DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN
: PROYEK PEMBANGUNAN RUMAH
PEKERJAAN
: KONSTRUKSI RUMAH
LOKASI
: JAKARTA
TAHUN ANGGARAN : 2008
NO
I

URAIAN PEKERJAAN

WINNER T. F
20307046
3 TB 01

SATUAN

INDEKS

BAHAN DAN UPAH (Rp)

JUMLAH (Rp)

PEKERJAAN PERSIAPAN

1 PEMBERSIHAN LAHAN
Pekerja
Mandor
TOTAL

10m
10m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

m
m
m
m
m
m

0.01
0.1
0.8
0.08
0.28
0.014

8,050,000.00
15,000.00
65,734.00
75,671.00
55,798.00
85,607.00

80,500.00
1,500.00
52,587.20
6,053.68
15,623.44
1,198.50
157,462.82

m
m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

m
m
m

1.2
0.3
0.01

180,000.00
55,798.00
85,607.00

216,000.00
16,739.40
856.07
233,595.47

2 PEMASANGAN BOUWPLANK
Papan dan Pancang
Paku
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
TOTAL

3 GALIAN TANAH U/ PONDASI


Pekerja
Mandor
TOTAL

4 URUGAN PASIR BWH PONDASI


Pasir
Pekerja
Mandor
TOTAL

5 URUGAN PASIR BWH LANTAI


Pasir
Pekerja
Mandor
TOTAL

m
m
m

1.2
0.3
0.01

180,000.00
55,798.00
85,607.00

216,000.00
16,739.40
856.07
233,595.47

m
m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

m
m

0.75
0.025

55,798.00
85,607.00

41,848.50
2,140.18
43,988.68

6 URUGAN TANAH KEMBALI SISI PONDASI


Pekerja
Mandor
TOTAL

7 URUGAN TANAH PENINGGIAN LANTAI


Pekerja
Mandor
TOTAL

NO
II
1

III
1

URAIAN PEKERJAAN
PEKERJAAN PONDASI
PONDASI BATU KALI
Batu Kali
Semen
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
TOTAL
PEKERJAAN BETON
SLOOF BETON

SATUAN

m
m
m
m
m
m
m

INDEKS

1.2
4.26
0.34
0.6
0.06
1.5
0.015

BAHAN DAN UPAH (Rp)

160,000.00
52,000.00
160,000.00
65,734.00
75,671.00
55,798.00
85,607.00

JUMLAH (Rp)

192,000.00
221,520.00
54,400.00
39,440.40
4,540.26
83,697.00
1,284.11
596,881.77

Upah Pembesian
Kepala tukang batu
Pekerja
Mandor
TOTAL

m
m
m
m

0.75
0.039
0.781
0.078

1,095,000.00
75,671.00
55,798.00
85,607.00

821,250.00
2,951.17
43,578.24
6,677.35
874,456.75

m
m
m
m

0.75
0.039
0.781
0.078

1,095,000.00
75,671.00
55,798.00
85,607.00

821,250.00
2,951.17
43,578.24
6,677.35
874,456.75

m
m
m
m

0.75
0.039
0.781
0.078

1,095,000.00
75,671.00
55,798.00
85,607.00

821,250.00
2,951.17
43,578.24
6,677.35
874,456.75

m
m
m
m
m
m

8.5
0.54
0.82
1
3
0.1

52,000.00
160,000.00
260,000.00
65,734.00
55,798.00
85,607.00

442,000.00
86,400.00
213,200.00
65,734.00
167,394.00
8,560.70
983,288.70

m
m
m
m

8.5
0.54
0.82
1

52,000.00
160,000.00
260,000.00
65,734.00

442,000.00
86,400.00
213,200.00
65,734.00

2 KOLOM BETON
Upah Pembesian
Kepala tukang batu
Pekerja
Mandor
TOTAL

3 RING BALK BETON


Upah Pembesian
Kepala tukang batu
Pekerja
Mandor
TOTAL

4 MEJA DAPUR
Semen
Pasir beton
Kerikil
Tukang batu
Pekerja
Mandor
TOTAL

5 LIST PLANK
Semen
Pasir beton
Kerikil
Tukang batu

Pekerja
Mandor
TOTAL

NO

m
m

URAIAN PEKERJAAN

SATUAN

3
0.1

INDEKS

55,798.00
85,607.00

BAHAN DAN UPAH (Rp)

167,394.00
8,560.70
983,288.70
JUMLAH (Rp)

6 TOPI TERAS
Semen
Pasir beton
Kerikil
Tukang batu
Pekerja
Mandor
TOTAL

m
m
m
m
m
m

8.5
0.54
0.82
1
3
0.1

52,000.00
160,000.00
260,000.00
65,734.00
55,798.00
85,607.00

442,000.00
86,400.00
213,200.00
65,734.00
167,394.00
8,560.70
983,288.70

m
m
m
m
m
m

8.5
0.54
0.82
1
3
0.1

52,000.00
160,000.00
260,000.00
65,734.00
55,798.00
85,607.00

442,000.00
86,400.00
213,200.00
65,734.00
167,394.00
8,560.70
983,288.70

m
m
m
m
m
m
m

80
0.52
0.042
0.16
0.016
0.48
0.048

260.00
35,100.00
169,000.00
65,734.00
75,671.00
55,798.00
85,607.00

20,800.00
18,252.00
7,098.00
10,517.44
1,210.74
26,783.04
4,109.14

7 LANTAI KERJA
Semen
Pasir beton
Kerikil
Tukang batu
Pekerja
Mandor
TOTAL

IV
1

PEKERJAAN PASANGAN DINDING DAN PLESTERAN


PASANGAN DINDING BATA MERAH ( 1:2 )
Batu bata merah
Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor

TOTAL

88,770.35

2 PASANGAN BATU ROLLAG ( 1:4 )


Batu bata merah
Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

m
m
m
m
m
m
m

475
2.4
0.416
1.5
0.15
3
0.15

260.00
35,100.00
169,000.00
65,734.00
75,671.00
55,798.00
85,607.00

123,500.00
84,240.00
70,304.00
98,601.00
11,350.65
167,394.00
12,841.05
568,230.70

m
m
m
m
m
m

0.2368
0.019
0.214
0.021
0.4
0.02

35,100.00
169,000.00
65,734.00
75,671.00
55,798.00
85,607.00

8,311.68
3,211.00
14,067.08
1,589.09
22,319.20
1,712.14
51,210.19

BAHAN DAN UPAH (Rp)

JUMLAH (Rp)

150,000.00
169,000.00
35,100.00
2,210.00
65,734.00
75,671.00
55,798.00

157,500.00
5,070.00
7,020.00
154.70
26,293.60
5,675.33
11,159.60

3 PLESTERAN DAN ACI ( 1:2, TEBAL 15 mm )


Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

NO
V
1

URAIAN PEKERJAAN
PEKERJAAN LANTAI DAN DINDING
LANTAI KERAMIK ( 30X30 CM )
Ubin keramik 30x30
Pasir pasang
Semen
Semen warna
Tukang batu
Kepala T. Batu
Pekerja

SATUAN

m
m
m
m
m
m
m

INDEKS

1.05
0.03
0.2
0.07
0.4
0.075
0.2

Mandor
TOTAL
LANTAI KERAMIK ( 20X20 CM)
Ubin keramik 20x20
Pasir pasang
Semen
Semen warna
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

0.02

85,607.00

1,712.14
214,585.37

m
m
m
m
m
m
m
m

1.05
0.03
0.2
0.1
0.4
0.075
0.2
0.02

70,000.00
169,000.00
35,100.00
2,210.00
65,734.00
75,671.00
55,798.00
85,607.00

73,500.00
5,070.00
7,020.00
221.00
26,293.60
5,675.33
11,159.60
1,712.14
130,651.67

m
m
m
m
m
m
m
m

1.05
0.03
0.2
1
0.5
0.1
0.25
0.025

70,000.00
169,000.00
35,100.00
2,210.00
65,734.00
75,671.00
55,798.00
85,607.00

73,500.00
5,070.00
7,020.00
2,210.00
32,867.00
7,567.10
13,949.50
2,140.18
144,323.78

m
m
m
m
m
m
m

1.01
0.025
0.03
0.1
0.01
0.15
0.01

17,500.00
35,100.00
169,000.00
65,374.00
75,671.00
55,798.00
85,607.00

17,675.00
877.50
5,070.00
6,537.40
756.71
8,369.70
856.07
40,142.38

2 DINDING KERAMIK ( 20X25 CM )


Ubin keramik 20x25
Pasir pasang
Semen
Semen warna
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

3 PLIN KERAMIK
Plin keramik
Semen
Pasir pasang
Tukang batu
Kepala T. Batu
Pekerja
Mandor
TOTAL

VI

PEKERJAAN ATAP

1 KUDA-KUDA ATAP RUMAH


1.10
Balok kayu bengkirai

8,050,000.00

8,855,000.00

8,000.00

24,000.00

8,900.00

133,500.00

65,374.00

980,610.00

75,671.00

113,506.50

55,798.00

278,990.00

85,607.00

21,401.75
10,407,008.25

8,050,000.00

8,855,000.00

8,000.00

23,200.00

65,374.00

294,183.00

75,671.00

34,051.95

55,798.00

83,697.00

85,607.00

6,420.53
9,296,552.48

6,900,000.00

82,800.00

6,900,000.00

36,570.00

3.00
Paku

kg

0
15.00

Besi strip

kg

0
15.00

Tukang Kayu

org/hr

0
1.50

Kepala Tukang Kayu

org/hr

0
5.00

Pekerja

org/hr

0
0.25

Mandor

org/hr

2 GORDING KAYU
1.100
Balok kayu bengkirai

2.90
Paku

kg

0
4.500

Tukang Kayu

org/hr

0
0.450

Kepala Tukang Kayu

org/hr

0
1.500

Pekerja

org/hr

0
0.075

Mandor

org/hr

3 KASO DAN RENG


0.012
Kaso

0.005
Reng

0.150
Paku Rata-rata

kg

8,000.00

1,200.00

65,374.00

6,537.40

75,671.00

756.71

55,798.00

5,579.80

85,607.00

428.04
133,871.95

9,430,000.00

66,010.00

8,000.00

400.00

0.100
Tukang Kayu

org/hr

0
0.010

Kepala Tukang Kayu

org/hr

0
0.100

Pekerja

org/hr

0
0.005

Mandor

org/hr

4 LISTPLANK KAYU 3/20


0.007
Papan kayu Samarinda

0.050
Paku Rata-rata

kg

0
0.200

Tukang Kayu

org/hr

65,374.00

13,074.80

75,671.00

1,513.42

55,798.00

5,579.80

85,607.00

428.04
87,006.06

3,300.00

36,630.00

65,374.00

6,537.40

75,671.00

756.71

55,798.00

11,159.60

85,607.00

856.07
55,939.78

0.020
Kepala Tukang Kayu

org/hr

0
0.100

Pekerja

org/hr

0
0.005

Mandor

org/hr

bh

PASANG ATAP GENTENG PRESS BETON


11.10
Genteng Press Beton

0.10
Tukang Batu

org/hr

0
0.01

Kepala Tukang Batu

org/hr

0
0.20

Pekerja

org/hr

0
0.01

Mandor

org/hr

PASANG NOK GENTENG PRESS BETON


4.04
Nok Genteng Press Beton

bh

4,000.00

16,160.00

35,100.00

7,581.60

130,000.00

4,160.00

6,900,000.00

20,700.00

65,374.00

13,074.80

75,671.00

1,513.42

55,798.00

22,319.20

85,607.00

1,712.14
87,221.16

6,900,000.00

55,200.00

6,900,000.00

16,560.00

20,000.00

21,000.00

8,000.00

1,200.00

10,000.00

1,500.00

1,500.00

150.00

0.21
Semen

zak

6
0.03

Pasir Beton

2
0.00

Papan Ruiter Kamper

3
0.20

Tukang Batu

org/hr

0
0.02

Kepala Tukang Batu

org/hr

0
0.40

Pekerja

org/hr

0
0.02

Mandor

org/hr

Pekerjaan Talang Datar Seng 0,3 mm + Alas Papan, tebal 2 Cm


0.00
Papan Kamper 2/20

0.00
Kaso

2
1.05

Seng plat tebal 0,3 mm

m'

0
0.15

Paku Rata-rata

kg

0
0.15

Paku Seng

kg

0
0.10

Timah

kg

0
0.20

Tukang Besi

org/hr

65,374.00

13,074.80

65,374.00

9,806.10

75,671.00

1,513.42

55,798.00
85,607.00

11,159.60
856.07

0.15
Tukang Kayu

org/hr

0
0.02

Kepala Tukang Besi

org/hr

0
0.20

Pekerja
Mandor

org/hr
org/hr

0
0.01

0
132,019.99

VII PEKERJAAN PLAFOND


1 Plafond Eternit/Asbes Ukuran eternit 60x120x0,5 cm
1.40
Eternit/asbes plat 60x120

lbr

27,600.00

38,640.00

8,000.00

240.00

0.03
Paku Rata-rata

kg

0
0.16

Tukang Kayu

org/hr

65,374.00

10,459.84

75,671.00

1,210.74

55,798.00

6,249.38

85,607.00

513.64
57,313.59

8,050,000.00

40,250.00

6,900,000.00

138,000.00

8,000.00

1,600.00

65,374.00

26,149.60

75,671.00

3,026.84

55,798.00

15,623.44

85,607.00

1,198.50
225,848.38

0.01
Kepala Tukang Kayu

org/hr

6
0.11

Pekerja

org/hr

2
0.00

Mandor

org/hr

Rangka Plafond Kayu (Grid 60 x 60 Cm)


0.00
Balok kayu bengkirai

0.02
Kaso Kayu

0
0.20

Paku Rata-rata

kg

0
0.40

Tukang Kayu

org/hr

0
0.04

Kepala Tukang Kayu

org/hr

0
0.28

Pekerja

org/hr

0
0.01

Mandor

org/hr

VIII PEKERJAAN KUSEN, PINTU, JENDELA


1 Pekerjaan Kaca (tebal < 10 mm)
Kaca polos

1.10

5,000.00

5,500.00

0
0.24
Tukang Kayu

org/hr

65,374.00

15,689.76

75,671.00

1,816.10

55,798.00

4,463.84

85,607.00

342.43
27,812.13

9,430,000.00

603,520.00

8,000.00

1,600.00

8,000.00

2,400.00

27,600.00

110,400.00

0.02
Kepala Tukang Kayu

org/hr

4
0.08

Pekerja

org/hr

0
0.00

Mandor

org/hr

Daun Pintu/ Jendela Jalusi/ Krepyak (Kayu Kamper, tebal 3,5

2 cm)

0.06
Papan kayu Samarinda

0.20
Paku rata-rata

kg

0
0.30

Lem kayu

kg

0
4.00

List kayu

m'

0
5.400

Tukang Kayu

org/hr

65,374.00

353,019.60

75,671.00

40,862.34

55,798.00

100,436.40

85,607.00

7,704.63
1,219,942.97

0.540
Kepala Tukang Kayu

org/hr

0
1.800

Pekerja

org/hr

0
0.090

Mandor

IX
1

org/hr

kg

PEKERJAAN CAT
Cat Kayu (2 Lapis)
Termasuk Pekerjaan : Plamur, mengamplas
0.15
Plamur Kayu

9,750.00

1,462.50

2,000.00

1,000.00

8,000.00

1,200.00

0.50
Amplas

lbr

0
0.15

Cat dasar

kg

0.30
Cat Kayu

kg

20,000.00

6,000.00

8,000.00

1,200.00

6,500.00

325.00

0.15
Thinner

ltr

0
0.05

Kuas

bh

0
0.25

Tukang Cat

org/hr

65,374.00

16,343.50

75,671.00

1,891.78

55,798.00

11,159.60

85,607.00

856.07
41,438.45

9,750.00

1,950.00

2,000.00

1,000.00

50,000.00

5,000.00

50,000.00

10,000.00

9,000.00

135.00

65,374.00

16,343.50

75,671.00

1,891.78

55,798.00

11,159.60

85,607.00

856.07
48,335.95

0.02
Kepala Tukang Cat

org/hr

5
0.20

Pekerja

org/hr

0
0.01

Mandor

org/hr

kg

Cat Dinding Interior (Dinding Baru, 3 Lapis)


0.20
Plamur Tembok

0.50
Amplas

lbr

0
0.10

Cat dasar

kg

0
0.20

Cat Tembok

kg

0
0.01

Kuas roll

bh

5
0.25

Tukang Cat

org/hr

0
0.02

Kepala Tukang Cat

org/hr

5
0.20

Pekerja

org/hr

0
0.01

Mandor

org/hr

kg

Cat Dinding Exterior (Dinding Baru, 3 Lapis) ICI


0.12
Alkali ICI sebelum pengecatan

50,000.00

6,250.00

0.20
Cat tembok ICI Wheathershield

kg

20,000.00

4,000.00

2,000.00

1,000.00

9,000.00

135.00

0.50
Amplas

lbr

0
0.01

Kuas roll

bh

5
0.28

Tukang Cat

org/hr

65,374.00

18,304.72

75,671.00

2,270.13

55,798.00

8,927.68

85,607.00

856.07
41,743.60

0.03
Kepala Tukang Cat

org/hr

0
0.16

Pekerja

org/hr

0
0.01

Mandor

org/hr