Sie sind auf Seite 1von 8

http://www.crystec.com/alpovere.

htm

I have gone through the resume we will prepare ces on 1. CMP equipment maintenance(CE 1) 2. Thin film related activities (CE 2) 3. Calibration of digital Regulators, pneumatic and chemical control systems (CE 3) When we have to submit this CDR?

Figure 2.1. DSRC supports seven non-overlapping 10MHz channels with the option to join two channels to double the bandwidth.

All applications for development, including demolition, construction and the ongoing use of a site/premises, must be accompanied by a Statement of Environmental Effects (SEE).

Took Charge of ROPP PMV activities in 2008, ensured maximum plants usage at the project peak and

minimum upgrading time by planning and procuring the necessary spare parts for upgrading purpose)

Co-ordinated the availability of equipment with field construction personnel as necessary to carry out the repair works accordingly.

Diagnosed the causes of breakdowns of equipment and explained to his subordinates the procedure to be followed in repairing the faults.

Erected and disassembled all the tower cranes, crawler cranes with fly and luffing jib and ensured their proper safe operation. (Kobelco CKE-2500 II, Kobelco CKE1350, American 9320, HitachiSumitomo SCX1200, Liebherr 200 ECH, etc)

Made decisions about daily work in terms of what is most important & prioritizing activities.

Systematized cranes inspection report (cranes critical items & cranes general items).

Ensured Safe, optimal operation status & full deployment of equipment in conjunction with site requirement & work conditions.

Reviewed and update the plant equipment mobilization bar chart.

Controlled the repair & maintenance of project owned equipment and tools.

Controlled equipment operators and drivers movement , permits and third party certifications (for Eq. operators).

Monitored the frequency of equipment inspection to ensure third party and ISO certification requirements are met and complied with.

Took charge of ROPP PMV activities in 2008, ensured maximum plants usage at the project peak and minimum upgrading time by planning and procuring the necessary spare parts for upgrading purpose)

Today: You will be able to influence people with your co-operative and accomodating attitude today. You will have discussions on various topics with people who come into contact with you. You will also come into contact with people who share the same mental wavelength as you do, says Ganesha.

This Week: Though you will feel very energetic this week, there are too many activities lined up and your priorities are not clear, which means your energies are likely to be scattered in different directions, haphazardly. Ganesha says you will be unsure of whether to lay more emphasis on security or risking some of your resources to make faster progress. You are well aware of the adage: no risk, no gain, so you will in all probability decide to start afresh after abandoning all your current goals. This means there will be dramatic changes in your life. On the personal front, you will avoid getting involved too deeply in any relationship, mainly because you are so busy with other areas of life, and may opt for casual friendships.

This Month: Family issues would continue to be stressful and would require extra efforts on your part. However, as the month progresses, things shall brighten up. You will realise the importance of your family from 23rd onwards. Your optimistic approach towards life may be deeply tested during this time, and you should continue to remain positive. Due to family issues, your health too may come under the scanner. Be careful, says Ganesha. Mercury enters Scorpio and your 5th House on the 5th. A financial drain is foreseen between the 4th and 7th. However, as Venus moves into the money House bringing another positive financial transit, there won't be much trouble. Those in authority shall gain from this planetary activity. This may even result in a pay hike. On the 23rd, the planetary power shifts again to the Western, social sector of your chart, indicating that it's a time to take a vacation with family and friends. Important dates in this month are 1,9,10,11,18 and 28. This Year: The year looks set to be another happy-go-lucky year for Lions, especially till October 2012. Post that as well, there won't be much to worry, assures Ganesha. Expect your health and energy levels to peak, making it possible to do so much all what your fertile imagination may have envisaged. Career success is more or less a surety this year, thanks to the optimistic planet of Jupiter. Your social stars are brilliant, too. All the success and good times will make you confident, and may spur you into taking financial risks. While being aggressive gives you an edge over others, and often tends to bring better gains, being impatient and hasty may lead you into making faulty decisions, cautions Ganesha. Same goes for your love life. It looks set to be tumultuous in the coming time. You may feel emotionally drained or ready to explode. Slow down and first assess what's damaging your relationship or domestic bliss. The reason may be a third party altogether! You

may feel overburdened with responsibilities, but you need to reckon that there are no free lunches in this world, points Ganesha! swetha t is online.

1. Schedule Inspections During the construction process multiple inspections will need to be made on the project.
o

Building: Footing (before the concrete is poured) Foundation (when forms are removed) Rough framing (before framing is covered) Insulation (before drywall is installed) Final To schedule an inspection: Call for inspection request, (608) 266-4551

Plumbing, HVAC, & Electrical: Underground work (before it is covered) Rough (all work in concealed spaces must be visible) Final To schedule an inspection: Call for inspection request, (608) 266-4551

Fire Code Requirements: Rough (all work in concealed spaces must be visible) Hydrostatic tests Flow tests Final tests

Footing A foundation is a structure upon which a building sits that transfers loads from the weight from walls and columns via footings to the earth. This structure on the soil is the footing and the soil under the footing is the foundation. The footing has to be designed to spread the building load over the soil foundation material and is sized to suit the strength of the soil under. Footings are designed in consultation with a structural engineer and will vary depending upon a number of factors:

Weight of building Wall construction type and height Soil type Slope of the block Budget Drainage requirements on the block There are five main types of footings: Strip Footings A Strip Footing is a relatively small strip of concrete placed into a trench and reinforced with steel. The footing supports the load of the exterior walls and any interior wall that is load bearing or supports a slab such as for a bathroom. Strip footings can be used for both traditional timber and concrete floors. They are one of the most common footings used in Australia. Concrete Pad Footings A concrete pad footing is the simplest and cost effective footing used for the vertical support and the transfer of building loads to the ground. These footings are "isolated" i.e. there is no connection between them. They are also reinforced. Holes are dug into the ground and fitted with a reinforcement cage then filed in with a concrete mix to ground level. Concrete pad footings are used to support light weight timber-framed houses. Pole Construction (Post and Concrete) For this type of footing a hole is dug into the ground. A pole is then placed into the hole and ready mixed concrete is back filled around the pole. Pole construction footings are one of the

least expensive footings types especially when constructing a pier/footing on sloping land but engineer's details will be required for the builder and certifying authorities. Grout Injected Piles
General Manager

Sr. Manager Operations

Manager (Medical Division)

Administration
And Finance

Sales

Service

Projects

Asst. Manager (Accounts)

Sales Head

Service Head

Projects Head

Senior Sales Executive Senior Secretary

Kartik Joshi (Myself)

Technician - MGPS

Draftsman Senior Sales Engineer Admin. Supervisor Foreman Technical Coordinator Technician Logistics Helpers Driver Junior Engineer

Wipro GE Healthcare CEO (India) Wipro GE Healthcare CEO (India)

Administration
And Finance

Service

Logistics and OTR

Service President

Zonal Service Manager Service Sales National Management East/west/north/south

LCT leader (Gujarat)

Service sales manger


Karthik Joshi (Myself) Customer Service Engineer

Junior engineer

Mechanical / Civil / Electrical Contractors

Sr. Technician

Where it is impossible for a footing to be constructed, a pile which is both pier and footing is used. This method is only used in unstable or potentially unstable soils such as mud flat estuary areas and beach front. Grout injected piles are "isolated" footings and/or piers, which are cement grouted (not concrete) and steel reinforced. The piers are installed by inserting a cork like screw (Metal Auger) attached to a Backhoe in to the ground. The Auger screws all the dirt out of the pier hole. Once all the dirt is removed the grout is injected through the end of the rotating Auger into the hole. As the hole fills with grout the rotating Auger is slowly removed ensuring no dirt collapses back into the hole. The Auger machine drills out the pier holes with minimal disturbance to adjoining soil and structures.

Project Manager

Construction manager

Project engineer (Software Development Buildings)

Project engineer (Administrative Building, terminal Building)

Site Engineer /QA engineer (My Self)

Das könnte Ihnen auch gefallen