An astute professional with over 20 years of rich and enormous experience in the field of Construction of large LNG/ GTL/Petrochemical/Process Plant, Steel Plant, Cross-Country Pipeline in Oil & Gas Sectors, Underground Concrete Tunnel for Metro Railway, Bridge, Cement Plant, Highrise Building; Strong organizational experience in ensuring proper implementation of Quality Control Plan on Civil Construction activities; Monitor progress of the project at all stages; Multitasking ability to sketch the plan, prioritize the work and manage the complex projects under aggressive timelines; Tendency to thrive in dynamic and fluid environments while remaining pragmatic and focused; Highly ethical, trustworthy and discreet.

Background includes high level over sight of management in create a Safe, Incident & Injury-Free and Quality Work Environment to accomplish a successful Global Project. Possessing valuable insights, keen analysis and team approach to implement best practices to achieve business excellence. Adept at working in high pressure environments with strict deadlines and multiple deliverables. Well versed with efficiently handling all activities involving Team Building, planning & development and co-ordination with internal Departments. Superior communications & interpersonal skills, with an ability to interact with wide range of people.

Core Competencies

Visionary Leadership Construction Liaising

Detail Oriented Strategic Planning

Proactive and industrious Project Management & Execution Quality Assurance

Executive Highlights
Successfully handled several projects from inception to completion. Sound ability to develop strategies to achieve individual goals as well as organizational goals. Excellent decision making skills with a positive approach. Received accolades from my superiors for my effort & hard work shown in meeting the project dead lines. Interfaced and corresponded on a daily basis with top clients and Sub Contractors on various outstanding issues. Monitored progress of the project and evaluated compliance with set standards. Efficiently completed the projects on schedule and budget. Exceptional knowledge in analytical and creative problem solving.

Professional Experience
1] TEBODIN Middle East Limited, Abu Dhabi, U.A.E. (Nov08 Present)

(A part of CONSULTANTS & ENGINEERS Group of original organization TECHNISH BUREAU VOOR ONTWIKKELING DER INDUSTRIE M/s TEBODIN B.V., Netherlands) Civil Construction Superintendent Key Deliverables:

Liaising with the team to achieve company goals within the time constraint.

Developing specific goals to plan, organize and prioritize the work. Working as a PMC with the Client M/s. GASCO, Abu Dhabi of the professional team of the
Project.

Controling construction & maintaining daily supervisory surveillance checks on the new
facilities and modifications. Monitoring of contractors/subcontractors construction activities in: Brownfield Area (Existing Sulphur Handling Terminal) Construction of foundations for new Sulphur Storage Tank, Conveyor foundations, Condensate Recovery Systems, new Granulator foundations, Air Cooler/Filter, liquid sulphur unloading trench, underground pipeline trench for fire water pipeline & other services, electrical & instrumentation cable trench, duct banks, asphalt/concrete paving and fence installation.

Greenfield Area Construction of new Sulphur Storage large Building with associated civil

structures, Maintenance Building, Electrical Sub-Station Building, FW Pump House, FW Tank foundation, underground trench, cable trench, asphalt road, underground drainage concrete structures, new fence installation.

Marine Offshore Jetty(Port) Construction for loading/unloading of granulated sulphur


Construction of Reclaim Land, Onshore/Offshore Piling/Pile Cap, New Shiploader Pivot Foundation, Temporary Jetty, Shore/Scour Protection, Quadrant Beam & Support Trestle FOUNDATIONs, Breasting Dolphin/Mooring Dolphin/Catwalks Gangway/Access Walkway for Vessel/Berth. CORE RESPONSIBILITIES AS PMC PROFESSIONAL TEAM Promoting a total quality work ethic, safe & pleasant work environment and establishing an environment of mutual respect & teamwork among all concerned employees. Responsible for and participation in given dedicated tasks by the Construction Manager. Reviewing contractors technical submittals (MAR, METHOD STATEMENTs, ITP) related to discipline prior to start any relevant activity and ensuring compliance with project contract requirements. Ensuring Inspection & Test Plans and other Quality Verification Forms address all necessary informations outlined in the Project Specifications or in the Manufacturers Brochure. Promoting safety as a value and ensuring all work activities in the area of site construction meet the Clients HSE policy and objectives. Liaisoning with PMC / EPCM Engineering Team to ensure deliverables meet construction need. Coordinating with Contractors/Sub-Contractors' Construction Managers / Site Engineers / QC Personnels and concerned Production Supervisors for maintaining the quality of day to day executed works to meet the requirements of Project Specifications, Drawings, QCPs, ITPs, Method Statements within project schedules. Ensuring quality of work is in compliance with project contract requirements, best industrial construction practice is in effect, only approved materials are used and compliance with approved drawings & specifications. Use to report any deviation to Construction Manager. Participating in weekly Construction & Progress Meeting by Construction Manager to maintain an overview of progress and ensure full coordination between all disciplines. Issuing comprehensive and concise reports & information to senior management to enable optimized decision making.

Handling several activities of the project & ensuring compliance; Accomplishing project is furnished
below:-

Project - Ruwais Sulphur Expansion (Phase III) Project - Ruwais, Abu Dhabi,
United Arab Emirates 2] JGC Corporation and KELLOGG BROWN & ROOT JV, Ras Laffan Industrial City, Qatar (Mar08 Oct08) Quality Control Civil Inspector Key Deliverables:

Accountable for supervising Subcontractors civil activities for construction of Heavy Equipment

foundations for VESSEL, HPS Reactor, Pump, Exchanger, BOG Compressor, Erection of precast concrete columns & Beams for piperack & construction of Cast-in-Situ moment beams in SHELL Gasification Process facilities area of Phase-1, construction of structures for underground cooling water & drainage system. Use to prepare daily & weekly accomplishment Reports and submitting to project QC manager & seniors. Handled several activities of the project & ensured compliance; Accomplished project is furnished below: Project - SHELL Pearl GTL (Gas to Liquid) Project, Ras Laffan, State of Qatar; Client - M/s. SHELL Global Solutions International B.V. 3] CHIYODA Corporation, Japan and TECHNIP, France Joint Venture (CTJV), State of Qatar (Dec05 Oct07) Quality Control Civil Inspector Key Deliverables:

Responsible for the construction of 5 numbers double wall full containment Prestressed Concrete
Cryogenic LNG tanks. Was responsible for inspections as per RFI by Subcontractor for construction of civil structures under areas of LNG

Storage, Tankage Flare, inlet facilities, Knock Out Drum, Chemical Storage Tank, foundations of B.O.G. Compressors, and buildings for Sub-Station & Instrument Technical Room (ITR) --- Contractor: M/s. CCIC. Was reviewing TEST Reports on concrete materials, reinforcement & grout and CALIBRATION CERTIFICATE of all testing equipments. Handled several activities of the project & ensured compliance; Accomplished project is furnished below: Project - QATARGAS II LNG Plant (QGX) & Onshore Development Project, Ras Laffan, State of Qatar; Client - M/s. QATAR PETROLEUM and EXXONMOBIL QATARGAS (II) LTD. 4] (M/s. CCIC) Consolidated Contractors International Company S.A.L. JV with DUTCO BULFER BEATTY, Dubai / SAIPEM Kazakhstan / BECHTEL Equatorial Guinea,West Africa (March02 Nov05) Quality Control Civil Inspector Key Deliverables:

Inspection and execution for concrete structural members with Consulting Engineers of M/s.
Meinhardt Singapore Pte. Ltd. in compliance with Specifications, Drawings, ITPs, QCPs & Method Statements for 6 numbers of Shopping Mall Buildings in DUBAI. Witnessed concrete pouring and sampling operations during pouring activities. Inspection in compliance with Project Specifications and Drawings and the Documentations for Site Preparation Work on Earthwork for Site Grading & Levelling, Excavations/Backfilling procedures, Equipment Foundations, Scrapper Trap Paving, Anchor Block, Pig Launcher/Pig Receiver, Block Valve Stations, Installation of Culverts, Cable Trench, Burn Pit under REMOTE MANIFOLD STATIONs, WELLs & PIG OPERATION AREAs of GAS GATHERING/RE-INJECTION

NETWORK. Construction of R.C.C. Concrete Base (Tank Farm) for two LNG TANK. Construction of R.C.C. Concrete Drainage & Stone Rip Rap Ditches and Bituminous Road Construction. Installation of Chainlink Fence. Monitor & review compaction test activities & reports on backfilling and compaction on sub-grade. Preparation of punchlist items before precommisioning. Handled several activities of the projects & ensured compliance; Accomplished projects are furnished below: Dubai Mall Project (May05 Nov05); Client - M/s. Turner Construction International, Dubai, U.A.E. EG LNG Train 1 ALBA Phase III Project on Bioko Island of West Africa (Mar04 Feb05) Client: M/s. Marathon Oil Corporation, U.S.A. BAKU-TBILISI-CEYHAN (BTC) 42 Crude Oil Export Cross Country Pipeline Project Azerbaijan Section (May03 Feb04) with the Client M/s. British Petroleum. Karachaganak Development Project at North Eastern Gas Field, Republic of Kazakhstan (Mar02 Mar03) Client: M/s. Karachaganak Petroleum Operating B.V., Kazakhstan (A Partnership of AGIP, B.G. plc., CHEVRON TEXACO Corporation & Russias LUKOIL). 5] BLACK CAT Construction W.L.L., Mesaieed Industrial City, State of QATAR (Apr01 Oct01) Civil Supervisor Key Deliverables:

Executed Site Preparations, construction of Foundations for Process, Tank Flare, Knock Out Drum,
Vessel, Pipe support Foundations, Culvert Construction & horizontal Burn Pit Construction.

Handled several activities of the project & ensured compliance. Client : M/s. QATAR PETROLEUM, Doha, State of Qatar
6] AL OTAIBA & GARG Contg. CO, Abu Dhabi, U.A.E. (Jan00 Dec00) Civil Engineer Key Deliverables:

Executed different stages of work for the contract package (reinforcement, formwork and concrete
works), quantity surveying for structural concrete items for construction of Technical Training School & Mosque at Umm A1 Nar, ABU DHABI under M/s. ADNOC, U.A.E. 7] DODSAL Engineering & Construction Pte. Ltd., Dubai, U.A.E. (Nov98 Oct99) Civil Engineer Key Deliverables: Was responsible for all Front-End and Back-End activities of the Gas Pipeline Project. Executed Civil Works for preparation of ROW, construction of Valve Stations, Sub-Stations, Road, Pig Launcher/Pig Receiver Foundations, Pipe Sleepers, Earth Works, Fencing, Concrete Pavement & Culvert. Used to prepare METHOD STATEMENT for all Civil Works. Also used to maintain QA/QC records related to works.

Handled several activities of the project & ensured compliance; Accomplished project is furnished
below:

Project - Construction of 18 Condensate & 20 Make-up Gas Pipeline (191 Kms)


from ASAB NEW CONDENSATE EXTRACTION PLANT to RUWAIS OIL REFINERY; Client - M/s. Abu Dhabi National Oil Co. (ADNOC), U.A.E.

8] CHIYODA Corporation - FOSTER WHEELER & Co. LLC, Sultanate of Oman (Feb97 Oct98) Civil Quality Control Inspector Key Deliverables: Executed construction and involved for inspection of two PRESTRESSED CONCRETE CRYOGENIC LNG TANKS with 10m high CONCRETE PROCESS PLATFORM on top of Tank, each of 120,000 m3 net capacity, diameter 85m. & height 52m. Was responsible for PRESTRESSING works which was carried out by M/s. DEWIDAG SYSTEM INTERNATIONAL,Germany. Was assisting and reporting to Project QA/QC Manager in maintaining records of a system conforming to the principle of ISO. Was co-ordinating with contractors laboratory in verifying all laboratory test reports on concrete materials and grout materials. Used to review readymix concrete batch certificates. Also was involved in construction of GAS METERING FOUNDATION & RECEIVING STRUCTURE FOUNDATIONS & PIPE RACKS, FEED GAS UNIT STRUCTURE FOUNDATIONS, VESSEL FOUNDATION and BOX CULVERT in LNG PROCESS UNIT. Handled several activities of the project & ensured compliance; Accomplished project is furnished below: Project - OMAN LIQUEFIED NATURAL GAS PLANT (TRAIN 1); Client - M/s. SHELL International Petroleum Maatschappij B.V., The Hague, Netherlands in associated with M/s. OMAN LNG L.L.C.

9] PETRON Emirates Contg. CO L.L.C., Dubai (Dec94 Dec96) Civil Foreman Key Deliverables: AL AIN CEMENT FACTORY, AL AIN, U.A.E. - Engaged in construction of R.C.C. Underground Tunnel for various utility pipeline services, also was responsible for the cathodic protection on R.C. Steel and conductive adhesion coating on RCC Tunnel with the company Wilson Walton Ltd., U.S.A. GULF CEMENT COMPANY, RAS AL KHAIMAH - Involved in construction of foundations for PETROLEUM COKE SILO, PREGRINDING COMPLEX, SILICA CRUSHER & CONVEYOR ZONE AND COOLING TOWER. MASAFI MINERAL WATER CO. (LLC), MASAFI, U.A.E. - Involved in construction for Extension of Warehouse, Staff Quarters, Laboratory and foundation for Storage Mineral Water Tanks. 10] AL-Mutawa Sons & Co. Ltd., Saudi Arabia (Aug91 Aug93) Civil Foreman Key Deliverables: Assigned by the Company in SAUDI-ARAMCO, Daharan for their Construction for EXTENSION OF GENERAL UTILITY PLANT and in SCECO, Rastanura for their renovation of 6 NATD E & I Substations. 11] R.K. GHOSH Construction, Kolkata, India (Jul90 Jul91) Junior Civil Engineer Key Deliverables: Highly involved in execution for construction of Underground Metro Railway Concrete Tunnel construction project at Calcutta in India. Was involved for construction of two Metro Railway Stations and a twin-bored tunnel linking both stations. Was ensuring efficient and effective resource management facilities for the construction and used to coordinate with consulting engineering group including, Structural, Environmental, Mechanical and Electrical engineers covering a range of project requirements. Promoting safety as a value and ensuring all work activities in the area of site construction meet the Clients HSE policy and objectives. Promoting a total quality work ethic, safe & pleasant work environment and establishing an environment of mutual respect & teamwork among all concerned employees. Was an active

project representative for relationships with project operating divisions, local authorities, partners and contractors. Responsible for helping to organize, plan and execute many aspects of the assessment program including site testing and inspection, analysis, classification and reporting. Used to develop construction programmes, carried out a feasibility study, looked at possible tunneling methods

and alignments. Used to report Project Engineer for any deviation. Was having the necessary drive to achieve the goals of the target of time-bound schedules and delivered commercial success.

Execution for R.C.C. Cast-in-Situ Concrete Piling for foundation and various stages for
construction of Concrete Structures of Multistoried Building [11 Storied] in Delhi, India. Was responsible for Integrity Tests for individual Concrete pile. Coordinating with Sub-Contractors' Construction Managers / Site Engineers / QC Personnels and concerned Production Supervisors for maintaining the quality of day to day executed works to meet the requirements of Project Specifications, Drawings, QCPs, ITPs, Method Statements within project schedules. 12] PAM DEVELOPMENT Pvt. Ltd, India (Jan90 Jun90) Junior Civil Engineer Key Deliverables: Execution for construction of BRIDGE in Calcutta,INDIA under P.W.D. (Roads). The length of the bridge was 474 m + 42 m (Mid span length above the Railway Crossing of Belghoria Railway Station). Was responsible for all Prestessing activities of the Deck Slab of the Bridge. 13] M. N. DASTUR & Co. Ltd., India (Feb86 Jan90) Structural Draftsman Key Deliverables: Was involved for preparation of Design drawings on Industrial Steel Structures of Blast Furnace, Steel Melting Shop, Overhead Yard Piping, Cast House Exhaust Station, Underground Water Tunnel etc. for VISHAKHAPATNAM STEEL PLANT, INDIA. Also responsible for Site Supervision, Estimating, Checking of Fabrication/ Shop Drawings . Also used to prepare construction drawings of Industrial Steel Structures for TATA IRON AND STEEL CO. PHASE III MODERNISATION, INDIA.

Trainings and Courses


PROFICIENCY IN QUALITY CONCEPTS & PROCESSES: Attended successfully 5 days course on ISO 9001:2008 QUALITY MANAGEMENT SYSTEM AUDITOR / LEAD AUDITOR TRAINING PROGRAMME of ISO 9000:2000 Series Conducted by IRCA Registered & Approved Lead Auditors / Tutors of M/s. LLOYDS REGISTER QUALITY ASSURANCE LIMITED, INDIA from 15th to 19th June,2009 (5 days) in Mumbai, India. Completed successfully 2 days course on QUALITY MANAGEMENT SYSTEM INTERNAL AUDITOR for ISO 9001:2008 series TRAINING PROGRAMME (QMS) in accordance with ISO 19011 Conducted by IRCA Registered & Approved Lead Auditors / Tutors of M/s. VELOSI CERTIFICATION L.L.C.,QATAR on 26th & 27th October,2008 (2 days) in Doha, Qatar. Completed successfully 2 days course on TOTAL QUALITY MANAGEMENT SYSTEM, AWARENESS, DOCUMENTATION REQUIREMENTS & BENEFITS / OBJECTIVES of ISO 9001:2000 QUALITY MANAGEMENT SYSTEM (QMS) Conducted by Management & Marketing Consultancy Services, Oman on 21st January, 1998 on behalf of BSI TRAINING SERVICES in Oman. Attended a seminar for one week and performed well in Quality Assurance training programmes on FLAWLESS SITE ACTIVITIES (FSI) & SITE TECHNICAL ASSURANCE REVIEW

(STAR) INTERNAL / EXTERNAL PROCESS AWARENESS Conducted on April, 2008 in Qatar by Project QA MANAGER, JGC CORPORATION - KELLOGG BROWN & ROOT JV, QATAR SHELL PEARL GTL PROJECT on behalf of SHELL GLOBAL SOLUTIONS INTERNATIONAL B.V., a network of ROYAL DUTCH/SHELL GROUP. AWARENESS OF INDUSTRIAL SAFETY:-

Attended MANDATORY HSE INDUCTION and safety courses conducted by SHELL, JGC

CORPORATION, M.W. KELLOGG BROWN & ROOT, SAUDI ARAMCO, ADNOC, GASCO, PDO, MARATHON OIL COMPANY, CHIYODA & FOSTER WHEELER JOINT VENTURE, CHIYODA & TECHNIP JOINT VENTURE and QATARGAS II. Attended AWARENESS OF HAZARDS ASSOCIATED WITH CONSTRUCTION WORKS & EFFECTS and FIRE FIGHTING courses conducted by M/s. FOSTER WHEELER WORLD SERVICES LTD., U.K. in 1998. Undergone training on INDUSTRIAL FIRST AID conducted by M/s. TECHNICAL AND ADMINISTRATIVE TRAINING INSTITUTE LLC., Sultanate of Oman in 1998.

Undergone training on SUPERVISORS INCIDENT & INJURY-FREE by JMJ ASSOCIATES UK, on


behalf of QATARGAS LTD. , QATAR in 2007 & QATAR SHELL GTL LTD in 2008.

Achievement in Educational Qualifications Diploma in Civil Engineering in 1985 obtained 1st Class with 75 % marks. Proficiency Well versed in Computer Programmes - MS WINDOW, MS EXCELL & POWER
POINT.

Personal Details
Date of birth : 12th February, 1965 Adept in Languages : English, Hindi, Bengali, Arabic and Russian Address for Communication : 4 Netaji Pally, Manikdanga Road, P.O. - Ghola Bazar, Sodepur, Marital Status References : :
Kolkata 70011, Pin Code - 700111, West Bengal, INDIA. Married Will be furnished on Request