3/30/2012
3/30/2012
TO 45 - GARDEZ TK SOV
Activity ID
Activity Name
Budgeted Cost
Previous Period
Cost To Date
Curent Period
Invoice
Total Cost To
Date
Remaining Cost
To Complete
Prevoius %
Complete
Current
Period %
Complete
Current
TOTAL %
Complete
$4,962,058.48
$1,877,394.03
$138,554.21
$2,015,948.21
$2,946,110.27
37.83%
2.79%
40.63%
MOB / DEMOB
$0.00
CM01.38
Mancamp setup
$0.00
CM01.58
Mobilize LSA trailers/dfac to site
$0.00
CM01.28
Demobilization
$0.00
Const. Gen. Requirements - Transient Kandak
$4,962,058.48
Siteworks - Transient Kandak
$279,640.00
Roads
$219,040.00
K01-00590
Interior Perimeter Road at 3.5 meter wide with aggregate
$144,640.00
K01-00650
Internal Road at 3.5 meter wide with aggregate
$54,400.00
K01-00600
Clear/Grub Convoy Assembly Area
$5,000.00
K01-00610
Grade/Compact Convoy Assembly Area
$15,000.00
Interior Chain Link Fencing
$0.00
K01-1080
Clear, Grub, Excavate
$0.00
K01-1090
Install 3.5M Fence
$0.00
K01-1100
Install Sniper Screen
$0.00
Site Preparation
$60,600.00
K01-00045
General site clearing/hauling debris
$7,065.00
K01-00060
Site Layout & Grading
$23,550.00
K01-00055
Site grading to drain storm water
$16,485.00
K01-00105
Construct minimal ditch and road crossing culvert area 1 & aggregates
$1,500.00
K01-00125
Construct minimal ditch and road crossing culvert area 2 & aggregates
$1,500.00
K01-00135
50mm Crushed Stone Walkways
$10,500.00
Utilities - Transient Kandak
$568,701.54
Sanitary Sewer System
$74,017.50
K02-00495
Clear/Grub/Grade/Layout/Excavate Sewer manholes
$3,248.80
K02-00505
Clear/Grub/Grade/Layout/Trench Sewer lines area 1
$5,000.00
K02-00515
Sand bed for Sewer pipes area 1
$3,497.60
K02-00545
Form/Rebar for Manholes
$4,168.30
K02-00645
Clear/Grub/Grade/Layout/Trench Sewer lines area 2
$4,746.40
K02-00545
Concrete/Cure for Manholes
$8,122.00
K02-00555
Lay sewer pipes and fittings area 1
$12,366.00
K02-00535
Sand bed for Sewer pipes area 2
$3,000.00
K02-00525
Backfill/Cover Manholes
$4,061.00
K02-00610
Tie into existing Collection System
$5,685.40
K02-00595
Lay sewer pipes and fittings area 2
$12,000.00
K02-00530
Main sewer line Backfill
$4,061.00
K02-00570
Main sewer line connected to building/utilities/ Test workability
$4,061.00
Power System
$343,631.84
K02-00675
Install transformers(Labor only)
$20,000.00
K02-00740
Consturct Main distribution Panel
$15,800.00
K02-00680
Excavate trench for Low voltage lines to buildings
$25,000.00
K02-00695
Run wire from MDP to Buildings(16 buildings)
$201,031.84
K02-00690
Encase trench wires in concrete
$12,000.00
K02-00700
Backfill trenches to buildings
$35,000.00
K02-00735
Intall grounding system
$13,000.00
K02-00715
Inatall Generator
$0.00
K02-00755
Generator fuel storage
$0.00
K02-01000
Hookup wires to main distribution panel
$10,900.00
K02-01010
Hookup wires to building panels
$10,900.00
Communications System
$126,800.00
K02-00835
Clear/grade and layout
$5,000.00
K02-00855
Trench comm line
$16,800.00
K02-00885
Place PVC conduits including perimeter loop
$45,000.00
K02-00880
Install comm cables and manholes.
$45,000.00
$0.00
$0.00
$0.00
$0.00
$1,877,394.03
$151,216.50
$119,424.00
$86,784.00
$32,640.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$31,792.50
$7,065.00
$16,485.00
$8,242.50
$0.00
$0.00
$0.00
$39,578.69
$33,254.69
$3,248.80
$5,000.00
$3,497.60
$2,709.39
$4,746.40
$0.00
$3,709.80
$1,500.00
$0.00
$0.00
$6,000.00
$812.20
$2,030.50
$3,750.00
$0.00
$0.00
$3,750.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$138,554.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$29,794.89
$18,608.89
$0.00
$0.00
$0.00
$625.24
$0.00
$0.00
$7,419.60
$1,500.00
$0.00
$0.00
$4,800.00
$3,248.80
$1,015.25
$3,750.00
$0.00
$0.00
$3,750.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,015,948.21
$151,216.50
$119,424.00
$86,784.00
$32,640.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$31,792.50
$7,065.00
$16,485.00
$8,242.50
$0.00
$0.00
$0.00
$69,373.59
$51,863.59
$3,248.80
$5,000.00
$3,497.60
$3,334.64
$4,746.40
$0.00
$11,129.40
$3,000.00
$0.00
$0.00
$10,800.00
$4,061.00
$3,045.75
$7,500.00
$0.00
$0.00
$7,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,943,649.99
$128,423.50
$99,616.00
$57,856.00
$21,760.00
$5,000.00
$15,000.00
$0.00
$0.00
$0.00
$0.00
$28,807.50
$0.00
$7,065.00
$8,242.50
$1,500.00
$1,500.00
$10,500.00
$499,327.95
$22,153.91
$0.00
$0.00
$0.00
$833.66
$0.00
$8,122.00
$1,236.60
$0.00
$4,061.00
$5,685.40
$1,200.00
$0.00
$1,015.25
$336,131.84
$20,000.00
$15,800.00
$17,500.00
$201,031.84
$12,000.00
$35,000.00
$13,000.00
$0.00
$0.00
$10,900.00
$10,900.00
$126,800.00
$5,000.00
$16,800.00
$45,000.00
$45,000.00
66%
100%
100%
0%
38%
54%
55%
60%
60%
0%
0%
0%
100%
100%
0%
52%
100%
70%
50%
0%
0%
0%
0%
45%
100%
100%
100%
65%
100%
0%
30%
50%
0%
0%
50%
20%
50%
1%
0%
0%
15%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
25%
0%
0%
0%
15%
0%
0%
60%
50%
0%
0%
40%
80%
25%
1%
0%
0%
15%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
66%
100%
100%
0%
41%
54%
55%
60%
60%
0%
0%
0%
100%
100%
0%
52%
100%
70%
50%
0%
0%
0%
5%
70%
100%
100%
100%
80%
100%
0%
90%
100%
0%
0%
90%
100%
75%
2%
0%
0%
30%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1 of 12
PERCENT
COMPLETE
ACTUAL
START
REMAINING
DURATION
100%
100%
9/3/2011
9/3/2011
60%
60%
0%
10/1/2011
10/1/2011
9/15/2011
100%
100%
9/15/2011
9/15/2011
100%
70%
50%
10/1/2011
10/1/2011
10/1/2011
100%
100%
100%
80%
100%
1/14/2012
1/14/2012
1/26/2012
1/14/2012
1/14/2012
90%
100%
1/14/2012
1/14/2012
90%
100%
75%
1/14/2012
1/14/2012
1/26/2012
ACTUAL
FINISH
9/10/2011
9/10/2011
15
15
9/29/2011
9/29/2011
9/29/2011
11/28/2011
5
5
15
15
30%
115866174.xlsx.ms_office
K02-00845
Backfill Communication Backbone
$15,000.00
Water Distribution and Storage
$24,252.20
AREA 1
$8,155.00
K02-00410
Grade/Layout/Excavate Trench for Dist System area 1
$1,716.00
K02-00415
Sand bed for Distribution Pipes area 1
$1,144.00
K02-00420
Lay water distribution pipes, valves&fittings area 1
$4,580.00
K02-00430
Backfill water distribution lines area 1
$715.00
AREA 2
$7,575.00
K02-00550
Grade/Layout/Excavate Trench for Dist System area 2
$1,716.00
K02-00425
Sand bed for Distribution Pipes area 2
$1,144.00
K02-00480
Lay water distribution pipes, valves&fittings area 2
$4,000.00
K02-00500
Backfill water distribution lines area 2
$715.00
MANHOLES
$5,090.20
K02-00435
Clear/Grade/Layout/Excavate manholes/clean out
$1,144.00
K02-00440
Form/Rebar/Concrete/Cure for manholes/clean out
$2,516.20
K02-00445
Backfill/cover manholes
$1,430.00
TEST, CONNECT & TURNOVER
$3,432.00
K02-00365
Connect Buildings to Exixsting Potable Water Main & Test
$3,432.00
Buildings - Transient Kandak
$4,113,716.94
Life Safety / Fire Protection
$0.00
A1010
Install Fire Alarms & Smoke Detectors
$0.00
A1000
Install Portable Fire Extinguishers
$0.00
BL 101 Senior Officer Barracks
$335,288.16
K03-00365
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$18,000.00
K03-00380
Form/Rebar/ foundation
$16,500.00
K03-00380
Form/Rebar slab on grade
$16,500.00
K03-04500
Sewer & Water U/G Pipes
$12,600.00
K03-04040
Concrete/Cure Bldg foundation
$17,500.00
K03-04040
Concrete/Cure slab on grade
$17,800.00
K03-04040
Foundation Backfill
$5,000.00
K03-00504
Install weld ange iron for K-span
$1,133.61
K03-00505
K-Span Roof intall ( 880 sm)
$28,200.00
K03-00575
K-Span Endwall intall (145 sm)
$4,350.00
K03-02490
form/rebar/concrete/cure curb around building
$9,068.85
K03-00775
Install Ceiling grid square tubes and rebar
$8,076.15
K03-00515
Ceiling insulation
$8,922.77
K03-02615
Sidwall and endwall framing/insulation and gypsum board
$8,922.77
K03-10495
Consttruct sinks with tile work
$1,980.41
K03-10505
Construct laundry sinks with tile work
$1,980.41
K03-00415
Interior Partitions
$23,767.18
K03-00450
Install Doors and Windows
$17,825.95
K03-02625
Install Electrical cable trays
$5,655.56
K03-00435
Install ceiling Grids t-runners
$6,932.00
K03-00460
Electrical conduits and cables
$18,723.67
K03-10970
Above slab water/sewer plumbing fixtures
$3,960.82
K03-10980
Install Plumbing Fixtures
$5,942.36
K03-04510
Water/Sewer connection to main lines
$1,980.41
K03-02605
Install Ceiling tiles
$9,903.18
K03-00495
Install wall mounted heaters and wall mounted fans
$17,825.95
K03-02380
Install Electrical outlets and switches
$1,980.41
K03-12185
Install Electric Water Heaters
$3,960.82
K03-00475
Interior&Exterior lighting/Smoke Detectors/Fire Alarm/Fire Extinguisher $9,394.58
K03-02370
Install ceiling grills, exhaust fans and louvers
$1,980.41
K03-00470
Electrical distribution board
$6,215.56
K03-00425
Epoxy floor finishes
$5,942.36
K03-00485
Disconnect swith connected to main power
$1,980.41
K03-00445
Interior Painting
$9,000.00
K03-00535
Exterior Finish & Landscape
$3,800.00
K03-00540
Site/ Land stabilization
$1,981.54
BL 102 Senior Officer Barracks
$335,288.16
K03-00640
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$18,000.00
K03-00655
Form/Rebar/ foundation
$16,500.00
$0.00
$2,574.00
$1,430.00
$858.00
$572.00
$0.00
$0.00
$1,144.00
$858.00
$286.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,686,598.84
$0.00
$0.00
$0.00
$146,113.20
$18,000.00
$16,500.00
$16,500.00
$12,600.00
$17,500.00
$17,800.00
$5,000.00
$1,133.61
$28,200.00
$4,350.00
$453.44
$8,076.15
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$147,020.08
$18,000.00
$16,500.00
$0.00
$7,436.00
$3,720.00
$858.00
$572.00
$2,290.00
$0.00
$3,716.00
$858.00
$858.00
$2,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$108,759.31
$0.00
$0.00
$0.00
$2,267.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$2,267.21
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,255.08
$0.00
$0.00
2 of 12
$0.00
$10,010.00
$5,150.00
$1,716.00
$1,144.00
$2,290.00
$0.00
$4,860.00
$1,716.00
$1,144.00
$2,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,795,358.12
$0.00
$0.00
$0.00
$148,380.41
$18,000.00
$16,500.00
$16,500.00
$12,600.00
$17,500.00
$17,800.00
$5,000.00
$1,133.61
$28,200.00
$4,350.00
$2,720.65
$8,076.15
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$154,275.16
$18,000.00
$16,500.00
$15,000.00
$14,242.20
$3,005.00
$0.00
$0.00
$2,290.00
$715.00
$2,715.00
$0.00
$0.00
$2,000.00
$715.00
$5,090.20
$1,144.00
$2,516.20
$1,430.00
$3,432.00
$3,432.00
$2,315,898.54
$0.00
$0.00
$0.00
$186,907.75
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6,348.19
$0.00
$8,922.77
$8,922.77
$1,980.41
$1,980.41
$23,767.18
$17,825.95
$5,655.56
$6,932.00
$18,723.67
$3,960.82
$5,942.36
$1,980.41
$9,903.18
$17,825.95
$1,980.41
$3,960.82
$9,394.58
$1,980.41
$6,215.56
$5,942.36
$1,980.41
$9,000.00
$3,800.00
$1,981.54
$181,013.00
$0.00
$0.00
0%
11%
18%
50%
50%
0%
0%
15%
50%
25%
0%
0%
0%
0%
0%
0%
0%
0%
41%
#DIV/0!
0%
0%
44%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
5%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
44%
100%
100%
0%
30%
46%
50%
50%
50%
0%
49%
50%
75%
50%
0%
0%
0%
0%
0%
0%
0%
#DIV/0!
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
25%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2%
0%
0%
0%
41%
63%
100%
100%
50%
0%
64%
100%
100%
50%
0%
0%
0%
0%
0%
0%
0%
44%
#DIV/0!
0%
0%
44%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
30%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
100%
100%
100%
50%
2/24/2012
2/24/2012
100%
100%
50%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
30%
100%
10/1/2011
11/26/2011
11/26/2011
12/10/2011
12/22/2011
12/22/2011
12/22/2011
100% 10/1/2011
100% 11/26/2011
11/28/2011
12/13/2011
12/14/2011
12/14/2011
7
7
11/28/2011
12/13/2011
115866174.xlsx.ms_office
K03-00655
Form/Rebar slab on grade
$16,500.00
K03-04490
Sewer & Water U/G Pipes
$12,600.00
K03-04030
Concrete/Cure Bldg foundation
$17,500.00
K03-04030
Concrete/Cure slab on grade
$17,800.00
K03-04030
Foundation Backfill
$5,000.00
K03-00769
Install weld ange iron for K-span
$1,133.61
K03-00770
K-Span Roof intall ( 880 sm)
$28,200.00
K03-00850
K-Span Endwall intall (145 sm)
$4,350.00
K03-02480
form/rebar/concrete/cure curb around building
$9,068.85
K03-00940
Install Ceiling grid square tubes and rebar
$8,076.15
K03-00780
Ceiling insulation
$8,922.77
K03-02585
Sidwall and endwall framing/insulation and gypsum board
$8,922.77
K03-10475
Construct sinks with tile work
$1,980.41
K03-10485
Construct laundry sinks with tile work
$1,980.41
K03-00690
Interior Partitions
$23,767.18
K03-00720
Install Doors and Windows
$17,825.95
K03-02595
Install Electrical cable trays
$5,655.56
K03-00710
Install Ceiling Grids t-runners
$6,932.00
K03-00730
Electrical conduits and cables
$18,723.67
K03-10950
Above slab water/sewer plumbing fixtures
$3,960.82
K03-10960
Install Plumbing Fixtures
$5,942.36
K03-04480
Water/Sewer connection to main lines
$1,980.41
K03-02575
Install Ceiling tiles
$9,903.18
K03-00765
Install wall mounted heaters and wall mounted fans
$17,825.95
K03-02360
Install Electrical outlets and switches
$1,980.41
K03-12175
Install Electric Water Heaters
$3,960.82
K03-00745
Interior&Exterior lighting/Smoke Detectors/Fire Alarm/Fire Extinguisher $9,394.58
K03-02350
Install ceiling grills, exhaust fans and louvers
$1,980.41
K03-00740
Electrical distribution board
$6,215.56
K03-00700
Epoxy floor finishes
$5,942.36
K03-00755
Disconnect swith connected to main power
$1,980.41
K03-00715
Interior Painting
$9,000.00
K03-00800
Exterior touch up and clean up
$3,800.00
K03-00805
Site/ Land stabilization
$1,981.54
BL 103 Enlisted Barraacks
$312,021.11
K03-00915
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$17,700.00
K03-00930
Form/Rebar Foundation
$10,381.52
K03-00930
Form/Rebar slab on grade
$14,274.59
K03-04020
Concrete/Cure Bldg foundation
$16,500.00
K03-04020
Concrete/CureSlab on Grade
$17,240.00
K03-04020
Backfill Bldg foundation
$4,000.00
K03-01044
Install weld ange iron for K-span
$2,000.00
K03-01045
K-Span Roof intall
$28,200.00
K03-01305
K-Span Endwall intall
$4,350.00
K03-02470
form/rebar/concrete/cure curb around building
$10,941.96
K03-01225
Install Ceiling grid square tubes and rebar
$12,000.00
K03-00965
Interior Partition
$12,904.95
K03-02565
Install Electric cable trays
$5,934.92
K03-01055
Ceiling insulation
$9,217.51
K03-00985
Install Ceiling gric T-runners
$9,217.51
K03-01005
Electrical conduits and cables
$22,122.45
K03-00995
Install Doors and Windows
$18,435.01
K03-02545
Install Ceiling tiles
$12,904.95
K03-02555
Install sidewall and endwall insulation and gypsum board
$14,000.00
K03-01040
Install wall mounted heaters and wall mounted fans
$18,435.01
K03-02340
Install Electrical outlets and switches
$7,940.74
K03-00975
Epoxy floor finishes
$5,530.07
K03-01015
Electrical distribution board
$6,339.77
K03-02330
Install ceiling grills, exhaust fans and louvers
$3,687.44
K03-01020
Interior&Exterior lighting/Smoke Detectors/Fire Alarm/Fire Extinguisher $10,625.00
K03-00990
Interior Painting
$7,000.00
K03-01075
Exterior touch up and clean up
$6,452.47
$16,500.00
$12,600.00
$17,500.00
$17,800.00
$5,000.00
$1,133.61
$28,200.00
$4,350.00
$1,360.33
$8,076.15
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$128,287.40
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$1,641.29
$12,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,255.08
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$16,127.58
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$8,753.57
$0.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
3 of 12
$16,500.00
$12,600.00
$17,500.00
$17,800.00
$5,000.00
$1,133.61
$28,200.00
$4,350.00
$8,615.41
$8,076.15
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$144,414.98
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$10,394.86
$12,000.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$453.44
$0.00
$8,922.77
$8,922.77
$1,980.41
$1,980.41
$23,767.18
$17,825.95
$5,655.56
$6,932.00
$18,723.67
$3,960.82
$5,942.36
$1,980.41
$9,903.18
$17,825.95
$1,980.41
$3,960.82
$9,394.58
$1,980.41
$6,215.56
$5,942.36
$1,980.41
$9,000.00
$3,800.00
$1,981.54
$167,606.13
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$547.10
$0.00
$12,904.95
$5,934.92
$1,843.50
$9,217.51
$22,122.45
$18,435.01
$12,904.95
$14,000.00
$18,435.01
$7,940.74
$5,530.07
$6,339.77
$3,687.44
$10,625.00
$7,000.00
$6,452.47
100%
100%
100%
100%
100%
100%
100%
100%
15%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
41%
100%
100%
100%
100%
100%
100%
100%
100%
100%
15%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
11/26/2011
12/4/2011
12/22/2011
12/22/2011
12/22/2011
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
10/1/2011
11/26/2011
11/26/2011
12/22/2011
12/22/2011
12/22/2011
12/14/2011
12/14/2011
6
6
11/28/2011
12/5/2011
12/14/2011
7
7
80%
115866174.xlsx.ms_office
K03-01030
Disconnect swith connected to main power
$921.31
K03-01080
Site/ Land stabilization
$2,763.94
BL 104 Enlisted Barracks
$312,021.11
K03-01185
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$17,700.00
K03-01200
Form/Rebar Foundation
$10,381.52
K03-01200
Form/Rebar slab on grade
$14,274.59
K03-04010
Concrete/Cure Bldg foundation
$16,500.00
K03-04010
Concrete/CureSlab on Grade
$17,240.00
K03-04010
Backfill Bldg foundation
$4,000.00
K03-01314
Install weld ange iron for K-span
$2,000.00
K03-01315
K-Span Roof intall
$28,200.00
K03-01335
K-Span Endwall intall
$4,350.00
K03-02460
form/rebar/concrete/cure curb around building
$10,941.96
K03-01405
Install Ceiling grid square tubes and rebar
$12,000.00
K03-01235
Interior Partition
$12,904.95
K03-02535
Install Electric cable trays
$5,934.92
K03-01325
Ceiling insulation
$9,217.51
K03-01255
Install Ceiling gric T-runners
$9,217.51
K03-01275
Electrical conduits and cables
$22,122.45
K03-01265
Install Doors and Windows
$18,435.01
K03-02485
Install Ceiling tiles
$12,904.95
K03-02495
Install sidewall and endwall insulation and gypsum board
$14,000.00
K03-01310
Install wall mounted heaters and wall mounted fans
$18,435.01
K03-02320
Install Electrical outlets and switches
$7,940.74
K03-01245
Epoxy floor finishes
$5,530.07
K03-01285
Electrical distribution board
$6,339.77
K03-02310
Install ceiling grills, exhaust fans and louvers
$3,687.44
K03-01290
Interior&Exterior lighting /Smoke Detectors/Fire Alarm/Fire Extinguisher $10,625.00
K03-01260
Interior Painting
$7,000.00
K03-01345
Exterior touch up and clean up
$6,452.47
K03-01300
Disconnect swith connected to main power
$921.31
K03-01350
Site/ Land stabilization
$2,763.94
BL 105 Enlisted Barracks
$312,021.11
K03-01465
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$17,700.00
K03-01480
Form/Rebar foundation
$10,381.52
K03-01480
Form/RebarSlab on Grade
$14,274.59
K03-04000
Concrete/Cure Bldg foundation
$16,500.00
K03-04000
Concrete/CureSlab on Grade
$17,240.00
K03-04000
Backfill Bldg foundation
$4,000.00
K03-01594
Install weld ange iron for K-span
$2,000.00
K03-01595
K-Span Roof intall
$28,200.00
K03-01955
K-Span Endwall intall
$4,350.00
K03-02080
form/rebar/concrete/cure curb around building
$10,941.96
K03-02795
Install Ceiling grid square tubes and rebar
$12,000.00
K03-01515
Interior Partition
$12,904.95
K03-02315
Install Electric cable trays
$5,934.92
K03-01605
Ceiling insulation
$9,217.51
K03-01535
Install Ceiling gric T-runners
$9,217.51
K03-01555
Electrical conduits and cables
$22,122.45
K03-01545
Install Doors and Windows
$18,435.01
K03-02295
Install Ceiling tiles
$12,904.95
K03-02305
Install sidewall and endwall insulation and gypsum board
$14,000.00
K03-01590
Install wall mounted heaters and wall mounted fans
$18,435.01
K03-02260
Install Electrical outlets and switches
$7,940.74
K03-01525
Epoxy floor finishes
$5,530.07
K03-01565
Electrical distribution board
$6,339.77
K03-02250
Install ceiling grills, exhaust fans and louvers
$3,687.44
K03-01570
Interior&Exterior lighting /Smoke Detectors/Fire Alarm/Fire Extinguisher $10,625.00
K03-01540
Interior Painting
$7,000.00
K03-01625
Exterior touch up and clean up
$6,452.47
K03-01580
Disconnect swith connected to main power
$921.31
K03-01630
Site/ Land stabilization
$2,763.94
$0.00
$0.00
$128,287.40
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$1,641.29
$12,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$128,287.40
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$1,641.29
$12,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$16,127.58
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$8,753.57
$0.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$16,127.58
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$8,753.57
$0.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
4 of 12
$0.00
$0.00
$144,414.98
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$10,394.86
$12,000.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$144,414.98
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$10,394.86
$12,000.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$921.31
$2,763.94
$167,606.13
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$547.10
$0.00
$12,904.95
$5,934.92
$1,843.50
$9,217.51
$22,122.45
$18,435.01
$12,904.95
$14,000.00
$18,435.01
$7,940.74
$5,530.07
$6,339.77
$3,687.44
$10,625.00
$7,000.00
$6,452.47
$921.31
$2,763.94
$167,606.13
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$547.10
$0.00
$12,904.95
$5,934.92
$1,843.50
$9,217.51
$22,122.45
$18,435.01
$12,904.95
$14,000.00
$18,435.01
$7,940.74
$5,530.07
$6,339.77
$3,687.44
$10,625.00
$7,000.00
$6,452.47
$921.31
$2,763.94
0%
0%
41%
100%
100%
100%
100%
100%
100%
100%
100%
100%
15%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
41%
100%
100%
100%
100%
100%
100%
100%
100%
100%
15%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
10/1/2011
11/25/2011
11/25/2011
12/22/2011
12/22/2011
12/22/2011
11/28/2011
12/6/2011
12/6/2011
3
3
1/26/2012
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
10/1/2011
11/25/2011
11/25/2011
12/22/2011
12/22/2011
12/22/2011
11/28/2011
12/5/2011
12/5/2011
5
5
3
1/7/2012
1/14/2012
80%
115866174.xlsx.ms_office
$312,021.11
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$129,928.70
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$14,486.28
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$144,414.98
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$167,606.13
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
42%
100%
100%
100%
100%
100%
100%
100%
100%
4%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
100%
100%
100%
100%
100%
100%
100%
K03-01645
K-Span Endwall intall
$4,350.00
K03-02070
form/rebar/concrete/cure curb around building
$10,941.96
K03-02785
Install Ceiling grid square tubes and rebar
$12,000.00
K03-01575
Interior Partition
$12,904.95
K03-02285
Install Electric cable trays
$5,934.92
K03-01715
Ceiling insulation
$9,217.51
K03-01615
Install Ceiling gric T-runners
$9,217.51
K03-01675
Electrical conduits and cables
$22,122.45
K03-01665
Install Doors and Windows
$18,435.01
K03-02265
Install Ceiling tiles
$12,904.95
K03-02275
Install sidewall and endwall insulation and gypsum board
$14,000.00
K03-01610
Install wall mounted heaters and wall mounted fans
$18,435.01
K03-02240
Install Electrical outlets and switches
$7,940.74
K03-01585
Epoxy floor finishes
$5,530.07
K03-01685
Electrical distribution board
$6,339.77
K03-02230
Install ceiling grills, exhaust fans and louvers
$3,687.44
K03-01600
Interior&Exterior lighting /Smoke Detectors/Fire Alarm/Fire Extinguisher $10,625.00
K03-01550
Interior Painting
$7,000.00
K03-01755
Exterior touch up and clean up
$6,452.47
K03-01620
Disconnect swith connected to main power
$921.31
K03-01640
Site/ Land stabilization
$2,763.94
BL 107 Enlisted Barracks
$312,021.11
K03-01745
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$17,700.00
K03-01760
Form/Rebar foundation
$10,381.52
K03-01760
Form/RebarSlab on Grade
$14,274.59
K03-03980
Concrete/Cure Bldg foundation
$16,500.00
K03-03980
Concrete/CureSlab on Grade
$17,240.00
K03-03980
Backfill Bldg foundation
$4,000.00
K03-01874
Install weld ange iron for K-span
$2,000.00
K03-01875
K-Span Roof intall
$28,200.00
K03-01895
K-Span Endwall intall
$4,350.00
K03-02060
form/rebar/concrete/cure curb around building
$10,941.96
K03-02775
Install Ceiling grid square tubes and rebar
$12,000.00
K03-01795
Interior Partition
$12,904.95
K03-02255
Install Electric cable trays
$5,934.92
K03-01885
Ceiling insulation
$9,217.51
K03-01815
Install Ceiling gric T-runners
$9,217.51
K03-01835
Electrical conduits and cables
$22,122.45
K03-01825
Install Doors and Windows
$18,435.01
K03-02235
Install Ceiling tiles
$12,904.95
K03-02245
Install sidewall and endwall insulation and gypsum board
$14,000.00
K03-01870
Install wall mounted heaters and wall mounted fans
$18,435.01
K03-02200
Install Electrical outlets and switches
$7,940.74
K03-01805
Epoxy floor finishes
$5,530.07
K03-01845
Electrical distribution board
$6,339.77
K03-02180
Install ceiling grills, exhaust fans and louvers
$3,687.44
K03-01850
Interior&Exterior lighting /Smoke Detectors/Fire Alarm/Fire Extinguisher $10,625.00
K03-01820
Interior Painting
$7,000.00
K03-01905
Exterior touch up and clean up
$6,452.47
K03-01860
Disconnect swith connected to main power
$921.31
K03-01910
Site/ Land stabilization
$2,763.94
BL 108 Enlisted Barracks
$312,021.11
K03-02025
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$17,700.00
$4,350.00
$3,282.59
$12,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$137,040.97
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$10,394.86
$12,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$137,588.07
$17,700.00
$0.00
$7,112.27
$0.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,921.10
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$547.10
$0.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,374.00
$0.00
$4,350.00
$10,394.86
$12,000.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$144,962.07
$17,700.00
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$10,941.96
$12,000.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$144,962.07
$17,700.00
$0.00
$547.10
$0.00
$12,904.95
$5,934.92
$1,843.50
$9,217.51
$22,122.45
$18,435.01
$12,904.95
$14,000.00
$18,435.01
$7,940.74
$5,530.07
$6,339.77
$3,687.44
$10,625.00
$7,000.00
$6,452.47
$921.31
$2,763.94
$167,059.04
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$12,904.95
$5,934.92
$1,843.50
$9,217.51
$22,122.45
$18,435.01
$12,904.95
$14,000.00
$18,435.01
$7,940.74
$5,530.07
$6,339.77
$3,687.44
$10,625.00
$7,000.00
$6,452.47
$921.31
$2,763.94
$167,059.04
$0.00
100%
30%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
44%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
44%
100%
0%
65%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2%
0%
100%
95%
100%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
5 of 12
100%
100%
100%
100%
100%
100%
100%
100%
10/1/2011
11/25/2011
11/25/2011
12/3/2011
12/3/2011
12/10/2011
100%
95%
100%
1/7/2012
11/28/2011
12/6/2011
12/6/2011
12/10/2011
12/10/2011
5
12/31/2011
80%
100% 10/1/2011
100% 11/1/2011
100% 11/1/2011
100% 12/3/2011
100% 12/3/2011
100% 12/3/2011
100%
100% 12/31/2011
100% 12/31/2011
100%
100%
11/27/2011
11/28/2011
12/6/2011
12/10/2011
12/10/2011
4
80%
100%
10/1/2011
10/27/2011
115866174.xlsx.ms_office
K03-02040
Form/Rebar foundation
$10,381.52
K03-02040
Form/RebarSlab on Grade
$14,274.59
K03-03970
Concrete/Cure Bldg foundation
$16,500.00
K03-03970
Concrete/CureSlab on Grade
$17,240.00
K03-03970
Backfill Bldg foundation
$4,000.00
K03-02154
Install weld ange iron for K-span
$2,000.00
K03-02155
K-Span Roof intall
$28,200.00
K03-02175
K-Span Endwall intall
$4,350.00
K03-02050
form/rebar/concrete/cure curb around building
$10,941.96
K03-02765
Install Ceiling grid square tubes and rebar
$12,000.00
K03-02075
Interior Partition
$12,904.95
K03-02145
Install Electric cable trays
$5,934.92
K03-02165
Ceiling insulation
$9,217.51
K03-02095
Install Ceiling gric T-runners
$9,217.51
K03-02115
Electrical conduits and cables
$22,122.45
K03-02105
Install Doors and Windows
$18,435.01
K03-02135
Install Ceiling tiles
$12,904.95
K03-02225
Install sidewall and endwall insulation and gypsum board
$14,000.00
K03-02150
Install wall mounted heaters and wall mounted fans
$18,435.01
K03-02170
Install Electrical outlets and switches
$7,940.74
K03-02085
Epoxy floor finishes
$5,530.07
K03-02125
Electrical distribution board
$6,339.77
K03-02160
Install ceiling grills, exhaust fans and louvers
$3,687.44
K03-02130
Interior&Exterior lighting /Smoke Detectors/Fire Alarm/Fire Extinguisher $10,625.00
K03-02100
Interior Painting
$7,000.00
K03-02185
Exterior touch up and clean up
$6,452.47
K03-02140
Disconnect swith connected to main power
$921.31
K03-02190
Site/ Land stabilization
$2,763.94
BL 109 Toilet/Showers/Ablution/Laundry
$81,843.37
K03-04075
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$4,650.00
K03-04120
Under Pad water/sewer plumbing
$5,580.00
K03-10015
Form/Rebar foundation
$2,727.35
K03-10015
Form/Rebar slab on grade
$4,091.02
K03-04050
Concrete/Cure Bldg Foundation
$5,000.00
K03-04050
Concrete/Cure Bldg slab on grade
$5,000.00
K03-10034
Install weld ange iron for K-span
$1,000.00
K03-10035
K-Span Roof intall
$6,945.00
K03-10245
K-Span Endwall intall
$1,500.00
K03-02450
Form/rebar/concrete/cure curb around building
$2,915.18
K03-10295
Install Ceiling grid square tubes and rebar
$1,457.59
K03-10345
Interior Partition/CMU work
$5,891.58
K03-02435
Install Electric cable trays
$954.72
K03-10455
Construct sinks and tile work
$1,262.27
K03-10465
Construct laundry sinks and abolutions with tile work
$1,262.27
K03-02455
Ceiling insulation
$1,375.96
K03-02425
Install sidewall and endwall insulation and gypsum board
$2,104.76
K03-00975
Electrical conduits and cables & Fixtures
$4,208.06
K03-02475
Install Doors & Windows
$2,524.55
K03-10870
Above slab water/sewer plumbing fixtures
$954.72
K03-11995
Interior/Exterior light fixtures /Smoke Detectors/Fire Alarm/Fire Extinguisher
$3,149.55
K03-10880
Plumbing fixtures and accessories
$3,058.02
K03-02415
Install Ceiling gypsum board
$3,104.76
K03-12155
Install Electric Water Heaters
$1,262.27
K03-04100
Water/Sewer connection to main lines
$421.24
K03-10075
Epoxy floor finishes
$1,683.52
K03-12165
Install Radiant Heaters and exhaust fans ceiling, louvers
$1,262.27
K03-02300
Install Electrical outlets and switches
$421.24
K03-10075
Interior Painting
$3,132.57
K03-11985
Electrical distribution board
$2,104.76
K03-04140
Power connection to main line
$416.87
K03-10105
Site/ Land stabilization
$421.24
BL 110 Toilet/Showers/Ablution/Laundry
$81,843.37
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$10,941.96
$12,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$41,966.91
$4,650.00
$5,580.00
$2,727.35
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$0.00
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$41,966.91
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$589.16
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$589.16
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$589.16
6 of 12
$10,381.52
$14,274.59
$16,500.00
$17,240.00
$4,000.00
$2,000.00
$28,200.00
$4,350.00
$10,941.96
$12,000.00
$0.00
$0.00
$7,374.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$42,556.07
$4,650.00
$5,580.00
$2,727.35
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$589.16
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$42,556.07
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$12,904.95
$5,934.92
$1,843.50
$9,217.51
$22,122.45
$18,435.01
$12,904.95
$14,000.00
$18,435.01
$7,940.74
$5,530.07
$6,339.77
$3,687.44
$10,625.00
$7,000.00
$6,452.47
$921.31
$2,763.94
$39,287.30
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,302.42
$954.72
$1,262.27
$1,262.27
$275.19
$2,104.76
$4,208.06
$2,524.55
$954.72
$3,149.55
$3,058.02
$3,104.76
$1,262.27
$421.24
$1,683.52
$1,262.27
$421.24
$3,132.57
$2,104.76
$416.87
$421.24
$39,287.30
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
51%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
51%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
10%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
1%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
52%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
10%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
52%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
10/26/2011
10/26/2011
11/26/2011
11/26/2011
12/3/2011
11/28/2011
11/28/2011
12/4/2011
12/4/2011
4
12/31/2011
12/31/2011
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
10%
10/1/2011
12/22/2011
12/22/2011
12/22/2011
12/22/2011
12/22/2011
10
10
10
12/5/2011
1/26/2012
1/26/2012
80%
115866174.xlsx.ms_office
K03-04105
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$4,650.00
K03-04130
Under Pad water/sewer plumbing
$5,580.00
K03-10025
Form/Rebar foundation
$2,727.35
K03-10025
Form/Rebar slab on grade
$4,091.02
K03-04070
Concrete/Cure Bldg Foundation
$5,000.00
K03-04070
Concrete/Cure Bldg slab on grade
$5,000.00
K03-10044
Install weld ange iron for K-span
$1,000.00
K03-10045
K-Span Roof intall
$6,945.00
K03-10235
K-Span Endwall intall
$1,500.00
K03-02120
Form/rebar/concrete/cure curb around building
$2,915.18
K03-10285
Install Ceiling grid square tubes and rebar
$1,457.59
K03-10365
Interior Partition/CMU work
$5,891.58
K03-02405
Install Electric cable trays
$954.72
K03-10435
Construct sinks and tile work
$1,262.27
K03-10445
Construct laundry sinks and abolutions with tile work
$1,262.27
K03-02505
Ceiling insulation
$1,375.96
K03-02395
Install sidewall and endwall insulation and gypsum board
$2,104.76
K03-12005
Electrical conduits and cables & Fixtures
$4,208.06
K03-02465
Install Doors & Windows
$2,524.55
K03-10890
Above slab water/sewer plumbing fixtures
$954.72
K03-12025
Interior/Exterior light fixtures /Smoke Detectors/Fire Alarm/Fire Extinguisher
$3,149.55
K03-10900
Plumbing fixtures and accessories
$3,058.02
K03-02385
Install Ceiling gypsum board
$3,104.76
K03-12135
Install Electric Water Heaters
$1,262.27
K03-04110
Water/Sewer connection to main lines
$421.24
K03-10125
Epoxy floor finishes
$1,683.52
K03-12145
Install Radiant Heaters and exhaust fans ceiling, louvers
$1,262.27
K03-02290
Install Electrical outlets and switches
$421.24
K03-10125
Interior Painting
$3,132.57
K03-12015
Electrical distribution board
$2,104.76
K03-04160
Power connection to main line
$416.87
K03-10135
Site/ Land stabilization
$421.24
BL 111 Arms Storage
$39,100.20
K03-02870
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$2,772.15
K03-02885
Form/Rebar/Concrete/Cure Bldg foundation
$1,996.61
K03-12145
Form/Rebar/Concrete/Cure Bldg slab on grade
$3,048.64
K03-12135
Backfill & Compact Bldg foundation
$2,772.15
K03-02895
Form/Rebar Bldg Column
$0.00
K03-04450
Concrete/Cure Bldg Column
$0.00
K03-02905
Form/Rebar Bldg Beam and Roof Slab
$2,936.14
K03-04460
Concrete/Cure Bldg Beam and Roof Slab
$2,401.86
K03-04470
Install CMU and plastering interior/exterior
$3,764.19
K03-02999
Install/Weld Structural Angle Bar for K-Span
$398.72
K03-03000
Erect K-span Roof Structure
$1,574.13
K03-03020
Erect K-span End Walls
$493.61
K03-03010
Install Insulation
$2,392.29
K03-02920
Install Gun racks
$1,594.86
K03-02960
Electrical conduits and cables
$1,594.86
K03-02970
Electrical Distribution Boards
$1,594.86
K03-02950
Install Doors and Windows
$1,594.86
K03-02975
Interior&Exterior Lighting and Electrical/Smoke Detectors/Fire Alarm/Fire Extinguisher
$3,017.29
K03-02995
Install Wall Mounted Heaters, Exhaust Fans and Louvers
$1,594.86
K03-02400
Install Electrical Outlet and Swithces
$797.43
K03-02945
Interior Paint up and clean up
$797.43
K03-03030
Exterior Paint up and clean up
$797.43
K03-02985
Disconnect switch connected to main power
$398.72
K03-03045
Install Chain Link Fence and Gates
$0.00
K03-03035
Site/Land Stabilization
$767.13
BL 112 Toilets/Showers/Ablution/Laundry
$81,843.37
K03-04115
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$4,650.00
K03-10055
Form/Rebar foundation
$2,727.35
K03-04250
Under Pad water/sewer plumbing
$5,580.00
$4,650.00
$5,580.00
$2,727.35
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$0.00
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6,709.27
$2,772.15
$1,996.61
$0.00
$1,940.51
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$42,556.07
$4,650.00
$2,727.35
$5,580.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$589.16
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$294.58
$0.00
$0.00
$0.00
7 of 12
$4,650.00
$5,580.00
$2,727.35
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$589.16
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6,709.27
$2,772.15
$1,996.61
$0.00
$1,940.51
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$42,850.65
$4,650.00
$2,727.35
$5,580.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,302.42
$954.72
$1,262.27
$1,262.27
$275.19
$2,104.76
$4,208.06
$2,524.55
$954.72
$3,149.55
$3,058.02
$3,104.76
$1,262.27
$421.24
$1,683.52
$1,262.27
$421.24
$3,132.57
$2,104.76
$416.87
$421.24
$32,390.93
$0.00
$0.00
$3,048.64
$831.65
$0.00
$0.00
$2,936.14
$2,401.86
$3,764.19
$398.72
$1,574.13
$493.61
$2,392.29
$1,594.86
$1,594.86
$1,594.86
$1,594.86
$3,017.29
$1,594.86
$797.43
$797.43
$797.43
$398.72
$0.00
$767.13
$38,992.72
$0.00
$0.00
$0.00
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
17%
100%
100%
0%
70%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
52%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
10%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
10%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
17%
100%
100%
0%
70%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
52%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
10%
10/1/2011
12/22/2011
12/22/2011
12/22/2011
12/22/2011
12/22/2011
10
10
12/3/2011
1/14/2012
1/14/2012
80%
100% 10/1/2011
100% 12/22/2011
70%
12/12/2011
1/14/2012
100% 10/1/2011
100% 12/22/2011
100% 11/26/2011
11/28/2011
8
12/6/2011
115866174.xlsx.ms_office
K03-13845
Form/Rebar slab on grade
$4,091.02
K03-10055
Concrete/Cure Bldg Foundation
$5,000.00
K03-10055
Concrete/Cure Bldg slab on grade
$5,000.00
K03-10255
Install weld ange iron for K-span
$1,000.00
K03-10085
K-Span Roof intall
$6,945.00
K03-10225
K-Span Endwall intall
$1,500.00
K03-02110
Form/rebar/concrete/cure curb around building
$2,915.18
K03-10275
Install Ceiling grid square tubes and rebar
$1,457.59
K03-10375
Interior Partition/CMU work
$5,891.58
K03-02375
Install Electric cable trays
$954.72
K03-10415
Construct sinks and tile work
$1,262.27
K03-10425
Construct laundry sinks and abolutions with tile work
$1,262.27
K03-02515
Ceiling insulation
$1,375.96
K03-02365
Install sidewall and endwall insulation and gypsum board
$2,104.76
K03-12035
Electrical conduits and cables & Fixtures
$4,208.06
K03-02445
Install Doors & Windows
$2,524.55
K03-10910
Above slab water/sewer plumbing fixtures
$954.72
K03-12055
Interior/Exterior light fixtures /Smoke Detectors/Fire Alarm/Fire Extinguisher
$3,149.55
K03-10920
Plumbing fixtures and accessories
$3,058.02
K03-02355
Install Ceiling gypsum board
$3,104.76
K03-12115
Install Electric Water Heaters
$1,262.27
K03-04230
Water/Sewer connection to main lines
$421.24
K03-10145
Epoxy floor finishes
$1,683.52
K03-12125
Install Radiant Heaters and exhaust fans ceiling, louvers
$1,262.27
K03-02280
Install Electrical outlets and switches
$421.24
K03-10145
Interior Painting
$3,132.57
K03-12045
Electrical distribution board
$2,104.76
K03-04260
Power connection to main line
$416.87
K03-10155
Site/ Land stabilization
$421.24
BL 112-A Toilets/Showers/Ablution/Laundry
$81,843.37
K03-04125
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$4,650.00
K03-10165
Form/Rebar/Concrete/Cure Bldg foundation
$2,727.35
K03-04340
Under Pad water/sewer plumbing
$5,580.00
K03-04340
Form/Rebar/Concrete/Cure Bldg slab on grade
$4,091.02
K03-04320
Concrete/Cure Bldg Foundation
$5,000.00
K03-04320
Concrete/Cure Bldg slab on grade
$5,000.00
K03-10174
Install weld ange iron for K-span
$1,000.00
K03-10175
K-Span Roof intall
$6,945.00
K03-10215
K-Span Endwall intall
$1,500.00
K03-02090
Form/rebar/concrete/cure curb around building
$2,915.18
K03-10265
Install Ceiling grid square tubes and rebar
$1,457.59
K03-10385
Interior Partition/CMU work
$5,891.58
K03-02345
Install Electric cable trays
$954.72
K03-10395
Construct sinks and tile work
$1,262.27
K03-10405
Construct laundry sinks and abolutions with tile work
$1,262.27
K03-02525
Ceiling insulation
$1,375.96
K03-02335
Install sidewall and endwall insulation and gypsum board
$2,104.76
K03-12065
Electrical conduits and cables & Fixtures
$4,208.06
K03-01995
Install Doors & Windows
$2,524.55
K03-10930
Above slab water/sewer plumbing fixtures
$954.72
K03-12085
Interior/Exterior light fixtures /Smoke Detectors/Fire Alarm/Fire Extinguisher
$3,149.55
K03-10940
Plumbing fixtures and accessories
$3,058.02
K03-02325
Install Ceiling gypsum board
$3,104.76
K03-12095
Install Electric Water Heaters
$1,262.27
K03-04330
Water/Sewer connection to main lines
$421.24
K03-10195
Epoxy floor finishes
$1,683.52
K03-12105
Install Radiant Heaters and exhaust fans ceiling, louvers
$1,262.27
K03-02270
Install Electrical outlets and switches
$421.24
K03-10195
Interior Painting
$3,132.57
K03-12075
Electrical distribution board
$2,104.76
K03-04350
Power connection to main line
$416.87
K03-10205
Site/ Land stabilization
$421.24
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$589.16
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$42,850.65
$4,650.00
$2,727.35
$5,580.00
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$883.74
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$294.58
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
8 of 12
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$883.74
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$42,850.65
$4,650.00
$2,727.35
$5,580.00
$4,091.02
$5,000.00
$5,000.00
$1,000.00
$6,945.00
$1,500.00
$2,915.18
$1,457.59
$883.74
$0.00
$0.00
$0.00
$1,100.77
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,007.84
$954.72
$1,262.27
$1,262.27
$275.19
$2,104.76
$4,208.06
$2,524.55
$954.72
$3,149.55
$3,058.02
$3,104.76
$1,262.27
$421.24
$1,683.52
$1,262.27
$421.24
$3,132.57
$2,104.76
$416.87
$421.24
$38,992.72
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5,007.84
$954.72
$1,262.27
$1,262.27
$275.19
$2,104.76
$4,208.06
$2,524.55
$954.72
$3,149.55
$3,058.02
$3,104.76
$1,262.27
$421.24
$1,683.52
$1,262.27
$421.24
$3,132.57
$2,104.76
$416.87
$421.24
100%
100%
100%
100%
100%
100%
100%
100%
10%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
52%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
15%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
15%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
52%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
15%
0%
0%
0%
80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100% 12/22/2011
100% 12/22/2011
100% 12/22/2011
100%
100% 1/14/2012
100% 1/14/2012
100%
100%
15%
80%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
15%
10/1/2011
11/25/2011
11/25/2011
11/25/2011
12/22/2011
12/22/2011
11/28/2011
12/14/2011
12/12/2011
12/14/2011
7
7
1/14/2012
1/14/2012
80%
115866174.xlsx.ms_office
$167,538.32
$25,955.00
$15,223.30
$24,441.66
$22,500.00
$22,500.00
$5,955.00
$2,313.36
$40,000.00
$8,650.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,400.25
$1,608.75
$5,791.50
$106,006.06
$14,250.00
$8,358.00
$11,492.26
$16,500.00
$16,500.00
$5,100.00
$1,015.80
$26,010.00
$6,780.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$125,945.25
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$11,400.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$11,400.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,200.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,200.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,000.01
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
9 of 12
$178,938.32
$25,955.00
$15,223.30
$24,441.66
$22,500.00
$22,500.00
$5,955.00
$2,313.36
$40,000.00
$8,650.00
$11,400.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,400.25
$1,608.75
$5,791.50
$107,206.06
$14,250.00
$8,358.00
$11,492.26
$16,500.00
$16,500.00
$5,100.00
$1,015.80
$26,010.00
$6,780.00
$0.00
$1,200.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$132,945.25
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$239,748.64
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$600.00
$23,580.55
$35,130.00
$6,910.00
$31,528.00
$25,000.00
$6,065.00
$5,573.00
$15,955.00
$5,783.39
$21,422.09
$9,577.30
$20,000.00
$20,600.00
$9,577.30
$1,000.00
$1,447.00
$8,687.25
$0.00
$8,687.25
$144,119.19
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$29,720.00
$6,800.00
$12,334.19
$10,650.00
$23,500.00
$5,000.00
$20,940.00
$5,550.00
$14,275.00
$9,950.00
$3,000.00
$1,000.00
$1,400.00
$272,244.84
$69,641.00
$12,000.00
$4,000.00
$2,610.00
$10,270.00
$35,000.00
$5,761.00
$14,310.00
40%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
40%
42%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
31%
0%
0%
0%
0%
0%
0%
0%
0%
3%
0%
0%
0%
0%
0%
0%
0%
0%
0%
95%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
15%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2%
0%
0%
0%
0%
0%
0%
0%
0%
43%
100%
100%
100%
100%
100%
100%
100%
100%
100%
95%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
46%
100%
40%
43%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
15%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
33%
0%
0%
0%
0%
0%
0%
0%
0%
100% 10/1/2011
100% 10/26/2011
100% 10/26/2011
100% 12/2/2011
100% 12/2/2011
100% 12/4/2011
100%
100%
100%
95%
100% 11/20/2011
40% 11/26/2011
30
11/28/2011
100%
100%
100%
100%
100%
100%
100%
100%
100%
12/12/2011
10/1/2011
12/22/2011
12/22/2011
12/22/2011
12/22/2011
1/7/2012
10/27/2011
11/28/2011
12/5/2011
12/12/2011
12/12/2011
4
5
5
15%
115866174.xlsx.ms_office
K03-03875
K03-03710
K03-04025
K03-04005
K03-03875
K03-03840
4.21.c BL 118 DFAC
K03-00085
K03-00105
K03-03950
K03-00125
K03-00105
K03-03950
K03-03950
K03-01415
K03-00275
K03-01385
K03-02500
K03-00510
K03-02665
K03-00285
K03-00160
K03-02645
K03-00140
K03-02655
K03-00175
K03-00165
K03-00185
K03-00205
K03-00200
K03-00195
K03-02420
K03-02410
K03-00130
K03-01295
K03-00135
K03-00225
K03-00170
K03-00240
K03-00210
K03-00150
K03-00155
K03-00245
Outdoor Kitchen
K03-00705
K03-00520
K03-00815
K03-01975
Trash collection point
K03-0970
K03-03890
K03-03900
BL 120 Motor Pool
K01-00480
K01-00520
K01-00640
K01-00640
BL 123 Primary ECP
K01-00165
K01-00195
K01-00195
K01-00180
$0.00
$3,000.00
$5,000.00
$5,765.00
$0.00
$545.00
$303,899.37
Layout/Grade/Excavate/Compact Bldg foundation and slab on grade
$980.00
Form/Rebar foundation
$17,482.87
Concrete/Cure Bldg foundation
$18,000.00
Under Pad water/sewer plumbing
$490.00
Form & Rebar Slab on Grade
$16,500.00
Pour & Cure Slab on Grade
$17,500.00
Backfill & Compat Foundation
$735.00
Install weld ange iron for K-span
$1,389.71
K-Span Roof intall
$34,940.00
K-Span Endwall intall
$6,810.00
Form/rebar/concrete/cure curb around building
$11,117.67
Install Ceiling grid square tubes and rebar
$10,000.00
Install sidewall and endwall insulation and gypsum board
$12,000.00
Ceiling Insulation
$12,000.00
Install Ceiling grid T-runners
$5,049.28
Install Ceiling tiles
$6,485.31
Interior Partition/CMU work
$9,264.73
Electrical cable trays
$5,558.84
Install Doors and Windows
$11,117.67
Consstruct Hand Wash station at entry
$2,779.42
Electrical conduits and cables
$18,920.00
Install Wall/Radiant Heaters and wall mounted fans
$10,191.20
Interior & Exterior Lighting /Smoke Detectors/Fire Alarm/Fire Extinguisher
$11,742.67
Electrical distribution board
$7,411.78
Install Electrical outlets and switches
$5,000.00
Install Exhaust Hoods and Fan system Louvers
$7,411.78
Above slab Water plumbing
$5,997.06
Construct Grease Traps
$1,852.95
Plumbing fixtures & Toilets & Hot water heaters
$10,735.00
Refrigerators
$8,936.71
Interior Painting
$3,705.89
Exterior touch up and clean up
$3,705.89
Disconnect swith connected to main power
$1,852.95
Hand wash floor finish
$1,500.00
Epoxy floor finishes
$3,735.00
Site/ Land stabilization
$1,000.00
$15,000.00
Form/Rebar/Pour/Cure Concrete slab on grade
$4,000.00
CMU work
$5,000.00
Set up Burners / Stoves
$5,000.00
Install roof system
$1,000.00
$4,800.00
Form/Rebar/concrete/cure foundation
$617.53
CMU walls with roof
$2,460.28
Interior finishes
$1,722.19
$45,000.00
Clear/Grub Motor Pool
$3,825.00
Grade/Compact Motor Pool
$34,425.00
Install Security chainlink Fence around Motor Pool Area
$6,750.00
Install Trailer Mountd Light Tower / Generator
$0.00
$32,895.10
Clear/Grade/Layout/Excavate Guard house 1 Footings
$1,140.00
Form/Rebar Guard house 1 Foundation
$417.90
Concrete/Cure Guard house 1 Foundation
$3,040.00
CMU for Guard house 1
$4,940.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$125,945.25
$980.00
$17,482.87
$18,000.00
$490.00
$16,500.00
$17,500.00
$735.00
$1,389.71
$34,940.00
$6,810.00
$11,117.67
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$21,037.50
$3,825.00
$17,212.50
$0.00
$0.00
$34.20
$34.20
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,000.01
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$7,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
10 of 12
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$132,945.25
$980.00
$17,482.87
$18,000.00
$490.00
$16,500.00
$17,500.00
$735.00
$1,389.71
$34,940.00
$6,810.00
$11,117.67
$7,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$21,037.50
$3,825.00
$17,212.50
$0.00
$0.00
$34.20
$34.20
$0.00
$0.00
$0.00
$0.00
$3,000.00
$5,000.00
$5,765.00
$0.00
$545.00
$170,954.12
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3,000.00
$12,000.00
$12,000.00
$5,049.28
$6,485.31
$9,264.73
$5,558.84
$11,117.67
$2,779.42
$18,920.00
$10,191.20
$11,742.67
$7,411.78
$5,000.00
$7,411.78
$5,997.06
$1,852.95
$10,735.00
$8,936.71
$3,705.89
$3,705.89
$1,852.95
$1,500.00
$3,735.00
$1,000.00
$15,000.00
$4,000.00
$5,000.00
$5,000.00
$1,000.00
$2,339.72
$617.53
$2,460.28
$1,722.19
$23,962.50
$0.00
$17,212.50
$6,750.00
$0.00
$32,860.90
$1,105.80
$417.90
$3,040.00
$4,940.00
0%
0%
0%
0%
0%
0%
41%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
47%
100%
50%
0%
0%
0%
3%
0%
0%
0%
0%
0%
0%
0%
0%
0%
2%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
70%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
44%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
70%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
47%
100%
50%
0%
0%
0%
3%
0%
0%
0%
100% 10/1/2011
100% 12/31/2011
100%
1/7/2012
100% 12/22/2011
100%
1/7/2012
100%
1/7/2012
100%
100%
100%
100%
100%
70%
100% 10/1/2011
50% 10/26/2011
15
3%
10/1/2011
12/12/2011
5
10/27/2011
15
115866174.xlsx.ms_office
K01-00160
Form/Rebar/Concrete/Cure Guard 1 house roofing
K01-00260
Electrical/Lighting of Guard house 1
K01-00365
Communications System for Guard house
K01-00225
Guard House 1 Finishes
K01-00360
Install heaters&ceiling fans on guard house 1
K01-00540
Elect Dist Board GH 1
K01-00295
Install sermentine Hesco with Razor Wire ECP 1
K01-00305
Install vehicle drop arms GH1
K01-840
Install anti Vehicle Ditch
K01-850
Install serpentine Hesco with Razor Wire
K01-860
Install Perimiter Walls WIth Concertina
BL 126 Secondary ECP
K01-00255
Clear/Grade/Layout/Excavate Guard house 1 Footings
K01-00265
Form/Rebar Guard house 1 Foundation
K01-00265
Concrete/Cure Guard house 1 Foundation
K01-00190
CMU for Guard house 1
K01-00170
Form/Rebar/Concrete/Cure Guard 1 house roofing
K01-00280
Electrical/Lighting of Guard house 1
K01-00365
Communications System for Guard house
K01-00335
Guard House 1 Finishes
K01-00490
Install heaters&ceiling fans on guard house 1
K01-00570
Elect Dist Board GH 1
K01-980
Install sermentine Hesco with Razor Wire ECP 1
K01-00405
Install vehicle drop arms GH1
K01-1000
Install anti Vehicle Ditch
K01-1010
Install Perimiter Walls WIth Concertina
$557.20
$6,080.00
$4,940.00
$4,560.00
$1,900.00
$1,900.00
$0.00
$3,420.00
$0.00
$0.00
$0.00
$32,895.10
$1,140.00
$417.90
$3,040.00
$4,940.00
$557.20
$6,080.00
$4,940.00
$4,560.00
$1,900.00
$1,900.00
$0.00
$3,420.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$34.20
$34.20
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$34.20
$34.20
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$557.20
$6,080.00
$4,940.00
$4,560.00
$1,900.00
$1,900.00
$0.00
$3,420.00
$0.00
$0.00
$0.00
$32,860.90
$1,105.80
$417.90
$3,040.00
$4,940.00
$557.20
$6,080.00
$4,940.00
$4,560.00
$1,900.00
$1,900.00
$0.00
$3,420.00
$0.00
$0.00
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
3%
10/1/2011
15
Reviewed
Paul Parmenter -SAE-LIT
Approved
Jed Parmenter - SAE-LIT
Approved
Jim Devine - ITSI
Approved
Rowal Lacson- ITSI
11 of 12
115866174.xlsx.ms_office
INVOICE NUMBER:
DATE:
PAGE 1 OF 1
SAE-LIT G11TK.18
March 23, 2012
SUBCONTRACTOR
ITSI
SAE-LIT INTERNATIONAL GROUP
KABUL
AFGHANISTAN
BILL TO:
ITSI
TO 45 TRANSIENT
GARDEZ, AFGHANISTAN
ITEM
No.
DESCRIPTION
AMOUNT
01
CONTRACT VALUE
4,962,058.48
02
PROGRESS PAYMENT 01
SEE ATTACHMENT 1 FOR DETAIL
$138,554.21
03
124,698.79
124,698.79
124,698.79
13,855.42
04
05
$1,877,394.03
$2,015,948.21
06
07
$2,946,110.27
INSTRUCTIONS:
YOU ARE KINDLY REQUESTED TO PAY THIS INVOICE
BY WIRE TRANSFER TO THE FOLLOWING ACCOUNT:
NAME OF BANK : CITIZENS BANK
ADDRESS: 2230 Pacific Blvd. SW Albany Or. 97321
Albany, OR 97321-3571
ROUTING NO: 123204013
ACCOUNT NO.: 2377010042
BENEFICIARY: Parco Lumber Inc.
Prepared by:
Paul Parmener