PRE-AUDIT INPUTS FOR ENERGY AUDIT (BUILDINGS)

1. Site General Details


Facility Name And Address Of The Company H.O

Phone No. Fax No. Email Contact Person Designation Phone Number Email

2. Facility General Details


Built- up Area (Sq. Feet) No of Floors Air conditioned space (Sq. Feet) Sp Energy consumption (KWh/Sq. Feet) (If Known)

2. Electricity
Contract Demand kVA/kW Minimum Billed Demand, 90%,75% Billed Demand, kVA Demand Charges Rs./kVA

Average PF

Monthly kWh/kVAh

Monthly EB Bill

Page

Note - Please attach a copy of your latest electricity bill

3. Load Details
Equipment Name Floor wise Area Transformers (KVA) Chillers (TR) Air Handling Units (AHU) Cooling Towers (CT) Air Conditioners (Split/Window) Package AC Units (Tons) Pumps (KW) Lifts (Kg / Motor KW) Fresh Air/Air Washers DG/TG Sets (kVA) UPS (KVA) Nos. Capacity & Type Remarks Working + Standby

4. Any Specific Problems Being Faced* (Nuisance Electrical Tripping, Frequent Capacitor Failure etc.)

5. If Available, Following Are To Be Attached Along With This Format

Attached 6. Electrical System Distribution Drawing (Single Line Diagram- SLD)

Not Attached

* If necessary and number of equipments are more, please attach annexure.

Larsen & Toubro Limited Electrical & Automation Energy Management


EBG North Wing, Level 4, Gate -7, Powai, Mumbai 400 072 Customer Interaction Center (CIC) Tel: 022 6774 5858 / Fax: 022 6774 5859 E-mail: cic@LNTEBG.com

LARSEN & TOUBRO

Page

PRE-AUDIT INPUTS FOR ENERGY AUDIT (INDUSTRY)


Facility Name And Address Of The Company H.O

Phone No. Fax No. Email Contact Person Designation Phone Number Email

1. Plant General Details


Product / Products Plant Production Capacity % Cost of energy in Cost of production

2. Electricity
Contract Demand, kVA/kW Minimum Billed Demand, 90%/75%,etc Billed Demand, kVA/kW Demand Charges, Rs./kW/kVA

Average Power Factor

Minimum PF Reqd. by SEB

PF Incentives/ Penalty

Monthly SEB Bill

3. Monthly fuel consumption details other than SEB energy


Source Current Year Qty / Units Last Year Qty / Units Landed Cost Per Unit / Lit / kg etc. Major Consumption Points

SEB Elect Own Gen. HSD /LDO Coal/Husk

PNG/LNG/LPG

Page

FO / RFO

4. Load Details
Equipment Name Transformer Fans & Blowers Process Pumps Air Compressor (CFM) Air Conditioning (TR) Cooling Tower (TR) Humidification System DG/TG Sets (kVA) Motors (>7.5 kW) Boilers (Tons) Turbine (MW) Furnace/Oven/Heaters Others, if any Nos. Capacity & Type Motor Rating kW/Fuel Used

5.

Indicate if the facility has any in-house team for energy efficiency, initiated any measures already, if so, provide brief details.

6.

Any Energy Management System / DCS available at the facility, if so furnish details.

7.

Any Specific Problems Being Faced *

Larsen & Toubro Limited Electrical & Automation Energy Management


EBG North Wing, Level 4, Gate -7, Powai, Mumbai 400 072 Customer Interaction Center (CIC) Tel: 022 6774 5858 / Fax: 022 6774 5859 E-mail: cic@LNTEBG.com