Beruflich Dokumente
Kultur Dokumente
Complete Engineering Solution Provider for Upstream Oil & Gas Industry
www.lntvaldel.com
CONTENTS
Company Background Organisation Chart Business Focus Services Provided Manpower Resources Software Quality System Office Facilities References Project Delivery
BACKGROUND
1991
Established as a joint venture between MSR group and John Brown Engineers & Constructors, UK Kvaerner ASA, Norway acquires John Brown and company becomes part of Kvaerner group
1996
1999
MSR group acquires Kvaerner stake in the company. Retains the John Brown name
2004
Company demerges, L&T aquires 50% stake in Upstream division of Valdel E&C, renamed as L&T-Valdel Engineering Pvt. Ltd.
ORGANIZATION CHART
Board of Directors
Chief Executive
Bhaskar Duttagupta Head - Sales & Marketing K. Madhusudan
Head - Operations Head - Engineering Head - HR & Admin S.N. Palekar R. Sankararaman Sanjay Verma
Process K.V. Chandrasekhar Pipelines Venugopalan P Piping D. Khare Structural M.K. Ghosh Mechanical Janardhana Rao Electrical K. V.Rajendra Prasad Instrumentation Ravi Prakash Administration Team
HR Team
Accounts Team
Marketing Team
Document Control
BUSINESS FOCUS
Oil & Gas Upstream Business Design & Engineering of Offshore Installations such as Wellhead (Fixed Leg) Platforms Process Platforms Sub-sea & Onshore Pipelines Modification/ Renovation of Platforms
SERVICES PROVIDED
The following services are provided Feasibility Study / FEED Project Management Consultancy (PMC) Project Engineering Services (PES) Pre-Bid Engineering Detail Engineering Procurement Assistance Surveys As-built Documentation
MANPOWER RESOURCES
Engineering (213)
Operations (18)
SOFTWARES
Application Software
PV-Elite (Mech.)
HYSYS (Process)
PIPESIM / SMARTPLANT EDSA SACS OFFPIPE INSTRMNTN (Electrical) (Offshore) (Pipelines) (Instrumentation)
HTRI
CYME (Electrical)
2D Drafting
AUTOCAD
MICROSTATION
AUTOPLANT
3D CAD SYSTEMS
PLANT MODELLING
PDMS
PDS - INTERGRAPH
QUALITY SYSTEM
ISO 9001: 2000 Certified Company Certified for ISO 9001:1994 in 1995 Recertified for ISO 9001: 2001 on September 2006 Certification Agency LRQA Surveillance Audit Frequency 6 months
CERTIFICATE OF APPROVAL
OFFICE FACILITIES
Primrose Road office location:- 2 floors, 34,000 sq.ft. floor area and accommodates 350 persons. Church Street office location:- 2 floors, 18,500 sq.ft. floor area and accommodates 250 persons. Both locations are well equipped with Large Conference Rooms with Presentation & Video Conferencing facilities Exclusive Customers review centers Separate Task Force area for major projects In-house, well equipped library Excellent communication network Well organized Document Control & Archiving facility Center for Preservation of Documents.
EXPERIENCE PROFILE
Conceptual & FEED No. of contracts 13 Major contracts PH & PJ wellhead platforms and Submarine Pipelines - A/c Enron (BG India) Ravva satellite gas development project - A/c Cairn Energy Conceptual study of early production facilities - A/c Cairn Energy Exploration in Rajasthan field development A/c Cairn Energy Brown field for Mumbai high south process platform project - A/c ONGC Gauri Field Development Project - A/c Cairn Energy Tapti - Pipavav Subsea Pipelines - A/c GSPL
EXPERIENCE PROFILE
Process platforms Wellhead platforms Platform modification/ revamping Sub-Sea Pipelines (4 to 48)
Clients served ONGC, ENRON (BG-India), Cairn Energy, MDL, L&T, CSL, GESCO, NPCC, J Ray McDermott, SHI, Niko Resources, VMGL, HHI, Clough and Qatar Petroleum.
Facilities Gas compression (1.2 MMSCFD) 20 man LQ bridge connected to HRG platform and flexible flare line to flare tripod. Year : 1998 Platform Details Jacket weight - 1180 MT Pile weight - 1121 MT Topside weight Deck - 395 MT Helideck - 800 MT Deck lift weight - 860 MT
Facilities Second Stage Gas Compression Module 1.2 MMSCFD Year : 2001 Platform Details Weight of compressor Module - 650 MT
PLATFORM DETAILS 6 leg Topside Lift Weight - 1890 MT without modules Production Skid Lift Weight - 420 MT Power Generation Module Lift Weight - 330 MT
YEAR : 2002
Platform Details
Jacket Weight LA - 590 LB - 510 Piles Weight LA - 660 LB - 600 Deck Lift Weight LA - 350 LB - 350
FACILITIES PMC services Location: From Gulf of Cambay approx. 25 KM South West of Surat 15 slot Wellhead Platform & Associated 1 Segment Sub-sea Pipeline
YEAR : 2003
FACILITIES Location: Mumbai High South Field. Services Provided: Detail Engineering Services Procurement Assistance Transportation and Stability Analysis YEAR : 2006 PROJECT DETAILS Raising of the Helideck at SHQ by +4.0 m to 45 m (135 MT) 2nd level Walkway Bridge between SHP & SHQ (30 MT) Upgradation of F&G Detection system Replacement of hardwired EPCS by DCS Providing new MOL Pumps
FACILITIES 12, 30KM Offshore Sale Line 16, 226KM Onshore Trunk Line 3 X 6, 1.5 KM Infield Flow Line PLATFORM DETAILS Carried Out Detailed Engineering of Platforms, Onshore Gas Processing Plant & 226 KM pipeline SONGO SONGO OFFSHORE TRIPOD
YEAR:2003
PROJECT DESCRIPTION Project Project Owner Year : 48 Oil Loading Pipeline Project Location : Adani Port, Gujarat - India : Gujarat Adani Port Limited, India : 2004
SCOPE OF SERVICES 8 km Onshore & 8 km Offshore segments Plem Tie-in Spool Analysis Stability Analysis & Shore Pull Analysis Shore Pull Winch Tie-back Foundation Design Surge Analysis and Recommendations Wall Thickness Verification Floatation Analysis during Trenching Soil Liquefaction and Pipeline Floatation Studies Preliminary Pipeline Lay Analysis PLEM Pile and SBM Anchor Pile Drivability Studies
MANAGEMENT
DOCTRACK
PRIMAVERA
TIMETRACK
The Systems
Norms Management
Estimation Management
BENEFITS
CUSTOM MADE TO SUIT OUR PROCESSES. UNLIMITED LICENSES. SCALABLE SYSTEM INTEGRATION
DOCTRACK
DOCUMENT TRACKING
TRANSMITTALS LETTERS INTER OFFICE MEMOS IDC TRACKING CLIENTS COMMENTS RESOLUTION
MIS
The Systems
RESOURCE PLANNING
together tomorrow
a world of difference
THANK YOU