List Of Drawings General General layout plan of the Project L-section of water conductor system Approach road and

construction plant layout Trench weir Layout Plan of trench weir Trench weir excavation details cross-section and details L-section and details Trench weir R/f details Wing Wall Details Wing wall details R/f Intake Layout plan of intake,sections and details Intake details R/f Feeder Channel Layout plan of feeder channel Feeder Channel Details Feeder channel details Desilting Tank Layout Plan of Desilting Tank Excavation details of Desilting Tank Sections of Desilting Tank L-section of desilting tank Details of desilting tank Desilting tank R/f details Silt flushing details of desilting tank Silt flushing R/f details Power Channel Layout plan & sections of power channel Power channel excavation and details Power channel details Head Race Tunnel HRT-1 layout plan and L-section HRT-1 inlet portal HRT-1 sections and details HRT-1 outlet portal HRT-2 layout plan and L-section HRT-2 inlet portal HRT-2 sections and details HRT-2 outlet portal Forebay Layout plan and sections Forebay excavation details Forebay plan and sections R/f Trashrack goove details

No of Drgs 4 1 1 2 9 1 2 1 1 1 2 1 4 2 2 5 3 1 1 13 1 2 2 1 2 3 1 1 2 0 1 1 10 1 1 2 1 1 1 2 1 13 1 2 2 1

Type of Drg Conc Conc Conc Conc Conc Conc Conc Reinf Conc Reinf Conc Reinf Conc Conc Reinf Conc Conc Conc Conc Conc Reinf Conc Reinf Conc Conc Reinf Conc Conc Conc Conc Conc Conc Conc Conc Conc Conc Reinf Conc

Normal Time Period 9 days 5 days 1 day 3 days 20 days 3 days 3 days 3 days 3 days 3 days 3 days 2 days 5 days 3 days 2 days 4 days 2 days 1 day 1 day 19 days 1 day 3 days 2 days 3 days 3 days 4 days 2 days 1 day 5 days 2 days 2 days 1 day 22 days 2 days 3 days 3 days 3 days 2 days 3 days 3 days 3 days 22 days 2 days 4 days 3 days 2 days

R/f details around trash rack Intake gate details R/f details around intake gate groove Layout plan of escape channel Escape channel details R/f Penstock entry details R/f details aroud penstock entry Penstock Layout plan of Penstock and L-section Anchor block R/f details Saddle support R/f details Penstock bend details Penstock bifurcation details Powerhouse Layout plan of Powerhouse L-section of powerhouse Cross-section of Powerhouse Powerhouse excavation details Powerhouse plan 1st stage concrete Powerhouse 1st stage R/f details Powerhouse plan 2nd stage concrete Powerhouse 2nd stage R/f details Powerhouse details Powerhouse sections and details Powerhouse beam and column details Powerhouse beam and column details Powerhouse EOT beam details EOT beam R/f Powerhouse staircase details Control structure plan and sections Control structure (raft, beam, column and details) Erection bay plan and details Erection bay (raft, beam, column and details) Powerhouse truss details Truss embedments with concrete Switchyard Layout plan of switchyard Switchyard structure details Switchyard structure details Tailrace Channel Layout plan of tailrace L-section and cross section of tailrace Tail race excavation details Tailrace details R/f Total

1 1 1 1 1 1 1 11 2 3 3 2 1 45 1 1 1 2 1 2 3 2 3 4 2 2 2 2 1 3 4 2 2 4 1 9 1 4 4 5 1 1 2 1 130

Reinf Conc Reinf Conc Reinf Conc Reinf Conc Reinf Reinf Conc Conc Conc Conc Conc Conc Conc Reinf Conc Reinf Conc Reinf Conc Reinf Conc Reinf Reinf Conc Reinf Conc Reinf Conc Conc Conc Conc Reinf Conc Conc Conc Reinf

2 days 2 days 1 day 2 days 1 day 2 days 1 day 16 days 5 days 3 days 4 days 3 days 1 day 117 days 2 days 2 days 2 days 3 days 2 days 3 days 4 days 3 days 4 days 6 days 3 days 4 days 3 days 3 days 2 days 4 days 5 days 3 days 3 days 6 days 2 days 13 days 1 day 6 days 6 days 5 days 1 day 1 day 2 days 1 day

no of drgs 126 Mandays