For each chapter, the full text of the QMPP must be considered. (supplier) (SQD)
Evidence Document / Remark Action
planned done
S/C and C/C characteristics are marked in all relevant documents (e.g.
1.6.1 drawings, FMEAs, control plans). 10 Yes, all relevant documents fulfills.
Cpk/Ppk ≥ 1.33 for S/C and ≥ 1.67 for C/C characteristics are met and
Due to low Cpk there is a Plan in order to Action Plan in order to
1.6.2 measured regularly, or 100% control exists or a Bendix/KB released control 4 improve those. achieve Cpk ≥1.33
2009
plan exists, or batch related material certificates exist.
Training evidence (signatures per employee) for trainings on S/C and C/C
parts handling exist. S/C and C/C are integrated and visualized in workplace
1.6.5 procedures. 10 Yes, there is the evidences.
Retention periods are met and subcontractors with S/C or C/C parts have
1.6.6 been committed on the special retention periods. calzada
Process audits for all parts with special characteristics are performed yearly
To develope a Process Feb
1.6.7 with a questionnaire considering ISO/TS 16949 and VDA 6.3 requirements. 4 There is only QMS Audits.
Audits Plan. 2009
All modifications to the product and process are documented in a lifetime Yes, all documents are up dating for every
1.7 documentation, including the date of the change 10 change.
A control system for the lifetime of toolings secures announcement to
To develope lifetime
1.8 Bendix/KB and additional control measures at the end of tooling lifetimes 4 There is lifetime análisis about abrasives.
análisis for toolings.
2009
1.9 All 8D-Reports are update and to Bendix/KB according the timelines 10 At the moment there is not 8D's open.
Layout and inspection tests are stipulated in the control plans and are The Control Plans have stipulated those and
1.10 executed accordingly. 10 those are executed.
The technical cleanliness of parts and packaging with consideration of
1.11 Bendix/KB specifications is secured. calzada
The supplier is registrated SourcingParts (SIS card) is used (Not for Bendix
1.12 suppliers but necessary to supply SFN Europe) calzada
Parts are processed and delivered following the “first in – first out” principle,
Yes, the delivers fulfills FIFO and the batch
1.14 with the batch identified on the box. The batch number must be 10 number is on every box.
communicated to the KB plant with every delivery.
Deviating parts are only delivered with released MCR, 8D Report, and
special identification labels on the containers showing the MCR-Number.
1.15 calzada
The supplier observes the retention periods for documents, records and Yes, FM fulfill times of retention and keep
1.18 reference samples. 10 samples..
Remarks:
Supplier Name & DUNS/SAP No.: Testsupplier, 1234567 Commodity: Plastics & Rubber
Lieferantenname & DUNS/SAP-Nr. Warengruppe
Date of last Evaluation by supplier: Name of SQD & date of last evaluation:
10/ Dec/ 07
Datum der letzten Bewertung durch den Liefer. Name des SQD & Datum der letzten Bewertung:
Further Participant: Mr. Perfect Quality Manager QMPP Compliance by SQD ### %
weiterer Teilnehmer QMPP-Erfüllung (SQD)
S/C and C/C characteristics are marked in all relevant documents (e.g. marked in all P-FMEAs, control plans, work
1.6.1 drawings, FMEAs, control plans)
S/C und C/C-Merkmale sind in allen mitgeltenden Dokumenten (z.B. Zeichnungen,
10 instructions, test and inspection plans, maintenance
FMEAs, Kontrollpläne) zu gekennzeichnet
plan
Cpk/Ppk ≥ 1.33 for S/C and ≥ 1.67 for C/C characteristics are met and
measured regularly, or 100% control exists or a KB released control plan Discuss and release
exists, or batch related material certificates exist Control plan for part number Kxxxxxx not explicitly
control plan by SQD and Jan
1.6.2 Cpk/Ppk-Werte von ≥ 1,33 bei S/C- und ≥ 1,67 bei C/C-Merkmalen werden erreicht 4 released by KB SQD
organize to collect Material 2008
und regelmäßig gemessen oder 100% Prüfung besteht oder ein von KB Material certificates not available for each batch
freigegebener Control PLan existiert oder chargenbezogene Materialzertifikate
certificates for each batch
existieren
Training evidence (signatures per employee) for trainings on S/C and C/C
parts handling exist. S/C and C/C are integrated and visualized in workplace trained immediately and
no training evidence exists, integration into store training signatures. Feb
1.6.5 procedures. 4 workplace procedures is currently on the way Finalize update of 2008
Für alle im Umgang mit S/C- und C/C-Teilen trainierten Mitarbeiter liegen
Trainingsnachweise (Unterschrift pro Mitarbeiter) vor. S/C und C/C sind in workplace procedures
Arbeitsanweisungen integriert und diese sind visualisiert.
Retention periods are met and subcontractors with S/C or C/C parts have All evidence documents are stored in IT system with
1.6.6 been committed on the special retention periods.
Aufbewahrungszeiten sind eingehalten und die Unterlieferanten von S/C oder C/C
10 retention of > 20 years / no subcontractors for S/C-
Teilen wurden auf die speziellen Aufbewahrungszeiten verpflichtet
C/C parts existing
Process audits for all parts with special characteristics are performed yearly plan audits for 2008 and
safety part audits are done but not yearly (reports Q1 /
1.6.7 with an questionnaire considering ISO/TS 16949 and VDA 6.3 requirements
Prozessaudits werden jährlich für alle Teile mit besonderen Merkmalen durchgeführt.
6 from 2006 exist)
update internal audit
2008
Der Fragenkatalog berücksichtigt ISO/TS 16949 und VDA 6.3 Anforderungen
instruction
All modifications to the product and process are documented in a lifetime Production changes are traceable stored in IT- Additional criteria can only
1.7 documentation including the date of the change 6 System but types of changes are not as detailed as be entered into new ERP, 2010
Alle Produkt- oder Prozessänderungen sind in einem Lebenslauf einschließlich des
Änderungszeitpunkts dokumentiert.
required in QMPP planned for 2010
Layout and inspection tests are stipulated in the control plans and are clarify, plan and integrate
1.10 executed accordingly
Requalifikationsprüfungen sind in den Control Plänen enthalten und werden
6 partially implemented into KB relevant control 2008
entsprechend durchgeführt
plans
Parts are processed and delivered following the “first in – first out” principle,
with the batch identified on the box. The batch number must be
1.14 communicated to the KB plant with every delivery. 10 batch identification system is in place
Teile werden nach dem Prinzip „First In – First Out“ mindestens mit
Chargenkennzeichnung am Behälter verarbeitet und geliefert. Die Chargennummer
muss mit jeder Lieferung an das KB Werk kommuniziert werden
Deviating parts are only delivered with released MCR, 8D Report, and
special identification labels on the containers showing the MCR-Number 3 part number with MCR exist but till now without 8D
1.15 Abweichende Teile werden nur mit einem freigegebenen MCR, 8D Report sowie 8 - 8D will be created if required by SQD in furture
speziellen Kennzeichnungen an den Ladungsträgern, die die MCR-Nummer
enthalten, geliefert
Eventual additional customer requirements passed by KB the supplier are no additional customer requirements have been
1.17 implemented n.a. passed til today
Mögliche zusätzliche von KB weitergegebene Kundenforderungen sind umgesetzt
The supplier observes the retention periods for documents, records and
1.18 reference samples
Die Aufbewahrungsfristen sind für Dokumente, Aufzeichnungen und Referenzmuster
10 IT retention system
eingehalten
Remarks: