Beruflich Dokumente
Kultur Dokumente
Bicarbonate (HCO2)
Nitrate (NO2)
Bisulfate (HSO4)
Carbonate (CO2)
Silicate (SiO3)
Sulfate (SO4)
H2O
CATION ANION
Figure 2. Overview of deionization process.
The raw water enters the top of the first column and flows down through the resin. The cationic part of the dissolved
minerals in the raw water is exchanged for hydrogen (H)
+
as the water passes through the cation resin. The water then
flows out the bottom of the first column and into the top of the second column and flows down through the anion resin.
The anionic part of the dissolved minerals is exchanged for Hydroxide (OH)
operating systems. In order to connect the controller to a computer you will need a
USB-to-GBE cable, Culligan P/N 01021507. You will also need to download a installation file from the myCulligan Web
site on the GBE downloads page. The file is called Setup_Culligan_GBE.EXE. Once you copy the file to your PC, you
can double-click on the file to install the USB drivers and the Data Port Output Viewer to your local hard drive. You will be
asked which directory you want to copy these files to. You may select any directory.
The instructions for using the program are included with the download. The program is a simple viewer window that
shows the decoded messages sent to the debug port. See figure below.
86 Culligan Premier Series Automatic Deionizer 86 Cat. No. 01024000
*** MINI REPORT ***
AUX:00000
AUX:00000
AUX:00000
AUX:00000
CULL,000005.1,000000.0,0021094,0000000,0021094,0000000,0,2,0104101618
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
CULL,000005.1,000000.0,0021099,0000000,0021099,0000000,0,2,0104101619
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
AUX:00000
Figure 39. Mini Report from data port.
Index 87 Cat. No. 01024000
Index
A
Accessories, Adding and Program-
ming 31
Acid Draw 57
Adding and Programming Acces-
sories 31
Anion Backwash 61
Anion Rinse 63
Assembling the Deionizer 12
Assembly, Series Q Automatic
Deionizer 68
Auxiliary Input 2
Auxiliary Output 2
B
Backwash Anion 61
Backwash Cation 56
Basic Menu Operation 26
Basic Principles 4
C
Cable Routing 17
Calibration 40
Cation Backwash 56
Cation Rinse 58
Caustic Draw 62
Caustic Soda 50-Gallon Drum
Heaters 41
Check Inputs 49
CHECK MARK button 26
Chemical Usage Conversion Chart
81
Components of a Two-Bed Deion-
izer 11
Conductivity 7
Conductivity Meter 39
Connecting an External Flow
Meter 38
Control Panel 72
Cycle Times 43
Cycle Times Settings 43, 44
D
Date and Time Settings 30
Deionization Process 4
Deionizer Circuit Board Layout 22
Deionizer, Components of a Two-
Bed 11
Deionizer Controller Programming
25
Deionizer Information 45
Deionizer Performance Character-
istics 5
Deionizer Schematics 22
Deionizer Specifcations 8
Deionizer Typical Installation 16
Deionizer Wiring 23
Diagnostics 3
Diaphragm Valve 69
Double Regenerating the Cation
Resin 52
DOWN ARROW button 26
Duplex Deionizer System 75
E
Electrical Installation 17, 22, 23
Error Mode 21
Errors and Alert Codes 47
External Flow Meter 33
F
Fast Rinse Anion 65
Fast Rinse Cation 60
Features, Series Q Automatic
Deionizer 2
First Time Setup 28
Flow Device K-Factor Data 83
Flow Meter/Sensor Input 3
Flow Sensor Meter Connections
31
Front Panel 39
G
GBE Circuit Board Layout 22, 23
I
Input 85
Installation 10
Installation, Deionizer Typical 16
Installation, Recirculation Pump
Setup and 84
Installing a Modem 35
Installing the GBE Board 35
Introduction 87
K
Keypad 2
Keypad connector 22
Keypad Lockout 25
K Factor 33
K-Factor Data 83
L
Locating the Equipment 12
lock the keypad 25
M
main menu 26
Manual Control 48
Manual Regeneration 46
Meaning of pH 6
Measurement of Inches 82
Membrane Keypad 2
Menu Lockout 25
Menus and Keypad 26
Modem Setup Settings 37
multifunction keypad 2
Multiple Unit 2
Multiple Unit Communication 2
N
Navigating the Menus and Keypad
26
O
OLED Display 2, 22
Operating Checklist 50
Operating Parameters 10
Operation 20
Optional Premier Series Automatic
Deionizer Features 3
Output 85
P
pin connections 85
Pneumatic Diaphragm Valve Loca-
tions 14
Pneumatic Tubing Diagram 15
Possible Results 38
Power Source 2
Pre-Cation Fast Rinse 59
Pre-Fast Rinse Anion 64
Pre-Fast Rinse cation 59
Pre-Fast Rinse Cation 59
Preinstallation Data 10
Premier Auto DI Menu Overview
73
Premier Series Automatic Deion-
izer Assembly 68
Premier Series Automatic Deion-
izer Parts 68
Preventive Maintenance 52
Probe Maintenance 40
88 Culligan Premier Series Automatic Deionizer 88 Cat. No. 01024000
Program Data Input 25
Programming the Modem 36
Q
Quality of Water 7
Quality Purge Mode 20
Quantity of regenerants pro-
grammed 82
R
Real Time Clock 2
Rear Panel 39
Recirculation Pump 84
Recirculation Pump Setup and
Installation 84
Recirculation Pump System 41
Regenerants 82
Regenerant Specifcations for
Hydrochloric (Muriatic) Acid
79, 80
Regenerant Specifcations for
Sodium Hydroxide (Caustic)
80
Regeneration 5, 42
Regeneration Chemical Require-
ments 67
Regeneration Cycles 55
Regeneration Interval 2
Regeneration Mode 21
Regeneration Time Cycles 67
Re-Run First Time Setup 29
Reset Date and Time 30
resin and gravel quantities 13
Resin Types and Uses 5
Resistivity 7
RoHS Compliant 3
S
Service 55
Service and Maintenance 45
Service Mode 20
Set-Point Adjustment 40
Single Water Softener 85
Skid Mounting and Assembly 41
Slow Rinse Anion 63
Slow Rinse Cation 58
Solenoid Valve Sequence Chart
15
status message 85
Strong Base Systems 8
T
Telephone Modem 3
Testing Hardness of Decationized
Water 52
Testing the Meter Operation 40
Test Modem 37
Test the Data Port 85
Time of Day 2
Troubleshooting 51
U
unlock the keypad 25
UP ARROW button 26
V
Vacuum Protection 41
Valve Sequence Chart 14