P.E.S ENGINEERS PRIVATE LIMITED. TEHRI PSP, Camp Office: V.K.

Puram, Koti Colony, New Tehri, Uttrakhand Project: Tehri PSP, Tehri garhwal, Uttrakhand. Description of work : Report on feasibility to transport the pressure shaft steel liners in the existing adits . Date of servey made : 23.11.2012. Size of the consignment to be transported : 6680 mm dia x 2500 mm width. Mode of transport : Through 2516 truck ( 10 Tyre truck ) Required tunnel size for transportation : 8000 mm D Shape tunnel. Below are the observations made. Sl. No 1 Streatch From To Approach to Lower PAC From Portal at Adit- 9 Link Adit 8

Observations

Requirements Widening should be done if any hindrance occurs obstructing transportaion of steel liners. Widening should be done if any hindrance occurs obstructing transportaion of steel liners. Widening should be done if any hindrance occurs obstructing transportaion of steel liners. Widening should be done if any hindrance occurs obstructing transportaion of steel liners.

The transportation of steel liner can be done except in few areas which need widening if required. The transportation of steel liner can be done except in few areas which need widening if required.

Junction at Link Adit 8

Junction at Adit-8

Junction at Adit-8

Junction at Adit-AA7 The transportation of steel liner can be done except in few areas which need widening if required. Existing Spot as on 23.11.12 The transportation of steel liner can be done except in few areas which need widening if required.

Junction at Adit-AA7

Approach to Upper PAC & Upper Horizontal Portion Although the tunnel size is meeting the requirement, the size of the tunnel is minimized due to the Link Adit-1-3 (Way to pipelines(Fire fighting & Cooling water) laid on both the HRT 3&4) sides of the tunnel also two ventilation ducts have been installed in the overhead. Hence, transporting the steel liners through this adit is not possible. Either the transportation shall be carried out through some other adjoing tunnel or the installed ventilation ducts and pipe lines has to be dismantelled.

Portal at Adit-1

Link Adit-1-3 (Way to HRT 3&4)

Widening should be done if any hindrance Junction at HRT 3 & 4 The size of tunnels wherever ribs have been provided is occurs obstructing transportaion of steel only 7 mtrs instead of 8 mtrs. liners.

Junction at HRT 3 & 4

Existing Spot as on 23.11.12

Widening should be done if any hindrance The size of tunnels wherever ribs have been provided is occurs obstructing transportaion of steel only 7 mtrs instead of 8 mtrs. liners.

Remarks

Refer Drg. Existing Adit1 for present size of tunnel and photographs.

Refer Drg. Existing Adit1 for present size of tunnel and photographs.