B31 Case 167 U e of Mechanically Applied Composite Material Wrap for Pipeline Repairs, B31.4 s
Approval Date: April 1997
This case shall expireon April 30, 2000, unless previously annulled or reaffirmed
Inquiry: Under what conditions may mechanically appliedcompositematerialwrap be used forpipeline repairscovered bypara.451.6.2(b)?
Reply: It is the opinion of the committee that if itisnotpracticaltotakethepipelineoutofservice, be repaired the by nonleaking corroded may areas installation of a mechanically applied composite material wrapusedtoreinforcethepipeline.Mechanicallyappliedcompositematerialwrap may be usedprovided that design and installation methods are proven for the intendedservice.Theuseriscautionedthatawritten is qualifiedprocedureperformedbytrainedpersonnel a requirement, the and record shall be retained in accordance withpara.455.