Sie sind auf Seite 1von 5

CURRICULUM VITAE

Market Sectors : -.Re-Condition Parts -.Manufacturing & Fabrication -.Piping & Pipeline -.Storage Tank -.NDT : SOHIDIN WAHYUDANTO Wahyu : Palembang/May 30.1977 : Jln Balap Sepeda Lr Muhajirin VII Rt 29/04 Kel Lorok Pakjo Palembang Sumsel : Moslem : Married : 0813 82175699 : Whyu_danto@Yahoo.co.id

PERSONAL
Name Place/Date of Birth Address Religion Marital Status Phone Number Email

EDUCATIONAL BACKGROUND
1983 - 1989 1989 - 1992 1992 - 1995 1995 - 1998 : SD NEGERI 280 PALEMBANG : SLTP NEGERI 1 PALEMBANG : SLTA NEGERI 2 PALEMBANG : POLYTECHNIC SRIWIJAYA OF UNIVERSITY Majoring Of MECHANICAL ENGINEERING

SKILL OF QUALIFICATION
WELDING INSPECTOR RADIOGRAPHY INTERPRETER SNT Level 2 PNEUMATIC SYSTEM AND APPLICATION : B4T BANDUNG, 2006 Cert.No 0906.12.59.1509 : B4T BANDUNG, 2006 Cert.No 1006.23.0225 : Yayasan Puncak Sari Jakarta, 2000

WORK EXPERIENCE
May 2010 - At Present

: PT MENARA GADING PUTIH


Owner : PT PERTAMINA GAS ( PERTAGAS ) Title Project: Pipeline Looping Gas Transmisi Summary : Simpang Y - PUSRI Diameter 20" x 36 Km As QC Inspector Detail Task -.WPS Qualification Test -.Welder Performance Test -.Inspection material according to standard used project -.Prepare all procedure for welding and inspection -.Prepare formating sistem reporting -.Review Radiography Test Result.

Jan 2010 - April 2010

: PT PUTERA PERDANA SUKSES


Owner : SHANDHONG ELECTRONIC COOPERATION NO 2 Title Project: PLTU 3 BANTEN Summary : Piping/Storage Tank/Mechanical As QA/QC Coordinator Detail Task -.WPS Qualification Test -.Welder Performance Test -.Inspection material according to standard used project -.Visual Inspection for Welding,Painting -.Review Radiography Test Result. -.Making Welding schematic,Welding Control Sheet (WCS) -.Verifikasi mill certificate all material -.Coordinate all Inspector for review report

July 2009 - Jan 2010

: PT SUPPLY CHAININDO SOLUSI


Owner : PT PROMITS INDONESIA Title Project: JARINGAN DISTRIBUSI GAS PALEMBANG Summary : As Pipeline Inspector Detail Task -.Inspection material according to standard used project -.Visual Inspection for Joint Electo & Butt Fusion -.Making Welding schematic -.Verifikasi mill certificate all material And Mat'l Balance

September 2008 - May 2009

: PT RAGA PERKASA EKAGUNA


Owner : CONOCO PHILLIPS OnShore Project PSC,Grissik Sum-Sel Title Project: Gelam Gas Compressor Summary : As Piping Inspector Detail Task -.WPS Qualification Test ( Duplex,Stainless Steel,Carbon Steel ) -.Welder Performance Test -.Inspection material according to standard used project -.Visual Inspection for Welding,Painting -.Review Radiography Test Result. -.Making Welding schematic,Welding Control Sheet (WCS) -.Verifikasi mill certificate all material

May 2007 - July 2008

: PT YASA INDUSTRY NUSANTARA


Owner : CONOCO PHILLIPS OnShore Project PSC,Grissik Sum-Sel Title Project: Maintenance Summary : Dec 2007 - Feb 2008, QC Coordinator Head Office As QC Inspector Detail Task -.Prepare all document support job for M/C package -.Review of Welder Qualification Certificate -.Inspection material according to standard used -.Visual Inspection for Welding -.Making request RT after welding & review radiography film -.Monitor for Hydrotest -.Making Welding schematic,Welding Control Sheet (WCS)

May 2007 - Nov 2007, QC Coordinator Head 6" Ramba-Kaji 12 km Title Project: Pipeline Office As Pipeline Inspector Detail Task -. Prepare of procedure ( Such as : Welding,Treching Lower-In,Backfill,Coating,Holiday Test,Field Bend & Hydro test ). -.Review of Welder Qualification Certificate -.Inspection material according to standard used project -.Visual Inspection for Welding,Treching,Lower-In,Backfill, Joint Coating,Holiday Test. -.Making report for daily welding,trenching,lower-in,backfill, Joint Coating,Holiday Test. -.Review Radiography Test Result. -.Making Welding schematic,Welding Control Sheet (WCS) -.Prepare mill certificate all material for submitted PJIT October 2006 - May 2007

: PT KARYA MANDIRI MAKMUR SEJATI


Summary : Feb 2007 - May 2007, QC Engineering Details Task -.Prepare and updating project Quality Plan in consulting with Engineering,Production,Procurement,HRD&PC Dept Head -.Review project dedicate WPS & PQR -.Review of Welder Qualification Test -.Review of material certificate and material verification -.Review of electrode/welding consumable -.Coordinate activities of QC Inspector and NDE Inspector -.Review of NDE Procedure -.Review of Radiography film result -.Review the Inspection report Document ( Such as : Material traceability record,Dimension Inspection report, Visual Inspection report,Penetrant/Magnetic particle Test report,Utrasonic Test report,Radiography Test report) Oct 2006 - Feb 2007, QC/Welding Inspector overhoul Gas Turbin 2.2 Repair Casing Combuster crack problem On Site PT PEMBANGKITAN JAWA - BALI Muara Tawar Bekasi,Jawa Barat Details Task -.Review and check specification & procedure -.Review WPS & PQR according with std are used according to with standard,ASME sect IX, Acceptance criteria with ASME sect VIII. - Review of Welder qualification certificate - Witness of Welder qualification test - Monitor preheat temp,interpass temp every pass -.Manage welding technique & maintain progress welding -.Visual Inspection -.Review result ultrasonic test & Penetrant Test

March 2002 - January 2006

: PT GRAND DINAMIKA MANUFACTURING INDONESIA


As Quality Control Supervisor Summary : February 2005 - January 2006 As Quality Control Supervisor -.Responsibility for incoming raw material production line & Outgoing -.Making report problem and presentation problem production -.Analytic high problem component weld special product -.Make sure customer for good product presentation June 2003 - January 2005 As Production Supervisor -.Responsibility for line production to achievement rate -.Making daily/weekly/monthly report for achievement rate -.Trouble shooting problem in production March 2002 - May 2003 As Production Control Staff -.Monitoring data entry result production -.Keep data for daily report production

August 1999 - February 2002

: PT MITRASETYA ERA REKAYASA


As Technical Quality Control Summary : July 2001 - February 2002 As Technical Quality Control -.Analytic operasional function machine -.Making report deviation function machine August 1999 - June 2001 As Mechanical Drafter & Designer -.Making drawing assembly machine -.Making draft lay-out for presentation project

OTHER SKILL
Computer -.Excellent operational with AUTOCAD 2D/3D -.Application Windows XP -.Understanding mechanical drawing standard -.Familiar with mechanical drawing -.Manufacturing proses production -.Good ability communication and interpersonal skill

Technical Knowledge

FAMILIAR CODE & STANDARD


-.ASME Section IX ( Welding & Brazing Qualification ) -.ASME Section V ( Non destructive Examination ) -.ASME Section VIII ( Pressure Vessel ) -.ASME B31.1 ( Power Piping ) -.ASME B31.3 ( Process Piping ) -.AWS D1.1 ( Sructural Welding Code Steel ) -.API 650 ( Storage Tank ) -.API 1104 ( Welding of Pipelines and Related Fasilities ) -.API Spec 5L ( Material Specifications )

Sincerely Yours,

Sohidin Wahyudanto

Das könnte Ihnen auch gefallen