1.1 References: 1. IEEE 80 2000: Guide For Safety in Substation Grounding: 2. 11 TCN 18-2006 Std: Regulations on Electric Power Installations. Part I. Generalities- Common Requirements. 3. 11 TCN 19-2006 Std: Regulations on Electric Power Installations. Part II. Electrical Conduction Systems 4. Safety Engineering in Electric Power Supply 5. Contract specification 1.2 Attachments: - Results of measuring resistivity in "Survey of Intel transmission line project - SHTP" II. EXPLANATION: Using results of measuring resistivity in "Survey of Intel transmission line project - SHTP" at 6 test points: 1, 2, 3, 4, 5 and 6 (see attached documents): We plan to use ground rod 3m long. Therefore, only results of measuring resistivity to 4m depth are used average maximum resistivity is = 49.08 Ohm-m (at 5) average minimum resistivity is = 20.91 Ohm-m (at 3) To be on the safe side, use average maximum resistivity in calculation for all towers: p0 = 49.08 Ohm-m According to "11 TCN 18-2006" Std and Contract Specification. The footing resistance of each tower must be lower than 10 Ohms for soil resistivity up to 100 Ohm-m. Natural resistance of tower foundation is ignored. II. GROUND CONDUCTOR SIZE: Calculation of ground conductor size can made from IEEE std. 80-2000 by using the flowing formula (Eq. 40):
A = I
1 TCAP . 10 t .a . P c r r
-4
K 0 + Tm . ln K + T 0 a
(Eq.40)
where: = I"k3 x 3/(2+x0/x1) I = I"k1 : fault current for a line to earth short circuit, in kA I"k1 I"k3 : fault current for three phase short circuit, in kA : cross section of tower connection to ground, in mm2 A : maximum allowable temperature, in oC Tm : ambient temperature, in oC Ta : reference temperature for material constants, in oC Tr ar : thermal coefficient of resistivity at Tr, in 1/oC rr : resistivity of the conductor at Tr in mOhm-cm Ko : (1/r) - Tr tc : time of current flow, in second : thermal capacity factor, in J/cm3/oC TCAP Ground connecting wire is copper-clad steel wire with 30 percent conductivity. Data: x0/x1 I"k3 I"k1 Tm Ta Tr
= = = = = =
kA kA o C o C o C
Page 1
Black & Veatch International Project Name: Saigon Hi-Tech Park 110kV Substation Project Number: 1145211
ar rr tc TCAP Ko A
= = = = = =
(calculated)
2 145.87 mm
Standard size for connection of tower to ground (two wires) III. GROUND RESISTANCE:
Minimum area of foundation is 6,0m x 6,0m. Therefore we arrange and calculate ground resisitance based on this foundation for typical grounding and apply for other foundations (see dwg.VINA2-SHTP-07.TL.D.05) a) Formulae The resistance of system consisting of combination of horizontal conductors and vertical electrodes is: (burried at 0.8m depth)
R1R 2 R1 + R
where: R1 R2
: resistance of the horizontal conductor in Ohms : resistance of the vertical rods in Ohms
R1 =
Rh ;R m1
Rv R m
Rh
L2 0 . 366 c = r 1 lg 2 ah Lc 1
Rv =
where:
L 1 4h + Lr 0.366 r 2 lg r + lg 2 Lr b 2 4h2 - Lr
: soil resistivity for calculation of Rh in Ohm.m : soil resistivity for calculation of Rv in Ohm.m : total length of all horizontal conductors in m : length of each vertical rod in m : diameter of conductor in m : diameter of rod in m : adjustment coefficients of soil resistivity (table 8.1, reference 4.) : coefficients considering mutual influence (h, : number of vertical rods
Page 2
Black & Veatch International Project Name: Saigon Hi-Tech Park 110kV Substation Project Number: 1145211
= = = = = =
Calculation of m1, m2 Determine Ratio rod spacing / rod length For vertical rod: rod spacing (m) = rod length (m) = Ratio: rod spac./ rod length = For horizontal conductor conductor spacing (m) = conductor length (m) = Ratio: cond. spac./ cond. length = Result: m1 (inter/extrapolation from table 8.3)= m2 (inter/extrapolation from table 8.3)= Calculation of R1 0.366r1/Lc Lc2/(2ah1) Rh R1 Calculation of R2 0.366r2/Lr lg(Lr/b) lg[(4h2+Lr)/(4h2-Lr)] Rv R2
0.93 0.86
= = = =
= = = = =
< 10
Ohms
This result meets "11 TCN 18-2006" Std. and Contract Specification and applies to all towers in this project. Note: This option is not generally used for transmission lines in Vietnam due to high cost and vulnerable to theft.
Page 3
Black & Veatch International Project Name: Saigon Hi-Tech Park 110kV Substation Project Number: 1145211
1.1 References: 1. IEEE 80 2000: Guide For Safety in Substation Grounding: 2. 11 TCN 18-2006 Std: Regulations on Electric Power Installations. Part I. Generalities- Common Requirements. 3. 11 TCN 19-2006 Std: Regulations on Electric Power Installations. Part II. Electrical Conduction Systems 4. Safety Engineering in Electric Power Supply 5. Contract specification 1.2 Attachments: - Results of measuring resistivity in "Survey of Intel transmission line project - SHTP" II. EXPLANATION: Using results of measuring resistivity in "Survey of Intel transmission line project - SHTP" at 6 test points: 1, 2, 3, 4, 5 and 6 (see attached documents): We plan to use ground rod 3m long. Therefore, only results of measuring resistivity to 4m depth are used average maximum resistivity is = 49.08 Ohm-m (at 5) average minimum resistivity is = 20.91 Ohm-m (at 3) To be on the safe side, use average maximum resistivity in calculation for all towers: p0 = 49.08 Ohm-m According to "11 TCN 18-2006" Std and Contract Specification. The footing resistance of each tower must be lower than 10 Ohms for soil resistivity. up to 100 Ohm-m. Natural resistance of tower foundation is ignored. II. GROUND CONDUCTOR SIZE: Calculation of ground conductor size can made from IEEE std. 80-2000 by using the flowing formula (Eq. 40):
A = I
1 TCAP . 10 t .a . P c r r
-4
K 0 + Tm . ln K + T 0 a
(Eq.40)
where: = I"k3 x 3/(2+x0/x1) I = I"k1 : fault current for a line to earth short circuit, in kA I"k1 I"k3 : fault current for three phase short circuit, in kA : cross section of tower connection to ground, in mm2 A : maximum allowable temperature, in oC Tm : ambient temperature, in oC Ta : reference temperature for material constants, in oC Tr ar : thermal coefficient of resistivity at Tr, in 1/oC rr : resistivity of the conductor at Tr in mOhm-cm Ko : (1/r) - Tr tc : time of current flow, in second : thermal capacity factor, in J/cm3/oC TCAP Ground connecting wire is steel wire (with 10,8 percent conductivity). Data: x0/x1 I"k3 I"k1 Tm Ta Tr
= = = = = =
kA kA o C o C o C
Page 1
Black & Veatch International Project Name: Saigon Hi-Tech Park 110kV Substation Project Number: 1145211
ar rr tc TCAP Ko A
= = = = = =
(calculated)
2 193.32 mm
Standard size for connection of tower to ground (two wires) III. GROUND RESISTANCE:
Minimum area of foundation is 6,0m x 6,0m. Therefore we arrange and calculate ground resisitance based on this foundation for typical grounding and apply for other foundations (see dwg.VINA2-SHTP-07.TL.D.05) a) Formulae The resistance of system consisting of combination of horizontal conductors and vertical electrodes is: (burried at 0.8m depth)
R1R 2 R1 + R
where: R1 R2
: resistance of the horizontal conductor in Ohms : resistance of the vertical rods in Ohms
R1 =
Rh ;R m1
Rv R m
Rh
L2 0 . 366 c = r 1 lg 2 ah Lc 1
(table 8.2)
Rv =
where:
L 1 4h + Lr 0.366 r 2 lg r + lg 2 Lr b 2 4h2 - Lr
(table 8.2)
: soil resistivity for calculation of Rh in Ohm.m : soil resistivity for calculation of Rv in Ohm.m : total length of all horizontal conductors in m : length of each vertical rod in m : diameter of conductor in m : diameter of rod in m : adjustment coefficients of soil resistivity (table 8.1, reference 4.) : coefficients considering mutual influence (h, : number of vertical rods
= = = = =
Page 2
Black & Veatch International Project Name: Saigon Hi-Tech Park 110kV Substation Project Number: 1145211
= = = = =
Calculation of m1, m2 Determine Ratio rod spacing / rod length For vertical rod: rod spacing (m) = rod length (m) = Ratio: rod spac./ rod length = For horizontal conductor conductor spacing (m) = conductor length (m) = Ratio: cond. spac./ cond. Length = Result: m1 (inter/extrapolation from table 8.3)= m2 (inter/extrapolation from table 8.3)= Calculation of R1 0.366r1/Lc Lc2/(2ah1) Rh R1 Calculation of R2 0.366r2/Lr lg(Lr/b) lg[(4h2+Lr)/(4h2-Lr)] Rv R2
0.93 0.86
= = = =
= = = = =
< 10
Ohms
This result meets the requirement in "11 TCN 18-2006" Std. and Contract Specifications and applies to all towers in this project. Note: Steel Wire is widely used for counterpoises in transmission lines in Vietnam due to relatively low cost and not attractive to theft. Therefore we choose this option.
Page 3