CONTENTS

GROUP
MEMBERS........................................................
.......... 4
MISSION STATEMENT
.......................................................... 5
MAIN OBJECTIVE
.................................................................. 5
REPORT OVERVIEW
.............................................................. 5
SUB SYSTEM
OVERVIEW......................................................
5
TOP LEVEL
REQUIREMENTS..............................................
5
TOP LEVEL
REQUIREMENTS..............................................
6
SUB-SYSTEM OVERVIEW
..................................................... 7
INDIVIDUAL SUBSYSTEMS:
STRUCTURE SUBSYSTEM
.................................................... 8
PAYLOAD.........................................................
....................... 10
POWER SUB-SYSTEM
.......................................................... 12
THERMAL CONTROL SUB-SYSTEM
................................. 15

1
GROUND STATION AND TELEMETRY SUBSYSTEM
17
COMMAND AND DATA HANDLING SUB-SYSTEM
........ 19
ATTITUDE DETERMINATION AND CONTROL
.............. 21
INTERFACING OF COMPONENTS:
THERMAL SUB-SYSTEM……………………………..
…....24
STRUCTURAL SUB-
SYSTEM............................................... 25
POWER SUB-SYSTEM
.......................................................... 26
TELEMETRY SUB-
SYSTEM................................................. 27
ATTITUDE C&D SUB-
SYSTEM........................................... 28
PAYLOAD SUB-SYSTEM
......................................................29
PROCESSOR....................................................
....................... 30
REFERENCES:
......................................................................
32

2
GROUP MEMBERS
Names Position in Team NTTS

Ahmad Usman: Project Manager


Khalid Shaikh: Assistant Project Manager
Abid Anwar: Payload
Naveed Shoukat: Onboard Computer and Data
handling
Asad Abbass Sangi: Telemetry and Communication
Haider Ali: Power and Electrical Distribution
System

3
Mission Statement
Main objective

Report Overview

Sub System overview

4
Top Level Requirements
Technical Requirement:
(the cubesat shall be: )
Functional Requirements:
Automated
All top-level requirements are guidelines to which all sub-systems
adhere to. For more detailed requirements of how these top-tier
requirements shall/should be achieved, refer to section 3 for the
specific sub-system requirements.)
Design Considerations:

5
Sub-System Overview
Structures:
Payload:
Power:
Thermal:
Telemetry and command:
Data handling:
Attitude:

STRUCTURE SUBSYSTEM
Objective:

6
Technical Requirements:

Functional Requirements:

7
Payload
Technical Requirements:
Over All Functional Requirements:

Design Options:

8
POWER SUB-SYSTEM
Power Requirements
Objective:
To provide enough power to run the various electrical components
onboard the cubesat for a minimum period of 6 months.
Overview:

9
functional

Functional requirements:
Power collection:
Power storage:
Power distribution:

Thermal Control Sub-system


Primary Requirements:

10
External Factors:

Orbital Heat Loads at typical LEO

Internal factors:

11
Ground Station and Telemetry Subsystem
Functional requirements
O
O
Technical requirements

COMMAND AND DATA HANDLING SUB-SYSTEM


Introduction
Functional specifications:

12
Technical specifications:

ATTITUDE DETERMINATION AND CONTROL


1 Introduction:
2 Subsystem Objectives:
3 Requirements and Specifications:

13
3.1 Technical Requirements:

3.2 Functional Requirements:

14
4. Possible Problems:
5. Linkage to overall requirements:
THERMAL SUB-SYSTEM

Processor:
Structure:
Power:

15
STRUCTURAL SUB-SYSTEM

Processor:
Thermal:
Power:
Telemetry:
Internal sub-systems:
Payload:

POWER SUB-SYSTEM

16
Processor:
Payload:
Thermal:
Structure:
Attitude control and determination:
Telemetry:
TELEMETRY SUB-SYSTEM

17
Processor:
Ground Station:
Power:
Structure:

ATTITUDE C&D SUB-SYSTEM

Power:
Processor:

18
PAYLOAD SUB-SYSTEM

Processor:
Power:
Structure:

19
PROCESSOR

Thermal:
Structure:
Power:
Telemetry:
Attitude C & D:

Payload:

20
References:
Thermal:
Telemetry:
C&DH:
Power:
Cubesat 2002 CDR
Design and Test of a Solid State Charged Particle Detector for Cubesat
Power generation and distribution
Self-Steering Antennas for Cubesat Networks
URL:
Structure:
Payload:
ACDS:

21