Sie sind auf Seite 1von 18

Bosch Supplier Development Program

Lean Production

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Lean Production
... stands for efficiency increase by standardization and continuous improvement. ... has been introduced by Japanese companies

... stands for associates that think, decide and act in teams.

... is called BPS in the Bosch plants.


means:

Just produce what the customer needs!


... is a philosophy that leads to waste reduced processes in a company.

... looks at intra-corporate and inter-corporate processes

... stands for delivery service, quality orientation and cost reduction.

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

What does the Customer pay for ?


Activities that are obviously unnecessary in order to increase product value (waiting because of faults, double handling, scrapping, ) Work with evident waste Activities through which a product acquires a greater value (tool in contact, stroke of a press, mixing procedure, )

Work with added value

Process Process

eliminate

Work with concealed waste

minimize

Activities that do not bring an increase in value but which are required under given circumstances (clamping a workpiece, change over, refilling of reservoirs, )

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Waste in the Production Process


Overproduction means unnecessary and additional...
Space/surface area

space / surface area transport


Stocks Transport

Q C D

waiting times repairs / errors movement times

Overproduction
Movement times Waiting times

inventory

Repairs/errors

in the product in the machines / equipment in the use of employees

in the processes of material


handling and logistics

in replanning / redesign ...

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Inventory as a safety cushion


Inventory

Problems because of waste

Problems because of waste

Problems because of waste

Problems are hidden


Examples: Machinery breakdown Missing material Bottle-necks in the production Quality defects

Problems become transparent


Quick detection Necessity to solve problems quickly by the affected persons

Root causes are disposed


The disposition of the root causes allows a production with low level inventories and enough agility and process

Make problems visible

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Lean Production Principles


Process Orientation Pull System Design, control and improve procedures and holistic processes Only produce on real customer demand Avoid failures through preventive actions to deliver perfect quality to the customer Flexibility regarding volumes, product variations and product generations Realization of Best in Class standards

Perfect Quality

Flexibility

Standardization

Continuous Improvement

Theres nothing that cant be improved any further Business processes and manufacturing procedures are self explaining. Deviations are immediately visible Clear assignment of responsibility and competence to the process level

Transparency

Associate Empowerment

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Lean Production Principles


Process Orientation Design, control and improve procedures and holistic processes

Optimization of isolated applications

Optimization of the holistic process

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Lean Production Principles


Pull System Only produce on real customer demand

Push System

Pull System

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Pull-Principle

Push-Principle

Input

Inventory in production

Output

Pull-Principle

Input

Inventory in production

Output

Closed loop

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Inventories and Throughput Time


long reaction time

Push-System

Inventory

Inventory

inventory high and fluctuating through put time fluctuates forecast oriented central planning and control

Reality

Ideal Time

frequent planning changes

Pull-System

Inventory

Inventory

short reaction time stable inventory levels stable through put time

Reality Time

consume oriented

10

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Lean Production Principles


Perfect Quality Avoid failures through preventive actions to deliver perfect quality to the customer

Quality cost

ig es d

l y ar eria im t pr m a

o pr

t io uc d

n st cu

er m o

Problem detection

11

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Lean Production Principles


Flexibility Flexibility regarding volumes, product variations and product generations
Strategy: Produce high volume parts every day
2000 1800 1600 1400 1200 parts / day 1000 800 600 400 200 0 1 2 3 4 5 6 7 8 9 10 day 11 12 13 14 15 16 17 18 19 20

12

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Lean Production Principles


Standardization Continuous Improvement Transparency Associate Empowerment Realization of Best in Class standards Theres nothing that cant be improved any further Business processes and manufacturing procedures are self explaining. Deviations are immediately visible Clear assignment of responsibility and competence to the process level

standards
tran y improvement renc spa

time

13

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Target: Supermarkets and Pull-Principle


A supermarket is a well-defined buffer which is used to control upstreamed process steps. Characteristics: well-defined inventories (min/max-levels) clear labeling withdrawal gives a kanban-signal first-in-first-out principle (FIFO) is realized the producer is responsible for the inventories in the supermarket high volume parts have seperate trays for every part number.

source: ChP

empties

source: EB/P-RS

product

source: TgP

14

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Target: Flow orientated Layout and Milkrun


Transport of empty KLT Delivery of parts FIFO FIFO FIFO FIFO

Milkrun

Multi-machinery handling

FIFO

FIFO

FIFO

FIFO

Q-base with visualization

Shipping transaction

Transport of finished products Delivery of empty KLT


15

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Target: Send-ahead Quantity 1


Lot production
Process A 10 minutes Process B (lot size 10 pcs, cycle time 1 min/pc) Process C

10 minutes

10 minutes

Throughput time: min. 30 minutes

Send-ahead quantity 1
Process Process Process A B C

make one - move one

Throughput time: 12 minutes per 10 pieces

16

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Target: Quick Change Over Processes


usual change over produce last part external change over change over time internal change over first part produce exernal change over

quick change over produce last part external change over change over time first part external internal change over change over produce

17

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Bosch Supplier Development Program

Target Concept Production


Kanban control

Process 1

Process 2

Process 3

withdrawal from supermarkets

buffer flow production scrap rework

non value adding processes

pull principle

Sub-supplier

Supplier

Bosch

18

Confidential | CP/PJ-SDT | Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying and passing on to third parties.

Das könnte Ihnen auch gefallen