVT
390KV surge Arrestors
Towers , Beams Lattice Type
Tubular type pipe structures
Bus Bars formation etc.
Control & Protection panels

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

f)

400KV CB relay Panel


400KV Line Protection Panel
400-220/33KV Transformer Protection Panel
400KV Reactor Protection Panel
Duplicate Bus Bar Protection Panel - 400KV
PLCC Equipments (Both for 400 kV & 220 kV)
220 kV Equipments

h)
i)
j)
k)

245 KV Circuit breakers


245 KV Isolators
245 KV Current Transformers
245 KV CVT
216 KV surge Arrestors
220 kV Towers & beams
220 tubular pipe structures
220 kV Bus Bars formation etc
Control & Protection panels

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Circuit breaker relay panel With Auto reclosure


Line protection panel
Single Bus Bar protection panel

INR Lakhs
INR Lakhs
INR Lakhs

b)

c)
d)

INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs
INR Lakhs

Average Rate
Final Rates Excluding Taxes
and Duties

414.69

414.69

815.97

815.97

381.60

381.60

699.87

699.87

383.71
364.55
327.52
23.29
1.33
-

383.71
364.55
327.52
23.29
1.33
-

38.54
35.25
6.26
4.52
5.58

38.54
35.25
6.26
4.52
5.58

7.82

7.82

8.99

8.99

1.91
1.55

1.91
1.55

8.32
6.61
19.64
16.19
12.29
107.15

8.32
6.61
19.64
16.19
12.29
107.15

14.35
14.65
3.03
3.25
3.10
2.74
3.76
3.17
2.81
3.94
1.42
0.96
0.61
8.02
6.45
18.18
63.46
15.00
15.00
10.00

14.35
14.65
3.03
3.25
3.10
2.74
3.76
3.17
2.81
3.94
1.42
0.96
0.61
8.02
6.45
18.18
63.46

15.00
15.00
10.00

1.25
0.50
0.10
0.10
0.05
3.00
4.00
0.05
0.50

1.25
0.50
0.10
0.10
0.05
3.00
4.00
0.05
0.50

0.50
0.40
0.10
0.10
0.40
2.50
0.40
0.20

0.50
0.40
0.10
0.10
0.40
2.50
0.40
0.20

1.00
-

1.00

250.00

250.00

66.21
9.62
7.79
1.79
5.11
5.35
4.92
4.96
0.21
0.39
0.24
10.03
8.66
3.80
1.08

66.21
9.62
7.79
1.79
5.11
5.35
4.92
4.96
0.21
0.39
0.24
10.03
8.66
3.80
1.08

2.25
1.89
6.45
2.41
2.62
1.76
20.23
0.34
55.00
-

2.25
1.89
6.45
2.41
2.62
1.76
20.23
0.34
55.00

76.00

76.00

175.00

175.00

0.60
0.80
-

0.60
0.80

6.00

6.00

160.00
180.00
-

160.00

180.00

75.00
1.20
0.98
2.00

75.00

1.20
0.98

2.00

70.00

70.00

0.00
0.02

0.00
0.02

0.02

0.02

0.00
56.00
100.00
90.00

0.00
56.00
100.00
90.00

5.00

5.00

30.00

30.00

2.00

2.00

0.25
0.10
0.20
0.15
7.00
4.00
6.00
15.00
0.60

0.25
0.10
0.20
0.15
7.00
4.00
6.00
15.00
0.60

0.90
8.00
0.90
10.00
6.00

0.90
8.00
0.90
10.00

6.00

6.00

4.00
0.30
0.20
0.06
0.06
0.03
6.30
2.00
15.00
0.30
0.90
0.55
0.10
1.60
1.25
0.20
0.15
0.05
0.05
0.03
6.00
3.00
16.00
0.25
0.66
2.00

4.00
0.30
0.20
0.06
0.06
0.03
6.30
2.00
15.00
0.30
0.90
0.55
0.10
1.60
1.25
0.20
0.15
0.05
0.05
0.03
6.00
3.00
16.00
0.25
0.66
2.00

6.00

CERC
Capital Cost Benchmarking
BOQ & Cost for 400 / 220 KV Sub
Station of various combinations of
S.No

Description

1
1-A

Common General Works


Land dev olopment & Civ il engineering works

a)

Soil Investigation (lump Sum)


Intial Civil Engineering Works like Levelling,Retaining
walls,Appoch Road,Peripheral Fencing etc (lump Sum)
Ant weed treatment & Site Surfing Cost per Meter

b)
c)
e)
d)
e)
f)
g)
h)
i)
j)

1-B
a)

Road work (Cost per Meter)


Storm water drain, Road culverts drain crossing, cable trench
crossing
Switch yard fencing
DG room & Fire fighting Room (FFPH)
Control room with cable vaults
Cable ducts
Providing water supply including drinking water & water for fire
fighting system and sewage system
Parking sheds,Rain water Harvesting systems & land scaping
etc.,
Sub-Total -1-A

Rate

Quantity

ii
b)
c)

1.00

70.00
0.000502

130,600.00

Metre

0.02

Metre
Metre
No
No
Lump Sum

0.02
0.00
56.00
100.00
90.00

Lump Sum

5.00

Lump Sum
INR Lakhs

30.00

Station D.C Batteries 220 V, 500 AH


Station D.C Batteries 50 V, 500 AH

Set
LumpSum

0.20

Set
Set

6.45
2.41

Battery Charger System 220 V, 70A / 50 A Float cum Boost

Set

2.62

Battery Charger System 50 V, 70 A / 50 A Float cum Boost


Sub-Station Automation including Hardware, software, Remote
Control Station, DMT scheme along with associated equipment
and kiosks

Set

1.76

Set

250.00

Power Cables
Control Cables
Earth mat - 40mm dia MS rods
Diesel Generator set along with AMF panel 250 kVA
A/C and ventilation - High Valve Type split AC unit of 2TR
capacity
Fire fighting system
Illumination System - Indoor and Outdoor
Mandatory spares
Sub Total -1-B

Km
Km
Km
Set

1.20
0.98
6.00
20.23

No.

0.34
75.00
55.00
175.00

l)
m)
o)
p)

1-C

1.00

Quantity
2.00

1.00

70.00

1.00

65.55

109,000.00

52.82

2,900.00

Amount

Quantity
2.00

Amount
1.00

70.00

1.00

54.70

125,200.00

Quantity
2.00

Amount
1.00

70.00

1.00

62.84

103,600.00

52.82

2,900.00

52.82

1,700.00

33.07

2,120.00

33.07

2,120.00

33.07

2,000.00

2,052.00
1.00

1.48
56.00
100.00
94.50

2,052.00
1.00

1.48
56.00

1,944.00
1.00

1.40
56.00

1,836.00

1.00
1.05

1.00
1.00

100.00
90.00

1.00
1.00

100.00
90.00

1.00
0.85

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

30.00

1.00

30.00

1.00

30.00

1.00

30.00

1.00

1.00

2,900.00

Amount

2,120.00

1.48
100.00
81.00

1.00

1.00

130,600.00

52.82

56.00

1.00
0.90

480.41

465.07

1.00

473.12

Quantity
2.00

Amount
1.00

70.00

1.00

51.99

103,600.00

Quantity
2.00

Amount
1.00

70.00

1.00

51.99

153,000.00

Quantity
2.00

Amount
1.00

70.00

1.00

76.79

176,400.00

Quantity
2.00

Amount
1.00

Quantity
2.00

Amount
1.00

70.00

1.00

70.00

1.00

88.53

238,800.00

119.85

173,800.00

Quantity
2.00

Amount
1.00

70.00

1.00

87.23

125,200.00

Quantity
2.00

Amount
1.00

70.00

1.00

62.84

114,400.00

Quantity
2.00

Amount
1.00

70.00

1.00

57.42

114,400.00

Quantity
2.00

Amount
1.00

70.00

1.00

57.42

173,800.00

Quantity
2.00

Amount
1.00

70.00

1.00

87.23

130,600.00

Quantity
2.00
70.00

Amount
1.00
1.00

30.96

1,700.00

30.96

3,360.00

61.20

3,500.00

63.75

3,750.00

68.30

3,360.00

61.20

1,700.00

30.96

1,700.00

30.96

1,700.00

30.96

3,360.00

61.20

2,900.00

52.82

103,600.00
1,700.00

31.20

2,000.00

31.20

2,520.00

39.31

2,720.00

42.43

4,487.45

70.00

2,520.00

39.31

2,000.00

31.20

2,000.00

31.20

2,000.00

31.20

2,520.00

39.31

2,120.00

33.07

2,000.00

1.32
56.00

1,836.00
1.00

1.32
56.00

2,164.00
1.00

1.56
56.00

2,632.00
1.00

1.90
56.00

2,944.00
1.00

2.12
56.00

2,268.00
1.00

1.63
56.00

1,944.00
1.00

1.40
56.00

1,890.00
1.00

1.36
56.00

1,890.00
1.00

1.36
56.00

2,268.00
1.00

1.63
56.00

2,052.00
1.00

1.48
56.00

1,836.00

100.00
76.50

1.00
0.85

100.00
76.50

1.00
1.20

100.00
108.00

1.00
1.25

100.00
112.50

1.00
1.50

100.00
135.00

1.00
1.20

100.00
108.00

1.00
0.78

100.00
70.20

1.00
0.78

100.00
70.20

1.00
0.85

100.00
76.50

1.00
1.30

100.00
117.00

1.00
1.23

100.00
110.70

1.00
1.00
0.85

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

5.00

1.00

30.00

1.00

30.00

1.10

33.00

1.10

33.00

1.10

33.00

1.10

33.00

1.00

30.00

1.00

30.00

1.00

30.00

1.10

33.00

1.00

30.00

1.00

424.98

424.98

519.85

542.10

628.27

530.37

429.60

424.14

430.44

539.37

65.55

496.61

Quantity
2.00
70.00

Amount
1.00
1.00

51.99
30.96

114,200.00
1,700.00

31.20

2,000.00

1.32

1,890.00

56.00
100.00
76.50

1.00
1.00
0.85

5.00

1.00

30.00

1.00

424.98

Quantity
2.00
70.00

Amount
1.00
1.00

Quantity
2.00

Amount
1.00

70.00

1.00

57.31
30.96

238,800.00
6,000.00

119.85
109.28

100,980.00
2,217.60

31.20

7,000.00

109.19

1,663.20

1.36

2,496.00

1.80

1,428.24

56.00
100.00
76.50

1.00
1.00
1.50

56.00
100.00
135.00

1.00
1.00
0.60

5.00

1.00

5.00

1.00

30.00

1.00

30.00

1.00

430.34

708.12

Quantity
2.00

1.00

2.00

Amount

Quantity
-

Amount
-

Quantity
-

Amount
-

Quantity
-

Amount
-

Quantity

Amount

Quantity
-

Amount
-

1.00
100,980.00
1,663.20

25.94

1,247.40

1.03

1,428.00

1.03

56.00
100.00
45.00

1.00
1.00
0.50

5.00

1.00

5.00

30.00

1.00

30.00

435.04

70.00

70.00
50.68
40.39

56.00
100.00
54.00

50.68
30.29

30.00

0.55

30.00

0.55

20.00

0.36

90.00

1.64

30.00

0.55

19.46

30.00

0.47

30.00

0.47

20.00

0.31

90.00

1.40

30.00

0.47

409.46

1.01

1.01

0.68

3.04

1.01

1.00
Lump Sum
Lump Sum
INR Lakhs

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

66.21

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

1.00

0.20

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00

12.90

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

2.00
2.00

4.83
5.24

6.45
2.41
2.62

1.00
1.00
1.00

6.45
2.41
2.62

4.83
5.24

1.00
1.00
1.00

2.00
2.00

12.90
4.83
5.24

4.83
5.24

2.00
2.00
2.00

2.00
2.00

12.90
4.83
5.24

4.83
5.24

2.00
2.00
2.00

2.00
2.00

12.90
4.83
5.24

4.83
5.24

2.00
2.00
2.00

2.00
2.00

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

2.00

3.51

1.00

1.76

1.00

1.76

1.364

341.00

1.516

379.00

1.668

417.00

1.38

345.00

1.15

288.00

1.08

269.00

1.74

436.00

1.72

430.00

2.76

690.00

1.97

493.00

1.08

269.00

1.15

288.00

1.00

250.00

1.97

493.00

1.81

453.00

1.00

250.00

1.15

288.00

2.816

704.00

1.00

250.00

1.00

250.00

0.15

38.00

0.15

38.00

0.08

19.00

0.23

57.00

0.08

19.00

0.15

38.00

44.50

53.40
87.94
166.20
20.23

44.50
90.00
27.70
1.00

53.40
87.94
166.20
20.23

48.60
106.00
27.70
1.00

58.32
103.57
166.20
20.23

40.10
76.50
26.59
1.00

48.12
74.75
159.54
20.23

34.00
61.00
22.00
1.00

40.80
59.60
132.00
20.23

30.60
51.85
22.00
1.00

36.72
50.66
132.00
20.23

51.18
108.00
32.50
1.00

61.42
105.53
195.00
20.23

72.00
143.00
37.50
1.00

86.40
139.73
225.00
20.23

121.50
238.50
60.70
1.00

145.80
233.04
364.20
20.23

61.40
140.40
37.86
1.00

73.68
137.19
227.16
20.23

30.60
55.00
26.59
1.00

36.72
53.74
159.54
20.23

30.60
55.00
24.30
1.00

36.72
53.74
145.80
20.23

30.60
51.85
24.29
1.00

36.72
50.66
145.74
20.23

86.00
200.00
36.90
1.00

103.20
195.42
221.40
20.23

56.14
115.00
27.70
1.00

67.37
112.37
166.20
20.23

34.00
61.00
22.00
1.00

40.80
59.60
132.00
20.23

34.00
61.00
24.29
1.00

40.80
59.60
145.74
20.23

121.50

90.00
27.70
1.00

238.50
50.80
1.00

145.80
233.04
304.80
20.23

25.59
54.00
21.44
1.00

30.71
52.76
128.66
20.23

19.19
40.50
16.08
1.00

23.03
39.57
96.50
20.23

4.00
8.00
1.50
-

4.80
7.82
9.00
-

2.50
5.00
1.50
-

3.00
4.89
9.00
-

2.00
4.00
0.40
-

2.40
3.91
2.40
-

4.50
9.00
2.70
-

5.40
8.79
16.20
-

2.50
8.00
1.70
-

3.00
7.82
10.20
-

4.00
8.00
1.70
-

4.80
7.82
10.20
-

12.00

4.02

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

12.00

4.02

1.00

0.34

1.00

0.34

1.00
1.00
1.00

75.00
55.00
175.00
1,070.69

84.75
55.00
210.00
1,153.44

1.27
1.00
1.20

95.25
55.00
210.00
1,222.49

1.13
1.00
0.87

84.75
55.00
152.25
1,036.56

1.13
1.00
1.20

84.75
55.00
210.00
987.30

1.00
1.00
1.10

75.00
55.00
192.50
928.03

1.13
1.00
1.20

84.75
55.00
210.00
1,264.84

1.47
1.00
1.50

110.25
55.00
262.50
1,426.02

2.00
1.00
2.00

150.00
55.00
350.00
2,105.19

1.25
1.00
1.20

93.75
55.00
210.00
1,406.92

1.07
1.00
1.20

80.25
55.00
210.00
981.40

1.06
1.00
1.20

79.50
55.00
210.00
985.91

1.00
1.00
1.20

75.00
55.00
210.00
940.27

1.93
1.00
1.20

144.75
55.00
210.00
1,539.92

1.33
1.00
1.20

99.75
55.00
210.00
1,280.83

1.00

75.00

1.20

1.00
1.00

55.00
175.00

1.00
1.20

0.07
-

54.89

27.71

12.00
1.13
1.00
1.20

904.55

90.00
55.00
210.00

1.40
1.00
2.00

1,006.29

105.00

1.00

75.00

1.00

75.00

55.00
350.00

0.66
1.00

36.30
175.00

0.66
1.00

36.30
175.00

2,014.79

848.65

795.62

5.25
64.87

0.13
-

9.75
97.14

0.10
-

7.50
-

0.15
-

47.52

11.25
72.07

Erection charges

b)
c)

Auxiliary Transformers,LT Switchgear, AC & DC Panels.72.5 kV


,33kV, & 11 kV equipments Etc
Station D.C Batteries 220 V, 500 AH
Station D.C Batteries 50 V, 500 AH

d)

Battery Charger System 220 V, 70A / 50 A Float cum Boost

a)

Quantity
2.00
70.00
65.55

33.07

2,052.00
1.00

66.21

d)

g)
h)
J
k)

1.00

2,900.00
2,120.00

466.91

e)

f)

Amount

2.00

Lump Sum
Sq mt

Electrical works
A.C.Supply
LT Switch Gear consisting of 415 V main switch board, ACDB,
MLDB, Emergency LDB, A/C DB, 220 V DCDB, 50V DCDB, 1
trasformer each of rating 630KVA, 11kV/440V and 800KVA,
33KV/440V,72.5KV Isolator, CT, PT, CB/Fuse 33KV and 11KV
Isolator, fuse, SA
Foundations for 1of 630KVA 33/0.415 kV and one of 800kVA
33/0.415kv LT transformer, BM Kiosk etc.

Unit

Lump Sum

e)

Battery Charger System 50 V, 70 A / 50 A Float cum Boost

f)

Sub-Station Automation including Hardware, software, Remote


Control Station, DMT Scheme along with associated equipment
and kiosks

Set

2.00

Set
Set

0.25
0.10

Set

0.20

Set

0.15

Set

7.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

1.00

2.00

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00
2.00

0.50
0.21

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.40

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

2.00

0.30

1.00

7.00

1.00

7.00

1.00

7.00

5
5-A

220 kV Bay s & Equipments


245 kV equipment

a)

Circuit Breaker 245 kV

1600 A, 40 kA

No.

14.35

9.00

129.19

9.00

129.19

9.00

129.19

7.00

100.48

7.00

100.48

7.00

100.48

9.00

129.19

9.00

129.19

7.00

100.48

7.00

100.48

6.00

86.13

9.00

129.19

10.00

143.54

7.00

100.48

7.00

100.48

8.00

114.83

ii
b)

2500 A, 40 kA
Current Transformer 245 kV
1600 A, 40 kA , 5 core, with 120% extended current

No.

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

1.00

14.65

81.74

27.00

81.74

27.00

81.74

21.00

63.57

21.00

63.57

21.00

63.57

27.00

81.74

36.00

108.99

45.00

136.23

27.00

81.74

21.00

63.57

21.00

63.57

18.00

54.49

27.00

81.74

30.00

90.82

21.00

63.57

21.00

63.57

24.00

72.66

3.03
3.25

27.00

3.00

1600 A, 40 kA, 5 core, with 150% extended current


CVT 245 kV

No.
No.

i
ii
c)

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

3.00

9.75

No.
No.

3.10
2.74

6.00
18.00

18.60
49.29

6.00
18.00

18.60
49.29

6.00
18.00

18.60
49.29

6.00
12.00

18.60
32.86

6.00
12.00

18.60
32.86

6.00
12.00

18.60
32.86

6.00
18.00

18.60
49.29

6.00
30.00

18.60
82.15

6.00
36.00

18.60
98.58

6.00
18.00

18.60
49.29

6.00
12.00

18.60
32.86

6.00
12.00

18.60
32.86

6.00
12.00

18.60
32.86

6.00
18.00

18.60
49.29

6.00
18.00

18.60
49.29

6.00
12.00

18.60
32.86

6.00
12.00

18.60
32.86

6.00
15.00

18.60
41.07

3.00

i
ii
d)

8800 pf, S- Ph, with 3 secondaries


4400 pf, S- Ph with 3 secondaries
Isolator 245 kV

i
ii

1600A, 40 kA, DB Type with two E/S


1600A, 40 kA, DB Type with one E/S

iii
iv
v

1600A, 40 kA, DB, Tandem Type without E/S


2500A, 40 KA, DB Type with Two E/S
1600A, 40kA with one E/S, S-phase

vi
e)

1600A, 40 kA without E/S, S phase


216 kV Surge Arrestors
Sub Total - 5-A

5-B
a)
b)
c)
d)

a)
b)
c)
d)
e)
f)
g)

a)
b)
c)
d)

Tower Type 2C1 - Number * Unit Weight


Tower Type 2C2 - Number * Unit Weight
Tower Type 2C3 - Number * Unit Weight
Beam Type 2B1 - Number * Unit Weight
Bea Type 2B2 - Number * Unit Weight
Beam Type 2B3 - Number * Unit Weight
Equipment Support Structure - Number * Unit Weight

a)
b)
c)
d)
e)
f)
g)
h)
i)
j)
k)
l)
m)
n)

CVT - Number * Unit Weight


BPI - Number * Unit Weight
Isolators - Number * Unit Weight
SA - Number * Unit Weight

a)

i
ii

1.00

14.35
-

1.00

14.35

3.00

9.08

8.21

9.08

3.76
3.17

9.00
9.00

33.81
28.54

9.00
9.00

33.81
28.54

9.00
9.00

33.81
28.54

7.00
7.00

26.30
22.20

7.00
7.00

26.30
22.20

7.00
7.00

26.30
22.20

9.00
9.00

33.81
28.54

12.00
11.00

45.08
34.89

15.00
13.00

56.35
41.23

9.00
9.00

33.81
28.54

7.00
7.00

26.30
22.20

7.00
7.00

26.30
22.20

6.00
6.00

22.54
19.03

9.00
9.00

33.81
28.54

10.00
10.00

37.57
31.72

7.00
7.00

26.30
22.20

7.00
7.00

26.30
22.20

8.00
8.00

30.05
25.37

1.00
1.00

3.76
3.17

1.00
1.00

3.76
3.17

No.
No.

2.81
3.94

No.

1.42
0.96
0.61

17.00
2.00
-

47.84
7.87
-

17.00
2.00
-

47.84
7.87
-

17.00
2.00
-

47.84
7.87
-

13.00
2.00
-

36.59
7.87
-

13.00
2.00
-

36.59
7.87
-

13.00
2.00
-

36.59
7.87
-

17.00
2.00
-

47.84
7.87
-

23.00
2.00
8.00

64.73
7.87
11.35

29.00
2.00
14.00

81.62
7.87
19.87

17.00
2.00
-

47.84
7.87
-

13.00
2.00
-

36.59
7.87
-

13.00
2.00
-

36.59
7.87
-

11.00
2.00
-

30.96
7.87
-

17.00
2.00
-

47.84
7.87
-

19.00
2.00
-

53.47
7.87
-

13.00
2.00
-

36.59
7.87
-

13.00
2.00
-

36.59
7.87
-

15.00
2.00
-

42.22
7.87
-

2.00
-

5.63
-

2.00
-

5.63
-

12.85

3.00

1.84

3.00

1.84

No.
INR Lakhs

24.00
333.00

14.69

24.00

435.97

14.69

24.00

435.97

14.69

18.00

435.97

11.02

18.00

343.88

11.02

18.00

343.88

11.02

24.00

343.88

14.69

34.00

435.97

20.81

49.00

591.11

29.99

24.00

730.05

14.69

18.00

435.97

11.02

18.00

343.88

11.02

15.00

343.88

9.18

24.00

306.05

14.69

27.00

435.97

16.52

18.00

473.80

11.02

18.00

343.88

11.02

21.00

343.88

389.93

46.04

37.83

No.
No.
No.
No.
INR Lakhs

8.02
6.45
18.18
63.46

MT
MT
MT

0.60
0.60
0.60

MT
MT
MT
MT
INR Lakhs

0.60
0.60
0.60
0.60

MT
MT
MT
MT
INR Lakhs

0.80
0.80
0.80
0.80

6.00
4.00
6.00
1.00

48.14
25.81
109.09
63.46

6.00
4.00
6.00
1.00

246.50

48.14
25.81
109.09
63.46

6.00
4.00
6.00
1.00

246.50

48.14
25.81
109.09
63.46

4.00
4.00
4.00
1.00

246.50

32.09
25.81
72.73
63.46

4.00
4.00
4.00
1.00

194.09

32.09
25.81
72.73
63.46

4.00
4.00
4.00
1.00

194.09

32.09
25.81
72.73
63.46

6.00
4.00
6.00
1.00

194.09

48.14
25.81
109.09
63.46

10.00
3.00
10.00
1.00

246.50

80.23
19.36
181.82
63.46

10.00
4.00
10.00
1.00

344.87

80.23
25.81
181.82
63.46

6.00
4.00
6.00
1.00

351.32

48.14
25.81
109.09
63.46

4.00
4.00
4.00
1.00

246.50

32.09
25.81
72.73
63.46

4.00
4.00
4.00
1.00

194.09

32.09
25.81
72.73
63.46

4.00
3.00
4.00
1.00

194.09

32.09
19.36
72.73
63.46

6.00
4.00
6.00
1.00

187.64

48.14
25.81
109.09
63.46

6.00
5.00
6.00
1.00

246.50

48.14
32.26
109.09
63.46

4.00
4.00
4.00
1.00

252.95

32.09
25.81
72.73
63.46

4.00
4.00
4.00
1.00

194.09

32.09
25.81
72.73
63.46

5.00
4.00
5.00
1.00

194.09

40.11
25.81
90.91
63.46

220.29

1.00
1.00
-

8.02
18.18
-

1.00
-

26.21

6.45
-

6.45

67.50

40.50

67.50

40.50

67.50

40.50

54.00

32.40

54.00

32.40

54.00

32.40

67.50

40.50

121.50

72.90

121.50

72.90

67.50

40.50

54.00

32.40

54.00

32.40

54.00

32.40

67.50

40.50

67.50

40.50

54.00

32.40

54.00

32.40

67.50

40.50

72.00
14.00
30.00
42.50
-

43.20
8.40
18.00
25.50
-

72.00
14.00
30.00
42.50
-

43.20
8.40
18.00
25.50
-

72.00
14.00
30.00
42.50
-

43.20
8.40
18.00
25.50
-

60.00
10.50
24.00
32.50
-

36.00
6.30
14.40
19.50
-

60.00
10.50
24.00
37.50
-

36.00
6.30
14.40
22.50
-

60.00
10.50
24.00
37.50
-

36.00
6.30
14.40
22.50
-

72.00
14.00
30.00
59.50
-

43.20
8.40
18.00
35.70
-

48.00
56.00
48.00
27.50
-

28.80
33.60
28.80
16.50
-

48.00
63.00
48.00
32.50
-

28.80
37.80
28.80
19.50
-

72.00
14.00
30.00
42.50
-

43.20
8.40
18.00
25.50
-

60.00
10.50
24.00
32.50
-

36.00
6.30
14.40
19.50
-

60.00
10.50
24.00
32.50
-

36.00
6.30
14.40
19.50
-

60.00
10.50
24.00
32.50
-

36.00
6.30
14.40
19.50
-

72.00
14.00
30.00
42.50
-

43.20
8.40
18.00
25.50
-

68.00
14.00
30.00
42.50
-

40.80
8.40
18.00
25.50
-

60.00
10.50
24.00
37.50
-

36.00
6.30
14.40
22.50
-

60.00
10.50
24.00
37.50
-

36.00
6.30
14.40
22.50
-

72.00
10.50
30.00
47.50
-

43.20
6.30
18.00
28.50
-

8.00
2.50
-

19.80

33.00

19.80

33.00

19.80

24.00

14.40

24.00

14.40

24.00

14.40

33.00

19.80

49.50

29.70

51.00

30.60

27.00

16.20

24.00

14.40

24.00

14.40

22.50

13.50

33.00

19.80

34.50

20.70

24.00

14.40

24.00

14.40

31.50

18.90

4.50

33.00

155.40

155.40

155.40

123.00

126.00

126.00

165.60

210.30

218.40

151.80

123.00

123.00

122.10

155.40

153.90

126.00

126.00

155.40

4.80
1.50
-

6.00
14.00
5.00
-

2.70

1.50

9.00

3.60
8.40
3.00
-

0.90

15.90

12.00
34.00
55.50
12.00

9.60
27.20
44.40

12.00
34.00
55.50

9.60

12.00

90.80

9.60
27.20
44.40

12.00
34.00
55.50

9.60

12.00

90.80

9.60
27.20
44.40

9.00
24.00
27.00

9.60

9.00

90.80

7.20
19.20
27.00

9.00
24.00
27.00

7.20

9.00

60.60

7.20
24.00
21.60

9.00
22.50
43.50

7.20

9.00

60.00

7.20
18.00
34.80

12.00
34.00
55.50

7.20

12.00

67.20

9.60
27.20
44.40

18.00
42.00
84.00

9.60

18.00

90.80

14.40
33.60
67.20

16.50
45.00
97.50

14.40

18.00

129.60

13.20
36.00
78.00

12.00
34.00
55.50

14.40

12.00

141.60

9.60
27.20
44.40

9.00
24.00
27.00

9.60

9.00

90.80

7.20
19.20
21.60

9.00
24.00
27.00

7.20

9.00

55.20

7.20
19.20
21.60

9.00
21.00
23.00

7.20

7.50

55.20

7.20
16.80
18.40

12.00
34.00
55.50

6.00

12.00

48.40

9.60
27.20
44.40

12.00
30.00
61.50

9.60

13.50

90.80

9.60
24.00
49.20

9.00
24.00
27.00

10.80

9.00

93.60

7.20
19.20
21.60

9.00
24.00
43.50

7.20

9.00

55.20

7.20
19.20
34.80

10.50
27.00
49.50

7.20

10.50

68.40

8.40
21.60
39.60

8.40

78.00

1.50
3.50
6.00

1.50

1.20
2.80
4.80

3.50
6.00

1.20

1.50

10.00

2.80
4.80

1.20

8.80

Bus Bar & Hard ware materials f or 220 kV


Quad Disc Iinsulator string with Tension Hardware for Quad
Moose (220KV Main Bus)
Twin Disc Iinsulator string with Suspension Hardware for Quad
Moose(220KV Main Bus)
Twin Disc Iinsulator string with Tension Hardware for Twin
Moose (220KV Transfer Bus and Jack Bus)
Twin Disc Iinsulator string with Suspension Hardware for Twin
Moose(220KV Transfer and Jack Bus)
220KV Bus post I nsulators
4" EH-IPS Alluminium Tube(OD- 114.2, ID-97.18)
Moose ACSR
Tee Clamps Quad Moose to Twin Moose
Tee Clamps Twin Moose to Twin Moose - 220kv side
Tee Clamps Twin Moose to 4' IPS Al Tube - 220kv side
Spacer Clamps for Quad Moose ACSR
Spacer Clamps for Twin Moose ACSR
PG Clamps
Ground wire with Accessories
Sub Total - 5-E

5-F

215.31

220 KVTubular ty pe (Pipe) Equipment support /


mounting Structures

Sub Total - 5-D

5-E

15.00

220 kV Towers, Beams & Support structures

Sub Total - 5-C

5-D

172.25

220 kV Simplex ty pe Panels


Circuit breaker relay panel With Auto reclosure
Circuit breaker relay panel Without Auto reclosure
Line protection panel
Single Bus Bar protection panel
Sub Total - 5-B

5-C

12.00

No.
No.
No.

Set
Set
Set
Set
No.
Metre
Metre
No.
No.
No.
No.
No.
No.
Lump Sum
INR Lakhs

270.00

270.00

270.00

180.00

180.00

180.00

270.00

585.00

630.00

270.00

180.00

180.00

180.00

270.00

270.00

180.00

180.00

225.00

45.00

45.00

Foundations f or 220 kV Towers & Equipment


mounting structures
Towers
Towers Type 2C1
Towers Type 2C2

No.

2.50

No.

2.50

15.00
18.00

37.50
45.00

15.00
18.00

37.50
45.00

15.00
18.00

37.50
45.00

12.00
15.00

30.00
37.50

12.00
15.00

30.00
37.50

12.00
15.00

30.00
37.50

15.00
18.00

37.50
45.00

27.00
12.00

67.50
30.00

27.00
12.00

67.50
30.00

15.00
18.00

37.50
45.00

12.00
15.00

30.00
37.50

12.00
15.00

30.00
37.50

12.00
15.0

30.00

15.00

37.50

15.00

37.50

12.00

30.00

12.00

30.00

15.00

37.50