Using the Switch Document for Change of Supplier Process (Utility Industry)

Applies to:
When there is a Change of Supplier process in Utility Industry. For more information, visit the Utilities homepage.

Summary
Whenever there is a change of supplier process in a deregulated energy market, we need to consolidate all the data related to a switch process in one place and this is where there is a need for a Switch Document. This Article will help you in understanding the Switch Document and how it will be helpful. Author: Manish Bisht

Company: Wipro Technologies Created on: 09 September 2009

Author Bio
Manish Bisht has been associated with Wipro Technologies since November 2006. He is currently working as a SAP-ISU Technical Consultant.

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 1

Using the Switch Document for Change of Supplier Process (Utility Industry)

Table of Contents
Introduction ......................................................................................................................................................... 3 What is Switch Document? ................................................................................................................................. 3 Switch Types ................................................................................................................................................... 3 Switch Views ................................................................................................................................................... 3 Switch Status .................................................................................................................................................. 3 Owner .............................................................................................................................................................. 3 Start Scenario ................................................................................................................................................. 4 Target Scenario............................................................................................................................................... 4 Why Switch Document?...................................................................................................................................... 4 Monitoring Switch Document .............................................................................................................................. 5 Prerequisite ..................................................................................................................................................... 5 Related Content ................................................................................................................................................ 10 Disclaimer and Liability Notice .......................................................................................................................... 11

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 2

Using the Switch Document for Change of Supplier Process (Utility Industry)

Introduction
Deregulation of market has given consumers the freedom to choose their energy suppliers and to change the supplier if they are not satisfied with the services of the supplier, leaving challenges to the suppliers to have accurate and up-to-date data of switch history of the consumers. As change of supplier process demands a lot of data to be shared between retailers or between retailer and distributor, Intercompany Data Exchange (IDE) are used which automates transactions between market players in a deregulated market. The situation becomes bad to worse when lots of data is exchanged and keeping a track on the data flow becomes a tedious job.

What is Switch Document?


Switch document is the object used to control and document the change of supplier process (E.g. Start of Supply, End of Supply, Change of Supplier etc). When a change of supplier process starts, related Switch Document is created which is used to record all the related activities related to that process. The change of supplier is executed with reference to the point of delivery. We record change of supplier processes on POD basis therefore for a single point of delivery there will be just one Switch Document, for a switch type in active status. Switch Document also act as a unique identifier for the process. Hence we can attach the corresponding workflow with the Switch Document. Switch Types Switch Types identifies the process for which the Switch Document has been created. The following switch types are predefined by SAP in the standard solution: Start of supply A customer starts to purchase electricity for a supply location (after moving in, for example). End of supply A customer stops purchasing electricity from the supplier for a service location (after moving out, for example), or the supplier stops supplying electricity to the customer (after receiving a cancellation notification from a new supplier, for example). Change of Supplier This is when the supplier of energy to a service location changes from a former supplier to a new supplier.

Switch Views A switch view is the view from which the change of supplier process is considered. Switch documents are always created with reference to a switch view. The following switch views are predefined by SAP in the standard solution: Distributor view - 01 Supplier view new supplier - 02 Supplier view former supplier - 03

Switch Status Switch status describes the current status of the Switch Document. When the Change of Supplier Process is in progress, switch Document status is set to Active (03). And when the Process completes, Switch Document status is set to Complete. Following are the statuses of the Switch Document. Owner Owner describes the owner of the process. It contains the name of the Service Provider who has started the process. If the Process has been started by the New Service provider, then the field will contain the name of the New Service Provider.

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 3

Using the Switch Document for Change of Supplier Process (Utility Industry)

Start Scenario There are many supply scenarios in the deregulated energy market. For example, grid usage and supply services can be performed by a service provider operating in the system or a consumer can choose a different supplier (third party service provider) this changes its supply situation. Start Scenario describes the Supply Scenario at the point of delivery at the start of the process. Target Scenario Target Scenario describes the Supply Scenario at the point of delivery at the end of the process.

Why Switch Document?


The change of supplier process involves a high level of administrative effort. You can keep the resulting costs to a minimum by automating as much of the process as possible. This particularly applies to the automatic processing of data exchange (IDocs), which is used to share data between distributor and retailers. IDocs can be monitored from WE02 transaction. But to know all the IDocs related to a particular Change of Supplier Process, those IDocs should be consolidated at one place. Therefore; there is a need for a central document which will carry the complete information related to a Supplier Switch Process. Switch Document is a central object for data related to a switch process. For example POD for which the change of supplier process has started, Move In Date, Move Out date, Former Supplier, New Supplier etc Switch Document is mainly used to monitor the activities related to a process. It helps to keep a track on the progress of the process. The activities could be the response from a retailer or the step that has completed for the process. For example Examples of activities include: Switch notification received Notification processed Check switch permission

Switch Document acts as a linkage to all the IDocs received or generated for a switch process. We can attach the IDoc related to an activity in Switch Document and can navigate to the IDoc. In this way, we can know the complete data that has entered the system or has gone out from the system for a switch process. Switch Document is linked with the related Workflow, so you can keep a track on the progress of the process (which all steps has been completed for the process). The change of supplier process (as an intercompany process) can be viewed from three different switch views. These are the New Supplier, the Former Supplier or the Distributor views. Switch Document can be enhanced to consolidate project-specific fields in it.

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 4

Using the Switch Document for Change of Supplier Process (Utility Industry)

Monitoring Switch Document


Prerequisite New Retailer has sent an Enroll request to the Distributor for a POD. Enroll Request IDoc has created a Switch Document for that process.

Go to ESWTMON01, enter the Switch Document Number and press execute (F8)

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 5

Using the Switch Document for Change of Supplier Process (Utility Industry)

Click on the Document Number and you will find the complete data for a Switch Document. For example the below Switch Document is created for Switch Type 02 (Customer is Enrolling to a new retailer) and all the related activities are captured in activity tab.

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 6

Using the Switch Document for Change of Supplier Process (Utility Industry)

Click on the Value/ID field and you can navigate to the related IDoc.

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 7

Using the Switch Document for Change of Supplier Process (Utility Industry)

To navigate to corresponding Workflow,

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 8

Using the Switch Document for Change of Supplier Process (Utility Industry)

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 9

Using the Switch Document for Change of Supplier Process (Utility Industry)

Related Content
http://help.sap.com/saphelp_utilities472/helpdata/en/5e/8e18f08ee44e12afb1e0dfb88c9854/frameset.htm http://help.sap.com/erp2005_ehp_04/helpdata/EN/37/5e82abe9994c82989ead2dd422bdd6/frameset.htm http://help.sap.com/saphelp_utilities472/helpdata/en/8d/d96793ee2d424f9c315b223ec1eebf/frameset.htm http://help.sap.com/saphelp_nw04s/helpdata/en/0e/6304acd4ad4651ad647b2e020594f8/content.htm For more information, visit the Utilities homepage.

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 10

Using the Switch Document for Change of Supplier Process (Utility Industry)

Disclaimer and Liability Notice


This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is not supported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade. SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document, and anyone using these methods does so at his/her own risk. SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article or code sample, including any liability resulting from incompatibility between the content within this document and the materials and services offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of this document.

SAP COMMUNITY NETWORK 2009 SAP AG

SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com 11

Das könnte Ihnen auch gefallen