Sie sind auf Seite 1von 2

Estd:1985

0 1 0

1 0 0 0 1 1 0 1 0 1 1 1 1 0 0 1 1 1 0 1 0 1 1 0 0 1 0

To provide insight for enhancing wealth

SOLID STATE BLOCK PROVING BY AXLE COUNTER (DIGITAL)

RDSO Specification: R D S O / S P N / 1 7 5 / 2 0 0 5
Solid State Block Proving by Digital Axle Counter (SSBPAC) is a solid state system used for controlling the coordinated movement of the train in the block section, working on Absolute Block Working Principles. The system has been developed as per RDSO / SPN / 175 / 2005 both for single line and double line.

Cable (2 pairs) / OFC (2Channels) Data Communication & Block Telephone

LSS Control

LSS Control

Control Panel Field Inputs Field Inputs

Control Panel

SALIENT FEATURES
Works on both single line and double line. Cooperation from other end is eliminated for taking Line Clear. Fully solid state and relays are only for vital outputs. Cooperative cancellation. Automatic Train On Line and Automatic Line Closed. Supports Block Back & Block Forward Operations. Line Clear Block Key (LCB Key) is provided to prevent automatic granting of Line Clear in case of shunting. Station Master Key (SM Key) to prevent unauthorized panel operations. Each event is logged in the system and can be used for analysis purpose. Compatible with data-logger network, data can be transmitted to central locations. Works on OFC as well as Copper cable. Block bell and telephone on separate pair of quad or OFC Audio warning on occupation and clearance of Block section. LCD maintainer interface for knowing the status of each input, faults occurred, Time setting etc.

Station - A

Station - B
IBC

BLOCK PANEL

BUTTONS
BELL TGT CANCEL ACKN (D) * ACKN (R) CANCEL Co-op KEYS SM KEY LCB KEY +

INDICATION
TRAIN GOING TO TRAIN COMING FROM LINE CLOSED(D) * LINE CLOSED(R) CANCEL (R) LINE FREE/OCC.(D) * LINE FREE/OCC.(R) ACKN (D) * ACKN (R) SNK (D) SNK (R) * SNOEK SSBPAC Health Communication Status Shunt Key IN # Shunt Key OUT #

FIELD INPUTS
DISPATCH
ASGNCR AZTR(D)

BLOCK TELEPHONE COUNTERS


RESET COUNT CANCEL COUNT

VITAL O/Ps RECEPTION


HSGNCR AZTR(R) * HSATPR HSBTPR SHKR # ASCR TCFR TGTR REP1 REP2 EKT #

S S B P A C
LCD User Interface PC Interface

Block Telephone

S S B P A C

Data Logger N/W

Printer Interface

* Not necessary for Single Line

For Single Line only

+ LCB key acts as shunt key release in Single Line

A PRODUCT DEVELOPMENT COMPANY

1 0 0 0 1 1 0 1 0 1 1 1 1 0 0 1 1 1 0 1 0 1 1 0 0 1 1 0 0 1 1 1 0

0 1 0

SOLID STATE BLOCK PROVING BY AXLE COUNTER (DIGITAL)


ADVANTAGES
Less Maintenance and No periodical over hauling. Consideration of Overlap distance for granting Line Clear, which is not available in some of present systems.

To provide insight for enhancing wealth

Inbuilt data logging capability which logs all the Panel operations, events, relays status and other information. Data logger network portability makes it possible to view online and analyze the data at central location. All the panel indications are with LEDs. Auto TOL and Line Close relieves manual operation. No need for next train on PLC after push back operation.

SSBPAC ARCHITECTURE
INPUT MODULE INPUT A PROCESSOR MODULE CPU A VOTER MODULE OUTPUT MODULE
NON VITAL OUTPUT MODULE READ BACKS FOR 3CPUS FOR INDICATIONS

INPUTS FIELD INPUTS


INPUTS FROM RELAY RACK

INPUT B

CPU B

CRITICAL POWER SUPPLY MODULE

VITAL OUTPUT MODULE

FOR OUTPUT RELAYS

SECOND LEVEL READ BACKS FOR CPUS

INPUTS FROM THE PANEL

INPUT C

CPU C

COMMUNICATION MODULE

FIRST LEVEL READ BACKS FOR 3CPUS

OUTPUT READ BACKS

TO PC

OTHER END SSBPAC DATA

TO PRINTER

USER INTERFACE

DATA LOGGER INTERFACE

OTHER END SSBPAC

FIELD PERFORMANCE

SSBPAC (D) Single line systems are installed between Kovvur (KVR) and Godavari (GDV) block section & Double line systems are installed between Bhimadolu (BMD) and Pulla (PUA) block section both in Vijayawada - Howrah route. The systems are operated between 6:00 hrs to 22:00 hrs. in parallel to the existing block instruments. The Single Line field trial between Kovvur and Godavari is commenced from June 16th 2006, operations done till July 2009 are given below. The Double Line field trial between Bhimadolu and Pulla is commenced from 25th Jan 2006, operations done till July 2009 are given below.

No. of operations from No. of operations from Total

GDV KVR KVR GDV

10,918 33,850 44,768

No. of operations from No. of operations from Total

BMD PUA PUA BMD

28,956 26,836 55,792

R & D
An ISO 9001:2000 Company Recognised by DSIR Govt. of INDIA

Approved by

EFFTRONICS SYSTEMS PVT. LTD.


SMERating Agency of India Ltd.

RDSO
Govt. of INDIA Ministry of Railways

40-15-9, Brundavan Colony, Vijayawada-520 010, A.P., INDIA : +91(866) 2466675, 2493375 Fax: +91(866)2474097 E-mail: info@efftronics.com Visit us: www.efftronics.com

Das könnte Ihnen auch gefallen