Beruflich Dokumente
Kultur Dokumente
Items
Qualit
y
I
I.1
I.2
I.3
Turbine-generator foundation (2
foundations)
I.4
I.5
I.6
II
III
III.1
III.2
IV
Length
Party
4
Total
5
Width
Depth
Boiler
foundation
(2
foundations), calculated quality
for 1 Foundation
Stack
Main transformer and aux.
transformer foundations
HV swithyard
XD.6.1-1
Area
Party
8
Volume
Total
9
Party
10
Total
11
Synthesix
Unit
12
13
IV.1
IV.2
Control
house
treatment
(demineralization)
for
water
system
4
4
2
4
VI.3
V
V.1
V.3
V.4
V.5
V.2
tank
XD.6.1-2
10
11
12
13
V.6
V.7
Equalization tank
V.8
VI.4
VI.5
VI.6
VII
VII.1
VII.2
Ash discharge
house
VII.3
VI
VI.1
VI.2
VI.3
system
66.30
control
XD.6.1-3
10
11
12
13
VII.4
VII.5
VII.6
Return water
(circulation)
VII.7
pump
station
VIII
Cooling water system
VIII.1 Cooling water pump station
VIII.2 Cooling water piping system
VIII.3 Cooling water discharge system
VIII.4 Chlorine house
IX
IX.1
IX.2
FO storage
IX.3
X
X.1
XD.6.1-4
10
11
12
13
X.2
X.3
Car garage
X.4
X.5
XI
XI.1
Storage, workshop
Bulldozer garage
XI.2
Warehouse
XI.3
XII
XII.1
Infrastructure
Green plants
XII.2
Pathway
XII.3
XD.6.1-5
10
11
12
13
No
1
Code
Item
Unit
Quantity
Applied
price
1m3
25,500
kg
cng
1.5
2.02
17,000
69,936
ca
ca
1m3
1.05
0.23
86,447
244,198
kg
cng
1.2
0.72
ca
ca
ca
ca
Material
141,271
54,028
XD.6.2-6
64,833
90,769
56,166
457,717
20,400
54,028
0.35
92,128
0.18
745,661
0.23
244,198
0.111 2,117,904
1.31
10
146,935
141,271
32,245
134,219
56,166
235,087
84,932
cng
Machine
25,500
20,400
17,000
75,039
Total
Labour
level
9
84,932
4
5
6
AB.11443
AB.13113
AB.24132
AB.24133
AB.25123
AB.25343
10
97,898
cng
1.51
64,833
cng
0.7
64,833
100m3
cng
ca
ca
42,142
0.65
64,833
ca
ca
64,833
ca
64,833
XD.6.2-7
865,459
484,953
0.321 2,696,134
100m3
cng
617,415
63,912
484,953
7.48
681,326
52,515
0.229 2,696,134
0.045 1,420,258
100m3
cng
533,835
51,129
52,515
0.81
584,964
42,142
0.198 2,696,134
0.036 1,420,258
100m3
cng
97,898
45,383
45,383
865,459
125,776 1,017,697
1.94
64,833
125,776
10
11
12
13
AB.25424
AB.25443
AB.31133
AB.41423
- Excavator <=2,3m3
- Bulldozer <=110CV
Dig foundation > 20m by excavator
<=1,25m3, fourth degree soil
Labour level of 3/7
Machine:
- Excavator <=1,25m3
- Bulldozer <=110CV
Dig foundation >20m by excavator
<=2,3m3, third degree soil
Labour level of 3/7
Machine:
- Excavator <=2,3m3
- Bulldozer <=110CV
Dig road foundation by excavator
<=1,25m3, Bulldozer <=110CV, third
degree soil
Labour level of 3/7
Machine:
- Excavator <=1,25m3
- Bulldozer <=110CV
Soil transporation by 7T rear-dump
lorry, distance <=1000m
-7 tons lorry
ca
ca
ca
ca
2.72
64,833
ca
ca
0.208 4,395,325
0.045 1,420,258
64,833
100m3
986,785
76,694
5.79
64,833
0.307 2,696,134
0.068 1,420,258
978,139
113,977
914,228
63,912
375,384
100m3
XD.6.2-8
176,346
113,977
1.758
ca
953,786
63,912
0.366 2,696,134
0.054 1,420,258
cng
ca
ca
10
176,346 1,063,479
100m3
cng
0.217 4,395,325
0.045 1,420,258
100m3
cng
924,291
375,384
827,713
96,578
1,335,287
1.2 1,112,739
1,335,287
14
15
16
17
18
100m3
ca
534,115
0.48 1,112,739
534,115
100m3
ca
430,008
0.28 1,535,742
100m3
cng
ca
ca
ca
ca
1.48
64,833
ca
ca
XD.6.2-9
226,998
147,707
95,953
1.48
64,833
390,220
257,067
95,953
64,833
0.4 1,080,943
0.182 1,420,258
647,287
95,953
0.361 1,080,943
0.181 1,420,258
1.48
374,705
95,953
0.21 1,080,943
0.104 1,420,258
100m3
cng
430,008
95,953
100m3
cng
10
690,864
95,953
432,377
258,487
19
20
21
22
100m3
cng
ca
10.18
75,039
5.09
149,296
763,899
763,899
ca
349,681 1,590,689
5
69,936
349,681
1.12 1,420,258
1,590,689
100m3
cng
ca
ca
ca
ca
ca
ca
%
276,979 5,227,803
4.45
62,242
XD.6.2-10
276,979
0.107 44,898,454
0.107
735,698
0.025 3,889,428
0.053
245,575
0.107
735,698
0.107
735,698
1.50%
100m3
759,917
759,917
100m3
cng
10
4,804,135
78,720
97,236
13,015
78,720
78,720
77,258
0
101
358,074 7,077,163
23
24
- Other
Labour level of 3,5/7
Machine:
- Pile hammer
- Other machine
Concrete pile sinking on first degree
soil by machine hammer,hammer's
AC.15114
weight <=2,5T, pile's dimension of
40x40, pile lenght<=24m
Material:
- Concrete pile
- Other
Labour level of 3,5/7
Machine:
- Pile hammer
- Other machine
Concrete pile sinking on first degree
soil by machine hammer,hammer's
AC.15221
weight <=2,5T, pile's dimension of
25x25, pile length>24m
Material:
- Concrete pile
- Other
Labour level of 3,5/7
Machine:
- Pile hammer
%
cng
1.50%
5.12
69,936
ca
%
2.3 2,902,856
6.00%
m
%
cng
101
1.50%
7.32
ca
%
3.3 2,902,856
6.00%
XD.6.2-11
6,676,569
400,594
511,933
9,579,425
574,765
0
0
69,936
2.12 2,902,856
511,933 10,154,190
0
0
69,936
100m3
ca
358,074
101
1.50%
4.8
10
100m3
m
%
cng
335,694 6,523,298
0
0
335,694
6,154,055
25
26
27
- Other machine
Concrete pile sinking on second
degree
soil
by
machine
AC.15222 hammer,hammer's weight <=2,5T,
pile's dimension of 30x30, pile
length>24m
Material:
- Concrete pile
- Other
Labour level of 3,5/7
Machine:
- Pile hammer
- Other machine
Press conrete pile on land, pile lengh
AC.22112
<=12m
Material:
Labour level 4/7
Machine
- Pile compressor 1.8T
- Other machine
Press conrete pile under water, pile
AC.22212
lengh <=12m
Material:
- Steel sheet pile
- Other material
Labour level 4/7
6.00%
m
%
cng
101
1.50%
5.28
ca
%
2.55 2,902,856
6.00%
0
69,936
100m
ca
%
XD.6.2-12
369,263 7,846,420
0
0
369,263
7,402,283
444,137
915,479 8,274,986
12.20
75,039
915,479
4.09 1,964,295
3.00%
100m
cng
10
369,243
100m3
cng
8,033,967
241,019
1,519,544 42,125,135
20.25
75,039
1,519,544
28
29
Machine
- Pile compressor 1.8T
- Crane 25T
- Towboat 150CV
- Barge 200T
- Other machine
Press concrete pile, pile length >4m,
AC.26221
second degree soil
Material:
- Concrete pile
- Other
Labour level of 3,7/7
Machine
- Pile compressor >150T
- Crane 10T
- Other machine
AC.29331 Prolong square concrete pile, 30x30
Material:
- Conner iron 80x80mm
- Welding rod
- Other
Labour level of 4/7
Machine:
- Welding machine 23kW
- Other machine
ca
ca
ca
ca
%
7.56 1,964,295
7.56 2,791,539
0.13 2,251,914
7.56
615,256
3.00%
100m3
10
14,850,070
21,104,035
292,749
4,651,335
1,226,946
0 1,590,701 10,096,041
m
%
cng
101
1.00%
22.1
ca
ca
%
1mi ni
4.4
538,626
4.4 1,689,097
3.00%
kg
kg
%
cng
12.16
2.13
3.00%
0.77
9,915
17,000
ca
%
0.15
3.00%
244,198
XD.6.2-13
0
0
71,977
1,590,701
161,480
75,039
2,369,954
7,432,027
294,059
57,780
37,729
120,566
36,210
4,703
57,780
36,630
1,099
30
31
1m
364,283
ci
kg
%
cng
1.4
0.42
2.00%
2.1
ca
ca
%
0.025 5,039,017
0.025 3,119,868
5.00%
250,000
17,000
ca
%
XD.6.2-14
0.108 5,039,017
10.00%
157,582
10
214,171
157,582
125,975
77,997
10,199
316,455
0.0012 14,000,000
1.15
250,000
0.35
17,000
2.00%
1.68
75,039
350,000
7,140
7,143
75,039
1m
ci
ci
kg
%
cng
126,066
598,635
16,800
287,500
5,950
6,205
126,066
544,214
54,421
32
33
Drill soil underwater by driller TRCAC.32211 15 (or equivalent), bore hole diameter
D800
Material:
- Alloy bucket tooth
- Welding rod
- Other
Labour level of 4/7
Machine
- Driller
- Crane 30T
- Barge 400T
- Barge 200T
- Towboat 150CV
- Other machine
Drill soil underwater by driller TRCAC.32213 15 (or equivalent), bore hole diameter
D1200
Material:
- Alloy bucket tooth
- Welding rod
- Other
Labour level of 4/7
Machine
- Driller
- Crane 30T
1m
364,283
ci
kg
%
cng
1.4
0.42
2.00%
3.15
ca
ca
ca
ca
ca
%
0.03 5,039,017
0.03 3,119,868
0.03
927,369
0.03
615,256
0.02 2,251,914
5.00%
250,000
17,000
ca
ca
XD.6.2-15
250,000
17,000
75,039
0.039 5,039,017
0.039 3,119,868
236,374
10
352,888
236,374
151,171
93,596
27,821
18,458
45,038
16,804
468,364
1.8
0.54
2.00%
3.81
350,000
7,140
7,143
75,039
1m
ci
kg
%
cng
285,899
468,212
450,000
9,180
9,184
285,899
196,522
121,675
34
35
- Barge 400T
- Barge 200T
- Towboat 150CV
- Other machine
Pump
Bentonite
solution
for
AC.32810 protection of bore hole depression on
land
Material:
- Bentonit
- CMC additive
- Water
- Other
Labour level of 4/7
Machine
- Solution mixer
- Shake screen
- Pump 200m3/h
- Other machine
Pump
Bentonite
solution
for
AC.32820 protection of bore hole depression
underwater
Material:
- Bentonit
- CMC additive
- Water
- Other
ca
ca
ca
%
39.26
1.91
0.67
2.00%
0.58
ca
ca
ca
%
0.05
0.05
0.05
2.00%
6,325
7,618
4,500
206,396
322,575
477,520
6,325
7,618
4,500
51,331
43,523
10,320
16,129
23,876
1,006
271,202
39.26
1.91
0.67
2.00%
43,523
248,320
14,550
3,015
5,318
75,039
1m3
10
36,167
23,995
67,557
22,296
271,202
kg
kg
m3
%
cng
XD.6.2-16
0.039
927,369
0.039
615,256
0.03 2,251,914
5.00%
1m3
kg
kg
m3
%
248,320
14,550
3,015
5,318
48,025
669,418
36
37
cng
ca
ca
ca
ca
ca
%
0.64
75,039
48,025
0.55
206,396
0.55
322,575
0.55
477,520
0.12
615,256
0.01 2,251,914
3.00%
1m
113,518
177,416
262,636
73,831
22,519
19,498
101,046
kg
kg
%
cng
ca
ca
ca
ca
ca
%
3.97
1.2
10.00%
4.05
18,000
17,000
303,909
303,909
0.075 1,689,097
0.075 3,119,868
0.69
244,198
0.075
750,837
0.075
927,369
2.00%
kg
XD.6.2-17
233,990
168,497
56,313
69,553
10,567
46,200
1.20
18,000
538,919
71,460
20,400
9,186
75,039
1m
10
21,600
243,127
50,456
38
39
kg
- Welding rod
- Other
cng
Labour level of 4/7
Machine
ca
- Crane 25T
ca
- Vibrating hammer BP 170
%
- Other machine
Construction foundation, rubble
AD.11120
1m3
stone, thickness <=20cm
Material:
m3
- Stone
cng
Labour level of 3/7
Machine
ca
- Roller 8,5T
Construct upper foundation for new
AD.11222
100m3
road
Material:
m3
- Macadam 0,075-50mm
cng
Labour level of 4/7
Machine
ca
- Spreader 50-60 m3/h
ca
- Vibrating roller 25T
ca
- Roller 16T
ca
- Roller 10T
ca
- car for water spray 5m3
%
- Other machine
XD.6.2-18
1.20
0.10
3.24
17,000
20,400
4,200
75,039
243,127
0.064 2,791,539
0.064
750,837
5.00%
48,054
2,403
108,000
1.2
0.56
90,000
64,833
0.009
940,257
0.21
0.21
0.42
0.21
0.21
0.50%
8,462
36,307
8,462
240,000 34,080,000
75,039
3,056,863
1,504,490
1,205,093
1,105,500
726,250
36,307
108,000
34,080,000
142
4.4
10
330,173 1,857,934
330,173
641,941
315,943
506,139
232,155
152,513
9,243
40
41
42
43
1m3
m3
m3
m3
cng
350,344
1.2
0.057
0.42
1.84
90,000
80,000
566,152
69,936
1m3
m3
m3
m3
cng
1.2
0.057
0.42
2.19
90,000
80,000
566,152
69,936
900
566,152
69,936
1m3
vin
m3
%
XD.6.2-19
900
566,152
128,683
153,160
108,000
4,560
237,784
153,160
116,794
495,000
164,184
116,794
692,143
550
0.29
5.00%
10
128,683
659,184
550
0.29
1.67
108,000
4,560
237,784
350,344
1m3
vin
m3
cng
495,000
164,184
32,959
134,278
3,295
44
45
46
cng
ca
1.92
69,936
0.036
91,524
1m3
550
0.29
6.00%
1.97
900
566,152
ca
ca
%
0.036
0.04
0.50%
91,524
195,003
ca
ca
650,230
64,833
0.095
0.089
129,029
80,103
1m3
m3
XD.6.2-20
729,700
11,150
137,774
3,295
7,800
55
92,063
19,387
669,737
92,063
12,258
7,129
751,591
1.03
137,774
495,000
164,184
39,551
669,737
1.03
1.42
10
3,295
69,936
1m3
134,278
698,735
vin
m3
%
cng
m3
cng
751,591
76,503
19,387
47
48
49
50
AF.11315
+TT2
AF.11315
+TT3
AF.11413
AF.27116
cng
ca
ca
1.18
64,833
0.095
0.089
129,029
80,103
10
76,503
12,258
7,129
1m3
m3
%
1.03
#N/A
0.50%
1m3
m3
%
958,787
1.03
0.50%
926,230
1m3
1.025
1.00%
2.41
809,000
ca
ca
1m3
0.095
0.089
129,029
82,484
XD.6.2-21
19,599
156,248
19,599
954,017
4,770
837,517
m3
%
cng
156,248
829,225
8,292
64,833
156,248
848,249
266,389
12,258
7,341
332,852
51
52
m3
- Mortar M350
%
- Other
cng
Labour level of 4/7
Machine
ca
- Crane 50T
ca
- Compactor 1,5kW
- Water pump 20kW (for concrete
ca
maintenance)
ca
- Lift 3T
%
- Other
AF.27316 Stack concrete, M350
1m3
Material:
m3
- Mortar M350
%
- Other
cng
Labour level of 4/7
Machine
ca
- Crane 50T
ca
- Compactor 1,5kW
- Water pump 20kW (for concrete
ca
maintenance)
ca
- Lift 3T
%
- Other
Foundation concrete M300, width
AF.31115
1m3
<=250
Material:
m3
- Mortar M300
XD.6.2-22
1.025
2.00%
3.55
811,333
10
831,616
16,632
75,039
266,389
0.065 4,402,364
0.2
82,484
286,154
16,497
0.05
154,768
7,738
0.025
5.00%
264,529
6,613
15,850
381,782
848,249
1.025
2.00%
4.55
811,333
341,429
831,616
16,632
75,039
341,429
0.075 4,402,364
0.25
82,484
330,177
20,621
0.04
154,768
6,191
0.025
5.00%
264,529
6,613
18,180
949,525
1.015
926,230
940,123
55,108
106,192
53
54
%
- Other
cng
Labour level of 3/7
Machine
ca
- Pump BT 50m3/h
ca
- Compactor 1,5kW
%
- Other
Foundation concrete M150, width >
AF.31122
1m3
250
Material:
m3
- Mortar M150
m3
- Plank
kg
- Nail
ci
- Hooked nail
%
- Other
cng
Labour level of 3/7
Machine
ca
- Pump BT 50m3/h
ca
- Compactor 1,5kW
%
- Other machine
Foundation concrete M300, width >
AF.31125
1m3
250
Material:
m3
- Mortar M300
m3
- Plank
kg
- Nail
ci
- Hooked nail
XD.6.2-23
1.00%
0.85
64,833
10
9,401
55,108
0.033 2,963,631
0.089
82,484
1.00%
97,800
7,341
1,051
784,594
1.015
729,700
0.015 2,240,000
0.122
10,350
0.603
2,185
1.00%
1.21
64,833
78,448
740,646
33,600
1,263
1,318
7,768
78,448
0.033 2,963,631
0.089
82,484
1.00%
97,800
7,341
1,051
986,067
1.015
926,230
0.015 2,240,000
0.122
10,350
0.603
2,185
106,192
940,123
33,600
1,263
1,318
78,448
106,192
55
56
57
58
AF.31213
AF.31214
+TT
AF.31215
AF.31325
- Other
Labour level of 3/7
Machine
- Pump BT 50m3/h
- Vibrator cylinder 1.5 kW
- Other machine
Foundation concrete M200
Material:
- Mortar M200
- Other
Labour level of 3/7
Machine
- Pump BT 50m3/h
- Compactor 1kW
- Other machine
Steel net concrete for foundation,
M250
Material:
- Mortar M250
- Water proof layer, Sika Membane
- Other
Foundation concrete M300
Material:
- Mortar M300
- Other
Concrete of machine platform M300
%
cng
1.00%
829,323
m3
%
cng
1.025
1.00%
0.62
ca
ca
%
0.033 2,963,631
0.089
80,103
1.00%
809,000
m3
%
1m3
XD.6.2-24
1.025
1.00%
10
899,560
21,174
926,230
40,197
105,978
829,225
98
64,833
1m3
1.025
12
1.00%
9,763
ca
ca
%
1m3
m3
kg
%
40,197
97,800
7,129
1,049
1,187,900
40,197
105,978
922,049
254,089
11,761
949,503
40,197
105,978
949,386
118
949,525
106,326
106,192
59
60
Material:
- Mortar M300
- Other
Labour level of 3/7
Machine
- Pump BT 50m3/h
- Compactor 1,5kW
- Other machine
AF.32115 Wall concrete M300, <= 4m
Material:
- Mortar M300
- Plank
- Nail
- Hooked nail
- Other
Labour level of 3,5/7
Machine
- Pump BT 50m3/h
- Compactor 1,5kW
- Other machine
AF.32125 Wall concrete M300, <= 16m
Material:
- Mortar M300
- Plank
- Nail
- Hooked nail
m3
%
cng
1.015
1.00%
1.64
ca
ca
%
1m3
0.033 2,963,631
0.089
82,484
1.00%
m3
m3
kg
ci
%
cng
1.015
720,130
0.049 2,240,000
0.199
10,350
0.871
2,185
2.00%
2.56
69,936
ca
ca
%
1m3
0.033 2,963,631
0.18
82,484
1.00%
m3
m3
kg
ci
1.015
720,130
0.049 2,240,000
0.199
10,350
0.871
2,185
XD.6.2-25
926,230
10
940,123
9,401
64,833
106,326
861,548
179,037
97,800
7,341
1,051
113,773
730,932
109,760
2,060
1,903
16,893
179,037
861,548
730,932
109,760
2,060
1,903
225,195
97,800
14,847
1,126
113,773
- Other
Labour level of 3,5/7
Machine
- Pump BT 50m3/h
- Compactor 1,5kW
- Other machine
61
62
AF.32126
Wall concrete M350, <= 16m
+TT3
Material:
- Mortar M300 mixed with hardener
- Plank
- Nail
- Hooked nail
- Other
Pile concrete M300, pile section
AF.32235
>0,1m, height <=4m
Material:
- Mortar M300
- Plank
- Nail
- Hooked nail
- Other
Labour level of 3,5/7
Machine
- Pump BT 50m3/h
- Compactor 1,5kW
%
cng
2.00%
3.22
69,936
ca
ca
%
0.033 2,963,631
0.18
82,484
1.00%
ca
ca
XD.6.2-26
10
225,195
97,800
14,847
1,126
955,970
1.015
811,333
0.049 2,240,000
0.199
10,350
0.871
2,185
2.00%
1m3
m3
m3
kg
ci
%
cng
16,893
1m3
m3
m3
kg
ci
%
0.033 2,963,631
0.2
82,484
113,773
212,606
115,440
823,503
109,760
2,060
1,903
18,745
784,768
1.015
720,130
0.02 2,240,000
0.048
10,350
0.352
2,185
1.00%
3.04
69,936
225,195
730,932
44,800
497
769
7,770
212,606
97,800
16,497
63
64
65
- Other machine
Pile concrete M300, pile section
AF.32245
>0,1m, height <=16m
Material:
- Mortar M300
- Plank
- Nail
- Hooked nail
- Other
Labour level of 3,5/7
Machine
- Pump BT 50m3/h
- Compactor 1,5kW
- Other machine
Concrete for beam, bracing, roof's
AF.32315
floor, M300
Material:
- Mortar M300
- Other
Labour level of 3,5/7
Machine
- Pump BT 50m3/h
- Compactor 1,5kW
- Other machine
Concrete for the roof of water
AF.34211
channel, M100
10
1,143
784,768
m3
m3
kg
ci
%
cng
1.015
720,130
0.02 2,240,000
0.048
10,350
0.352
2,185
1.00%
0.33
69,936
ca
ca
%
0.033 2,963,631
0.2
82,484
1.00%
1m3
1.015
1.00%
2.56
720,130
ca
ca
%
0.033 2,963,631
0.18
82,484
1.00%
23,079
115,440
730,932
44,800
497
769
7,770
23,079
97,800
16,497
1,143
738,241
m3
%
cng
XD.6.2-27
1.00%
1m3
1m3
179,037
113,773
730,932
7,309
69,936
179,037
97,800
14,847
1,126
676,434
135,071
113,773
66
67
68
Material:
- Mortar M100
- Other
Labour level of 4/7
Machine
- Pump BT 50m3/h
- Compactor 1,5kW
- Other machine
Concrete for the roof of water
AF.34213
channel, M200
Material:
- Mortar M200
- Other
Pile concrete, M300 on land, pile
AF.35115
diameter <=1000
Material:
- Mortar M300
- Pipe f300
- Other
Labour level of 3,5/7
Machine
- Crane 25T
- Pump BT 50m3/h
- Other
AF.41326 Pier concrete, M350 thickness <=1m
Material:
m3
%
cng
1.03
1.00%
1.8
650,230
ca
ca
%
0.033 2,963,631
0.18
82,484
1.00%
809,000
1m3
1.15
0.012
1.20%
1.1
ca
ca
%
1m3
0.079 2,791,539
0.079 2,963,631
2.00%
XD.6.2-28
97,800
14,847
1,126
926,230
402,500
135,071
113,773
76,930
463,752
833,270
8,333
1,082,834
m3
m
%
cng
10
135,071
841,603
1.03
1.00%
669,737
6,697
75,039
1m3
m3
%
1,065,165
4,830
12,840
69,936
76,930
886,459
199,738
220,532
234,127
9,093
72,031
69
70
- Mortar M350
- Plank
- Nails
- Hooked Nails
- Other
Labour level of 3,5/7
Machine
- Crane 16T
- Compactor 1,5kW
Floor concrete, thickness >=30cm,
AF.41776
M350
Material:
- Mortar M350
- Other
Labour level of 3,5/7
Machine
- Crane 16T
- Compactor 1,5kW
Production of concrete mortar by
AF.51110
mixing plant, capacity <=16 m3/h
Labour level of 3/7
Machine
- Mixing plant 16m3/h
- Shovel 1,25m3
- Bulldozer 110CV
- Other
m3
m3
kg
ci
%
cng
ca
ca
1.025
811,333
0.02 2,240,000
0.048
10,350
0.352
2,185
1.00%
2.856
69,936
ca
ca
1.025
1.00%
1.58
811,333
69,936
ca
ca
ca
%
XD.6.2-29
199,738
57,183
14,847
110,499
110,499
52,948
14,847
7,132
64,833
0.02
995,800
0.02 1,514,333
0.01 1,420,258
5.00%
67,795
831,616
8,316
0.025 2,117,904
0.18
82,484
0.11
10
831,616
44,800
497
769
8,777
839,933
1m3
cng
0.027 2,117,904
0.18
82,484
1m3
m3
%
cng
67,626
7,132
19,916
30,287
14,203
3,220
71
AF.51160
72
73
74
75
76
77
78
79
80
AF.52161
0.056
64,833
XD.6.2-30
10
3,631
34,967
3,631
0.0037 6,526,550
0.0037 1,514,333
0.0025 1,420,258
5.00%
24,148
5,603
3,551
1,665
Machine
ca
- car
Transport concrete mortar by car
AF.52351
100m3/km
10T distance <=3km
Machine
ca
- car
Reinforce steel production and
installation
AF.61110
AF.61120
AF.61130
AF.61311
AF.61312
AF.61321
AF.61322
8,478,554
5.93 1,429,773
8,478,554
5,779,011
4.32 1,337,734
5,779,011
18,978,488
18,696,206
18,707,426
18,696,206
18,978,488
18,696,206
18,696,206
791,678
34,537
583,268
991,625
444,095
991,626
781,188
991,624
853,222 1,608,168
781,188
991,624
853,222 1,608,168
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
AF.61331
AF.61332
AF.61411
AF.61413
AF.61421
AF.61423
AF.61431
AF.61433
AF.61511
AF.61513
AF.61521
AF.61523
AF.61531
AF.61533
AF.61613
AF.61623
AF.61711
AF.61713
AF.61721
AF.61723
AF.61731
AF.61813
AF.61823
AF.62110
AF.62120
AF.62130
XD.6.2-31
10
18,707,426
18,707,426
18,978,488
18,978,488
18,696,206
18,696,206
18,722,726
18,722,726
18,978,488
18,978,488
18,697,226
18,697,226
18,720,006
18,720,006
18,978,488
18,695,815
18,978,488
18,978,488
18,695,815
18,695,815
636,420
712,650
1,040,651
1,173,530
700,761
712,650
593,059
681,179
1,132,967
1,274,937
702,160
800,770
636,420
706,356
1,700,849
1,442,784
1,023,167
1,177,027
763,004
1,177,726
310,131
1,576,635
34,537
125,461
283,270
1,086,654
363,855
1,077,631
34,537
125,461
276,676
1,086,654
355,552
1,077,631
125,461
991,624
35,228
155,538
315,858
439,667
18,978,488
18,695,815
19,007,920
18,421,160
18,414,380
1,423,902
1,108,489
1,167,610
1,013,030
170,351
123,001
398,134
170,351
462,111
485,976
107
108
109
110
111
112
113
AF.62310
AF.62320
AF.62330
AF.67110
AF.67120
AF.67210
AF.67220
114
AF.81111
115
116
10
19,007,920 1,313,187
156,210
18,421,160 1,125,588
502,726
18,414,380 900,471
406,733
18,778,826 922,983
969,279
18,795,826 810,424
988,598
18,778,826 1,015,281 1,472,314
18,795,826 891,466 1,455,028
100m2
m3
m3
m3
kg
%
cng
3,151,402
0.792 2,240,000
0.0865 2,240,000
0.459 2,240,000
12
10,350
1.00%
13.61
69,936
100m2
m3
m3
m3
kg
%
cng
100m2
XD.6.2-32
951,832
1,774,080
193,760
1,028,160
124,200
31,202
951,832
3,407,871 2,230,966
0.792 2,240,000
0.149 2,240,000
0.496 2,240,000
15
10,350
1.00%
31.9
69,936
1,774,080
333,760
1,111,040
155,250
33,741
2,230,966
4,533,912 2,404,408
117
118
- Plank
- Plank for cover
- Plank for support
- Nail
- Other
Labour level of 3,5/7
Concrete formwork of wall, thickness
AF.81311
<=45
- Plank
- Plank for cover
- Plank for support
- Nail
- Other
Labour level of 3,5/7
Concrete formwork of wall, thickness
AF.81312
> 45
- Plank
- Plank for cover
- Plank for support
- Bolt M16
- Nail
- Hooked nail
- Steel wire
- Turnbuckle F14
- Other
Labour level of 4/7
m3
m3
m3
kg
%
cng
0.792 2,240,000
0.189 2,240,000
0.957 2,240,000
14.29
10,350
1.00%
34.38
69,936
100m2
m3
m3
m3
kg
%
cng
XD.6.2-33
1,774,080
423,360
2,143,680
147,902
44,890
2,404,408
3,192,539 1,942,828
0.792 2,240,000
0.19 2,240,000
0.357 2,240,000
17.13
10,350
0.50%
27.78
69,936
100m2
m3
m3
m3
ci
kg
ci
kg
ci
%
cng
1,774,080
425,600
799,680
177,296
15,883
1,942,828
1,819,256 2,447,029
0.792 2,240,000
0.19 2,240,000
0.455 2,240,000
2.6
1,835
4.6
10,350
10.26
2,185
11.4
18,020
5.1
11,500
1.00%
32.61
75,039
1,774,080
425,600
1,019,200
4,772
47,610
22,418
205,428
58,650
35,578
2,447,029
10
119
120
100m2
3,168,837 2,872,502
kg
kg
m3
kg
%
cng
51.81
18,000
48.84
18,000
0.496 2,240,000
5.6
17,000
5.00%
38.28
75,039
ca
ca
%
1.5
0.25
2.00%
51.81
40.7
36.5
5.00%
20
18,000
18,000
12,075
ca
%
0.25
2.00%
195,003
81,058
423,349
2,872,502
366,297
48,751
8,301
2,211,213 1,621,163
kg
kg
kg
%
cng
10
932,580
879,120
1,111,040
95,200
150,897
244,198
195,003
100m2
XD.6.2-34
49,726
932,580
732,600
440,738
105,296
1,621,163
48,751
975
121
AF.86121
122
123
XD.6.2-35
2,211,213 1,823,808
51.81
40.7
36.5
5.00%
22.5
18,000
18,000
12,075
1,823,808
0.25
441,316
0.25 2,507,471
2.00%
110,329
626,868
14,744
2,390,417 2,310,157
18,000
18,000
12,075
0.25
2.00%
195,003
81,058
751,941
932,580
732,600
440,738
105,296
81,058
51.81
48.84
38.5
5.00%
28.5
10
49,726
932,580
879,120
464,888
113,829
2,310,157
48,751
975
2,236,571 2,431,745
751,941
125
kg
- Plate steel
kg
- Steel bar
kg
- Support by steel pipe
%
- Other
cng
Labour level of 4,5/7
Machine
ca
- Lift 3T
ca
- Crane 25T
%
- Other
Concrete of beam, bracing, height
AF.86321
100m2
<=50
Material:
kg
- Plate steel
kg
- Steel bar
kg
- Support by steel pipe
%
- Other
cng
Labour level of 4,5/7
Machine
ca
- Lift 3T
ca
- Crane 25T
%
- Other
AF.86411 Slide formwork for lift well
100m2
126
100m2
127
1m3
124
XD.6.2-36
51.81
40.7
38.5
5.00%
30
18,000
18,000
12,075
932,580
732,600
464,888
106,503
81,058
2,431,745
0.25
441,316
0.25 2,507,471
2.00%
110,329
626,868
14,744
2,255,589 2,026,454
51.81
40.7
40
5.00%
25
18,000
18,000
12,075
751,941
932,580
732,600
483,000
107,409
81,058
0.25
441,316
0.25 2,507,471
2.00%
10
2,026,454
110,329
626,868
14,744
2,945,955 4,005,546 6,209,684
4,022,759 5,660,010 6,909,137
825,241
118,645
29,815
128
129
130
Material:
m3
- Mortar M200
%
- Other
cng
Labour level of 3/7
Machine
ca
- Mixer 250l
ca
- Compactor 1,5kW
%
- Other
AG.11115 Pile concrete, M300
1m3
Material:
m3
- Mortar M300
%
- Other
Concrete for slab, lintel, fence, etc.,
AG.11413
1m3
M200
Material:
m3
- Mortar M200
%
- Other
cng
Labour level of 3/7
Machine
ca
- Mixer 250l
AG.31121 Pile formwork
100m2
Material:
m3
- Plank
m3
- Plank for cover
kg
- Nail
%
- Other
XD.6.2-37
1.015
0.50%
1.83
809,000
0.095
0.18
10.00%
129,029
82,484
64,833
926,230
118,645
646,550
0.095
129,029
118,645
12,258
14,847
2,710
29,815
166,621
12,258
940,123
4,701
659,529
1.015
0.50%
2.57
656,248
3,281
64,833
166,621
12,258
295,708 1,861,362
0.083 2,240,000
0.0015 2,240,000
10
10,350
1.00%
10
821,135
4,106
944,824
1.015
0.50%
185,920
3,360
103,500
2,928
131
132
133
cng
28.71
64,833
1 ci
m3
%
cng
1 tn
0.005 14,629,392
10.00%
0.25
75,039
860
169
1.72
8.16
20.89
5.00%
32.571
ca
ca
ca
%
1 tn
3.47
244,198
0.43
118,980
0.43 1,689,097
1.00%
XD.6.2-38
879
150
1.59
10
1,861,362
80,462
kg
kg
chai
kg
kg
%
cng
kg
kg
chai
18,760
73,147
7,315
18,760
20,027,879 2,444,103 1,641,089
18,000 15,480,000
18,000 3,042,000
60,000
103,200
11,500
93,840
17,000
355,130
953,709
75,039
2,444,103
847,367
51,161
726,312
16,248
19,960,444 2,130,664 1,419,613
18,000 15,822,000
18,000 2,700,000
60,000
95,400
134
135
- calcium carbide
- Welding rod
- Other
Labour level of 4/7
Machine
- Welding machine 23kW
- Driller 4,5kW
- Crane 10T
- Other
AI.11131 Steel bar pile
Material:
- Steel bar
- Plate steel
- Oxygen
- calcium carbide
- Welding rod
- Other
Labour level of 4/7
Machine
- Welding machine 23kW
- Cutting machine
- Driller 4,5kW
- Crane 16T
- Other
AI.11132 Plate steel pile
Steel bar pile
kg
kg
%
cng
7.276
18.169
5.00%
28.394
11,500
17,000
ca
ca
ca
%
1 tn
3.14
244,198
0.4
118,980
0.35 1,689,097
1.00%
kg
kg
chai
kg
kg
%
cng
1005
16
1.59
6.5
6.5
5.00%
9.5
ca
ca
ca
ca
%
1 tn
1.2
244,198
0.5
99,461
1.5
118,980
0.32 2,117,904
5.00%
XD.6.2-39
10
83,674
308,873
950,497
75,039
2,130,664
19,591,583
18,000 18,090,000
18,000
288,000
60,000
95,400
11,500
74,750
17,000
110,500
932,933
75,039
766,782
47,592
591,184
14,056
712,873 1,258,916
712,873
293,038
49,731
178,470
677,729
59,948
20,351,520 1,388,226 2,491,173
136
137
Material:
- Steel bar
- Plate steel
- Oxygen
- calcium carbide
- Welding rod
- Other
Labour level of 4/7
Machine
- Welding machine 23kW
- Cutting machine
- Driller 4,5kW
- Crane 16T
- Other
AI.11221 Binding rafter processing
Material:
- Steel bar
- Plate steel
- Oxygen
- calcium carbide
- Welding rod
- Other
Labour level of 3,5/7
AI.11311 Produce beam of wall, truss
Material:
- Steel bar
kg
kg
chai
kg
kg
%
cng
25
1005
3.5
13.6
28
5.00%
18.5
18,000
450,000
18,000 18,090,000
60,000
210,000
11,500
156,400
17,000
476,000
969,120
75,039
1,388,226
ca
ca
ca
ca
%
5.18
244,198
1.25
99,461
1.5
118,980
0.38 2,117,904
5.00%
1 tn
kg
kg
chai
kg
kg
%
cng
1 tn
kg
XD.6.2-40
0.232
1.6
1.00%
7.02
811.43
10
1,264,946
124,326
178,470
804,804
118,627
18,667,143
1025
490,952
18,000 18,450,000
0
60,000
13,920
11,500
18,400
17,000
0
184,823
69,936
490,952
19,037,080 2,063,579 1,347,848
18,000 14,605,740
138
139
- Plate steel
- Round steel
- Welding rod
- Oxygen
- calcium carbide
Labour level of 4/7
Machine
- Welding machine 23kW
- Driller 4,5kW
- Crane 10T
AI.11321 Produce roof' beam
Material:
- Steel bar
- Plate steel
- Round steel
- Welding rod
- Oxygen
- calcium carbide
Labour level of 4/7
Machine
- Welding machine 23kW
- Driller 4,5kW
- Crane 10T
AI.11331 Produce crane beam
Material:
- Steel bar
kg
kg
kg
chai
kg
cng
ca
ca
ca
1 tn
kg
kg
kg
kg
chai
kg
cng
ca
ca
ca
1 tn
kg
XD.6.2-41
218.78
0.95
18.5
1.6
7.2
27.5
18,000
0
17,000
60,000
11,500
75,039
4.1
244,198
0.5
118,980
0.17 1,689,097
842.85
186.6
10.2
0.93
3.71
25.108
10
3,938,040
0
314,500
96,000
82,800
2,063,579
1,001,212
59,490
287,146
18,801,965 1,884,085 1,009,633
18,000 15,171,300
18,000 3,358,800
0
17,000
173,400
60,000
55,800
11,500
42,665
75,039
1,884,085
2.33
244,198
2
118,980
0.12 1,689,097
964.53
568,981
237,960
202,692
19,428,875 1,696,562 1,779,750
18,000 17,361,540
140
kg
- Plate steel
kg
- Round steel
kg
- Welding rod
chai
- Oxygen
kg
- calcium carbide
m3
- Concrete sand
kg
- Fine coal
cng
Labour level of 4/7
Machine
ca
- Welding machine 23kW
ca
- Driller 4,5kW
ca
- Crane 10T
ca
- Scroll machine
ca
- Air compressor 360m3/h
ca
- Planing machine
Process steel for support, platform,
AI.11411
1 tn
stair, etc.
Material:
kg
- Steel bar
kg
- Round steel
kg
- Welding rod
chai
- Oxygen
kg
- calcium carbide
cng
Labour level of 4/7
Machine
ca
- Welding machine 23kW
XD.6.2-42
62.15
21.5
2.53
25.69
1.3
32.87
22.609
18,000
0
17,000
60,000
11,500
90,000
575
75,039
10
1,118,700
0
365,500
151,800
295,435
117,000
18,900
1,696,562
4.8
244,198
0.04
118,980
0.27 1,689,097
0.23
90,717
0.16
745,661
0.05
132,263
1,172,150
4,759
456,056
20,865
119,306
6,613
19,303,945 2,222,287 1,710,033
618.4
416.5
24.5
0.48
1.93
29.615
6.15
18,000 11,131,200
18,500 7,705,250
17,000
416,500
60,000
28,800
11,500
22,195
75,039
2,222,287
244,198
1,501,818
- Driller 4,5kW
AI.11421 Banister processing
Material:
- Steel bar
- Plate steel
- Round steel
- Welding rod
- Oxygen
- calcium carbide
Labour level of 4/7
Machine
- Welding machine 23kW
ca
1 tn
1.75
kg
kg
kg
kg
chai
kg
cng
625.39
316
61.4
22.66
0.78
3.78
36.784
142
1m2
143
Material:
- Steel bar
- Round steel F > 10
- Steel net B40
- Welding rod
- Oxygen
- calcium carbide
- Other
Labour level of 3,5/7
Machine
- Welding machine 23kW
AI.11531 Process fence with iron bar
141
ca
5.6
118,980
10
208,215
17,420,510 2,760,243 1,367,509
18,000 11,257,020
18,000 5,688,000
0
0
17,000
385,220
60,000
46,800
11,500
43,470
75,039
2,760,243
244,198
1,367,509
308,686
kg
kg
m2
kg
chai
kg
%
cng
13
0.7
1.1
0.42
0.06
0.027
0.50%
1.17
18,000
18,000
45,000
17,000
60,000
11,500
ca
1m2
0.12
244,198
XD.6.2-43
81,825
29,304
234,000
12,600
49,500
7,140
3,600
311
1,536
69,936
81,825
401,163
90,917
29,304
34,188
144
Material:
- Steel bar
- Round steel F > 10
- Steel net B40
- Welding rod
- Oxygen
- calcium carbide
- Other
Labour level of 3,5/7
Machine
- Welding machine 23kW
AI.11912 Platform processing
Material:
- Steel bar
- Plate steel
- Round steel
- Steel net B40
- Welding rod
- Oxygen
- calcium carbide
- Other
Labour level of 4/7
Machine
- Welding machine 23kW
- Cutting machine
- Crane 10T
kg
kg
m2
kg
chai
kg
%
cng
5
16.5
0.65
0.01
0.045
0.50%
1.3
ca
1tn
0.14
kg
kg
kg
m2
kg
chai
kg
%
cng
697.85
362.15
16.5
ca
ca
ca
XD.6.2-44
24.15
2.1
8.4
5.00%
22.61
18,000
18,000
45,000
17,000
60,000
11,500
69,936
244,198
10
90,000
297,000
0
11,050
600
518
1,996
90,917
34,188
20,698,808 1,696,637 1,619,151
18,000 12,561,300
18,000 6,518,700
0
0
45,000
0
17,000
410,550
60,000
126,000
11,500
96,600
985,658
75,039
1,696,637
4.6
244,198
0.4
99,461
0.27 1,689,097
1,123,311
39,784
456,056
145
146
1 tn
1025
0.078
0.3
17.5
1.50%
18.5
ca
ca
ca
%
1 tn
3.2
244,198
0.5
90,717
0.27 2,117,904
1.00%
kg
kg
vin
chai
kg
kg
%
cng
765
265
0.43
2.2
12.1
21.53
1.00%
23.5
XD.6.2-45
10
kg
chai
kg
kg
%
cng
ca
ca
4.78
1.75
18,000 18,450,000
60,000
4,680
11,500
3,450
17,000
297,500
281,334
81,058
1,499,576
781,434
45,359
571,834
13,986
19,371,928 1,904,867 1,513,274
18,000 13,770,000
18,000 4,770,000
6,900
2,967
60,000
132,000
11,500
139,150
17,000
366,010
191,801
81,058
1,904,867
244,198
77,131
1,167,266
134,979
- Driller 2,5kW
- Other
AI.52251+
Produce steel door
TT
Material:
- Plate steel
- Steel bar
- Whetstone
- Oxygen
- calcium carbide
- Welding rod
- Fire proof layer
- Other
148 AI.52123 Produce steel bar
Material:
- Plate steel
- Whetstone
- Welding rod
- Other
Labour level of 4,5/7
Machine
- Cutting machine 15kW
- My lc Corrugated iron 5kW
- Welding machine 23kW
- Grinding machine 2,7kW
- Other
147
ca
%
1.34
5.00%
10
138,967
72,061
19,371,928 1,904,867 1,513,274
765
265
0.43
2.2
12.1
21.53
1.00%
kg
vin
kg
%
cng
1100
0.45
14
5.00%
37
ca
ca
ca
ca
%
1.8
1.8
5
1.15
5.00%
XD.6.2-46
103,707
1 tn
kg
kg
vin
chai
kg
kg
m3
%
1tn
18,000 13,770,000
18,000 4,770,000
6,900
2,967
60,000
132,000
11,500
139,150
17,000
366,010
0
0
191,801
37,307,870 2,999,152 1,958,061
32,082 35,290,200
6,900
3,105
17,000
238,000
1,776,565
81,058
2,999,152
197,023
111,382
244,198
77,131
354,641
200,488
1,220,990
88,701
93,241
149
150
1tn
1180
3.3
14.48
0.5
3.50%
24.3
ca
ca
%
1tn
3.21
3.21
3.00%
cng
ca
ca
ca
XD.6.2-47
22,364,249 1,969,713
kg
chai
kg
vin
%
cng
ci
ci
kg
kg
kg
m3
10
648,402
18,000 21,240,000
60,000
198,000
11,500
166,520
6,900
3,450
756,279
81,058
1,969,713
77,131
118,980
566,560
12.00
4,025
20.00
2,185
6.00
17,000
0.24
17,000
1.00
18,000
0.03
2,240,000
5.00%
9.712
69,936
0.32 2,117,904
1.2
244,198
0.9
118,980
247,591
381,926
18,885
679,221 1,327,477
48,300
43,700
102,000
4,080
18,000
67,200
283,280
679,221
677,729
293,038
107,082
151
152
ca
%
0.25
5.00%
745,661
333,191
ci
ci
kg
kg
kg
m3
cng
ca
ca
ca
ca
ca
%
1 tn
ci
ci
kg
kg
kg
XD.6.2-48
15.00
4,025
10.00
2,185
7.00
17,000
0.50
17,000
1.00
18,000
0.04
2,240,000
5.00%
5.2
69,936
186,415
63,213
363,668 1,166,870
363,668
354,643
4,025
2,185
17,000
17,000
18,000
10
60,375
21,850
119,000
8,500
18,000
89,600
15,866
0.3 2,117,904
3,119,868
1.4
244,198
0.5
118,980
0.1
745,661
5.00%
15.00
8.00
8.20
0.24
1.49
60,375
17,480
139,400
4,080
26,820
635,371
0
341,877
59,490
74,566
55,565
419,617 1,367,740
153
154
Choke plank
Other
Labour level of 3,5/7
Machine
- Crane 16T
- Crane 30T
- Welding machine 23kW
- Driller 4,5kW
- Air compressor 360m3/h
- Other machine
AI.61131 Install binding rafter
Material:
Bolt M20x80
Welding rod
Steel bar
Other
Labour level of 3,5/7
Machine
- Crane 10T
- Driller 4,5kW
- Air compressor 360m3/h
- Welding machine 23kW
AI.61141 Install steel bracing by rivet
Material:
Bolt M20x80
- Rivet
m3
0.04
5.00%
cng
ca
ca
ca
ca
ca
%
1tn
ci
kg
kg
cng
ca
ca
ca
ca
1tn
ci
ci
XD.6.2-49
2,240,000
6
69,936
419,617
312,795
4,025
17,000
18,000
54.00
108.00
4,025
2,185
0
779,967
400,485
47,592
74,566
65,130
190,926 1,059,311
193,200
102,000
2,700
14,895
69,936
0.338 1,689,097
118,980
745,661
2.00
244,198
10
89,600
16,888
2,117,904
0.25 3,119,868
1.64
244,198
0.4
118,980
0.1
745,661
5.00%
48.00
6.00
0.15
5.00%
2.73
190,926
570,915
0
0
488,396
478,832 1,509,224 2,493,683
217,350
235,980
155
156
Welding rod
Steel bar
Other
Labour level of 3,5/7
Machine
- Crane 10T
- Driller 4,5kW
- Air compressor 360m3/h
- Welding machine 23kW
AI.61151 Instal beam of wall, pile, bridge crane
Material:
Bolt M20x80
- Rivet
Welding rod
- Round steel
Steel bar
Other
Labour level of 4,5/7
Machine
- Crane 10T
- Welding machine 23kW
AI.61161 Install hanging beam
Material:
Bolt M20x80
- Rivet
- Choke plank
kg
kg
cng
ca
ca
ca
%
1 tn
ci
ci
kg
kg
kg
cng
ca
ca
1tn
ci
ci
m3
XD.6.2-50
0.15
5.00%
21.58
17,000
18,000
69,936
1,509,224
437,703
7.00
1.16
0.15
5.00%
6.153
4,025
2,185
17,000
18,500
18,000
844,549
642,492
1,006,642
0
498,751 1,013,365
273,700
0
119,000
21,460
2,700
20,843
81,058
498,751
0.412 1,689,097
1.3
244,198
246,614
27.00
27.00
0.03
4,025
2,185
2,240,000
10
2,700
22,802
0.5 1,689,097
5.4
118,980
1.35
745,661
244,198
68.00
108,675
58,995
67,200
534,173
695,908
317,457
865,260
157
158
Other
Labour level of 4,5/7
Machine
- Crane 10T
- Driller 4,5kW
- Air compressor 360m3/h
AI.61171 Install platform
Material:
- Bolt M20x80
- Welding rod
- Other
Labour level of 3/7
- Crane 10T
- Welding machine 23kW
Install beam of steel
AI.62121
underwater
Material:
- Wood sleeper
- Bolt
- Other
Labour level of 4,5/7
Machine
- Crane 16T
- Crane 25T
- Steel float 200T
- Barge 400T
cng
ca
ca
ca
1tn
ci
kg
%
cng
ca
ca
bridges
5.00%
6.59
ca
ca
ca
ca
XD.6.2-51
10
11,744
81,058
534,173
0.275 1,689,097
1.25
118,980
0.338
745,661
264,915
12
4,025
12
17,000
5.00%
13.63
64,833
0.42 1,689,097
3
244,198
1tn
ci
ci
%
cng
464,502
148,725
252,033
883,677 1,442,015
48,300
204,000
12,615
883,677
709,421
732,594
78,518 1,694,115 2,133,364
0.17
17.85
5.00%
20.9
138,000
2,875
81,058
0.14 2,117,904
0.28 2,791,539
0.27
215,759
0.27
927,369
23,460
51,319
3,739
1,694,115
296,507
781,631
58,255
250,390
159
160
161
ca
ca
ca
%
1m2
6,272
1.2
2
0.2
0.47
860
920
17,000
75,039
ca
1m2
0.1
244,198
kg
ci
kg
cng
1m2
1.2
2
m3
kg
%
cng
0.0025
0.2
5.00%
0.4
404,134
17,000
0.1
244,198
XD.6.2-52
0.05
778,194
1.08
123,915
0.27 1,749,093
5.00%
kg
ci
kg
cng
ca
0.3
35,268
24,420
22,512
1,032
2,300
0
4,580
75,039
38,910
133,828
472,255
101,589
24,420
1,032
1,840
3,400
3,332
860
1,150
17,000
75,039
35,268
10
22,512
30,016
24,420
1,010
3,400
170
30,016
24,420
162
163
1tn
13.65
17,000
0.045 2,240,000
0.25
6,900
3.5
6,325
10.00%
16.5
75,039
ca
ca
ca
%
1 tn
3.03
4.98
1.9
10.00%
ca
ca
XD.6.2-53
10
kg
m3
vin
kg
%
cng
kg
kg
vin
m3
kg
kg
%
cng
232,050
100,800
1,725
22,138
35,671
1,238,147
244,198
73,918
77,131
444,141
7.5
17,000
11.5
18,000
0.55
6,900
0.015 2,240,000
3.5
6,325
3
13,800
2.00%
9.15
81,058
1.7
0.85
244,198
73,918
739,920
368,112
146,549
125,458
741,682 1,088,939
127,500
207,000
3,795
33,600
22,138
41,400
8,709
741,682
415,137
62,830
164
165
- Electric winch 5T
- Grinding machine 2,7kW
- Crane 25T
- Other
AK.12222 Roof, cover wall by corrugated iron
Material:
- Corrugated iron Ausnam 0,7mm
- Nail, screw
Labour level of 3,5/7
AK.12222 Corrugated iron, 2 layers with
+TT
insulating layer
Material:
AUSNAM corrugated iron, thickness
0,7 mm
Corrugated iron AUSNAM thickness
0,53 mm
Mineral cotton
Screw
Other
- Labour level of 4/7
Machine
- Folding machine for corrugated iron
- Folding machine for edge
- Handle driller
- Electric winch 5T
ca
ca
ca
%
100m2
m2
ci
cng
0.85
123,915
0.85
77,131
0.15 2,791,539
2.00%
118.5
450
4.5
314,713
270,000 31,995,000
115
51,750
69,936
314,713
m2
121
270,000 32,670,000
m2
100
200,000 20,000,000
ca
ca
ca
ca
XD.6.2-54
10
105,328
65,561
418,731
21,352
32,046,750
100m2
m3
ci
%
cng
5
3600
20.00%
125
5
10
25
1
110,500
552,500
3,500 12,600,000
13,164,500
75,039
9,379,904
111,382
111,382
86,447
123,915
556,910
1,113,820
2,161,175
123,915
166
167
100m2
m2
m3
ci
%
cng
ca
ca
ca
ca
121
10
5
3600
0.2
80
5
10
25
1
270,000 32,670,000
110,500
552,500
3,500 12,600,000
9,164,500
75,039
6,003,138
111,382
111,382
86,447
123,915
556,910
1,113,820
2,161,175
123,915
52,233
0.017
566,152
9,625
kg
%
cng
2
0.50%
0.26
21,174
42,348
260
ca
%
0.003
5.00%
91,524
XD.6.2-55
1m2
m3
75,039
19,510
288
19,510
275
14
168
169
170
1m2
6,905
m3
%
cng
0.017
0.50%
0.26
404,134
ca
%
0.003
5.00%
91,524
0.023
0.50%
0.32
404,134
ca
%
1m2
0.003
5.00%
91,524
m3
%
cng
0.023
0.50%
0.22
404,134
ca
%
0.003
2.00%
91,524
288
275
14
24,013
288
9,295
46
75,039
24,013
9,342
75,039
19,510
10
19,510
9,342
m3
%
cng
6,870
34
75,039
1m2
XD.6.2-56
16,509
275
14
280
9,295
46
16,509
275
5
171
172
173
1m2
10,154
m3
%
cng
0.025
0.50%
0.57
404,134
ca
%
1m2
0.003
5.00%
91,524
m3
%
cng
0.018
0.50%
0.35
404,134
ca
%
1m2
0.003
5.00%
91,524
m2
m3
kg
kg
%
cng
1.005
0.013
0.65
0.17
1.00%
0.69
126,000
404,134
860
2,500
0.2
82,574
ca
XD.6.2-57
42,772
10
288
10,103
51
75,039
42,772
7,311
26,264
275
14
288
7,274
36
75,039
26,264
134,196
75,039
51,777
275
14
16,515
126,630
5,254
559
425
1,329
51,777
16,515
174
175
176
177
178
AK.31110
Insulating layer inside stack
+TT
AK.41140
Hardener layer
+TT1
Material:
- Sikafloor Chapdur layer
Labour level of 4/7
Machine
- Mixer 80l
AK.41114 Shine floor, thickness 5cm
Material:
- Mortar
Labour level of 4/7
Machine
- Mixer 80l
AK.41114 Shine floor by mortar with acid
+TT-1 proof, thickness 50
Material:
- Mortar with acid proof
Labour level of 4/7
Machine
- Mixer 80l
AK.42214 Shine tank bottom by wate proof
+TT
layer Sika Latex
Material:
- Water proof mortar
10
1m2
650,000
51,777
24,772
1m2
46,198
12,757
686
kg
cng
6
0.17
7,700
75,039
ca
1m2
0.0075
91,524
m3
cng
0.0625
0.17
404,134
75,039
ca
0.0075
91,524
0.0625 3,801,618
0.17
75,039
ca
0.0075
12,757
12,757
686
12,757
12,757
686
95,778
0.025 3,801,618
686
237,601
91,524
1m2
686
686
25,258
237,601
m3
cng
XD.6.2-58
12,757
25,258
1m2
m3
46,198
95,040
10,656
275
179
180
181
- Cement
- Other
Labour level of 4/7
Machine
- Mixer 80l
kg
%
cng
1m2
Material:
- White stone
- Stone powder
- Color powder
- White cement
- Other
Labour level of 4/7
AK.51240 Pave with ceramic brick, 300x300
Material:
- Brick
- Mortar
- Cement
- White Cement
- Other
Labour level of 4/7
Machine
- Cutting machine 1,7kW
AK.54210 Light brick, thickness 0,6
Material:
ca
0.303
0.50%
0.142
860
75,039
0.003
91,524
16.5
9.5
0.105
9.5
0.50%
2.77
600
4,600
32,200
2,500
vin
m3
kg
kg
%
cng
1.005
0.025
0.8
0.16
0.50%
0.17
900
566,152
860
2,500
ca
1m2
0.03
82,574
10
261
477
10,656
275
81,135
kg
kg
kg
kg
%
cng
1m2
XD.6.2-59
207,859
9,900
43,700
3,381
23,750
404
75,039
16,227
207,859
12,757
2,477
905
14,154
688
400
81
75,039
12,757
2,477
104,589
12,589
- Brick, 6 holes
- Mortar for pointing
- Mortar for lining
- Other
Labour level of 3,5/7
182 AK.65120 Lm trn
Material:
- Wood
- Plank for Lambri
- Nails
Labour level of 4/7
183 AK.82110 Wall putty
Material:
- Putty
- Garnet paper
Labour level of 4/7
AK.82110
184 +AK.8441 Paint inside tanke by epoxy
2
Material:
- Putty
- Garnet paper
- Epoxy paint
- Other
Labour level of 4/7
Labour level of 3,5/7
vin
m3
m3
%
cng
1m2
29
2,560
0.005 3,801,618
0.0255
404,134
1.00%
0.18
69,936
m3
m3
kg
cng
1m2
0.02 2,800,000
0.017 11,500,000
0.15
10,350
1.75
75,039
kg
m2
cng
6,900
86,250
75,039
XD.6.2-60
6,900
86,250
70,000
75,039
69,936
131,319
22,512
2,760
1,725
22,512
24,435
0.4
0.02
0.285
1.00%
0.3
0.06
12,589
131,319
56,000
195,500
1,553
4,485
0.4
0.02
0.3
74,240
19,008
10,305
1,036
253,053
1m2
kg
m2
kg
%
cng
cng
26,708
2,760
1,725
19,950
22,512
4,196
10
185
186
187
1m2
kg
kg
kg
kg
m2
%
cng
13,977
0.4
0.3
0.2
0.025
0.02
1.50%
0.45
25,000
4,600
2,500
6,624
86,250
0.4
0.3
0.2
0.025
0.02
1.50%
0.54
kg
kg
%
cng
0.225
0.118
1.00%
0.125
25,000
4,600
2,500
6,624
86,250
7,044
69,936
40,521
10,000
1,380
500
166
1,725
207
75,039
25,000
11,436
33,768
33,768
13,977
kg
kg
kg
kg
m2
%
cng
1m2
10,000
1,380
500
166
1,725
207
75,039
1m2
XD.6.2-61
40,521
8,742
5,625
1,349
70
8,742
10
188
AK.84112
189
190
191
192
1m2
kg
kg
%
cng
0.125
0.117
1.00%
0.06
46,500
70,000
0.125
0.122
1.00%
0.066
46,500
70,000
4,196
0.162
0.324
1.00%
0.0730486
46,500
70,000
ca
0.0000486
441,316
10
5,813
8,190
140
4,196
14,143
4,196
14,496
5,813
8,540
144
4,616
4,616
30,515
kg
kg
%
cng
XD.6.2-62
14,143
69,936
1m2
1m2
69,936
1m2
kg
kg
%
cng
5,109
21
7,533
22,680
302
69,936
5,109
21
22,880
5,105
Material:
- Lining paint
- Covering paint
- Other
Labour level of 3,5/7
193
194
195
196
kg
kg
%
cng
AK.92111
Seepage concrete
1m2
+TT
Material:
m3
- Seepage concrete
%
- Other
cng
Labour level of 3/7
AK.94111 Wall paint by hot bitumen
1m2
Material:
kg
- Bitumen No. 4
kg
- Stone powder
kg
- Firewood
cng
Labour level of 3,5/7
AK.94241 Polyethylene layer for floor lining
1m2
+TT
(Sikaproof Membrane)
Material:
kg
- Bitumen No. 4
kg
- Sikaproof Membrane layer
kg
- Stone powder
kg
- Firewood
cng
Labour level of 3,5/7
AL.16121 Spread Geotechnic cloth
100m2
XD.6.2-63
0.162
0.216
1.00%
0.073
46,500
70,000
7,533
15,120
227
69,936
5,105
209,089
0.05 3,801,618
10.00%
0.03
64,833
87,500
4,600
900
69,936
21,174
4,600
900
69,936
1,945
4,896
183,750
5,548
1,800
4,896
64,391
2
3.618
6
0.51
1,945
190,081
19,008
191,098
2.1
1.206
2
0.07
35,667
42,348
16,643
5,400
2,755,500
35,667
82,525
10
197
AL.17111
198
AL.17211
199
AL.41310
200
AL.71110
Material:
- Geotechnic cloth
- Other
Labour level of 3,5/7
Plant grass in channel, dyke, road
Labour level of 2,5/7
Unloading & transportation, distance
10m
Labour level of 2,5/7
Make copper joint, type I
Material:
- Plate copper b=2mm
- Corrugated iron b=2mm
- Copper welding rod
- Steel welding rod
- Bitumen
- Firewood
- Cement mortar M100
Labour level of 4/7
Machine
- Welding machine 23kW
Unloading and transportation
work to high level
Sand, coal slage
Labour level of 3,5/7
- Lift <=3T
m2
%
cng
100m2
cng
110
0.20%
1.18
25,000
60,515
69,936
82,525
544,638
544,638
6,415
cng
1m
0.106
kg
kg
kg
kg
kg
kg
m3
cng
7.102
4.805
0.105
0.045
21.2
20
0.0315
11.76
43,700
200,000
66,700
17,000
87,500
900
566,152
75,039
0.022
244,198
m3
cng
ca
XD.6.2-64
10
2,750,000
5,500
100m2
ca
60,515
3,169,960
0.37
0.09
69,936
441,316
6,415
882,461
5,372
310,357
961,000
7,004
765
1,855,000
18,000
17,834
882,461
5,372
25,876
25,876
39,718
39,718
201
202
203
204
205
206
207
208
XD.6.2-65
0.45
0.09
0.57
0.07
0.2
0.02
69,936
441,316
69,936
441,316
69,936
441,316
0.38
0.3
69,936
441,316
0.38
0.09
69,936
441,316
0.15
0.16
0.12
0.03
69,936
441,316
69,936
441,316
31,471
31,471
39,864
39,864
13,987
13,987
26,576
26,576
26,576
26,576
10,490
10,490
8,392
8,392
69,936
441,316
39,718
39,718
30,892
30,892
8,826
8,826
132,395
132,395
39,718
39,718
70,611
70,611
13,239
13,239
34,269
0.49
0.13
10
57,371
34,269
57,371
Vt liu :
- Thp trn
- Dy thp
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
n v
kg
kg
kg
cng
CNG TC CT THP
n gi
<=10
<=18
> 18
15,215
17,015
17,000
15,015
17,015
17,000
14,915
17,015
17,000
69,936
69,936
69,936
ca
ca
203,541
81,621
203,541
81,621
203,541
81,621
kg
kg
kg
15,215
17,015
17,000
15,215
17,015
17,000
15,215
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
203,541
81,621
203,541
81,621
203,541
81,621
kg
kg
15,215
17,015
15,215
17,015
15,215
17,015
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
%
81,621
81,621
81,621
198,974 198,974 198,974
464,992 464,992 464,992
2,678,075 2,678,075 2,678,075
3,238,876 3,238,876 3,238,876
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
AF.613 Ct thp tng My thi cng :
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
Nhn cng
- Nhn cng 3,5/7
My thi cng :
kg
kg
kg
15,015
17,015
17,000
15,015
17,015
17,000
15,015
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
ca
%
kg
kg
kg
14,915
17,015
17,000
14,915
17,015
17,000
14,915
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
ca
%
kg
kg
15,215
17,015
15,215
17,015
15,215
17,015
cng
69,936
69,936
69,936
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
AF.614 Ct thp ct, tr My thi cng :
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
ca
ca
ca
ca
ca
%
81,621
81,621
81,621
198,974 198,974 198,974
464,992 464,992 464,992
2,678,075 2,678,075 2,678,075
3,238,876 3,238,876 3,238,876
kg
kg
kg
15,015
17,015
17,000
15,015
17,015
17,000
15,015
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
ca
%
kg
kg
kg
14,915
17,015
17,000
14,915
17,015
17,000
14,915
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
ca
%
Vt liu :
- Thp trn
- Dy thp
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
Ct thp x, dm
AF.615
My thi cng :
ging
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
My thi cng :
kg
kg
15,215
17,015
15,215
17,015
15,215
17,015
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
%
81,621
81,621
81,621
198,974 198,974 198,974
464,992 464,992 464,992
2,678,075 2,678,075 2,678,075
3,238,876 3,238,876 3,238,876
kg
kg
kg
15,015
17,015
17,000
15,015
17,015
17,000
15,015
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
ca
%
kg
kg
kg
14,915
17,015
17,000
14,915
17,015
17,000
14,915
17,015
17,000
cng
69,936
69,936
69,936
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
Ct thp lanh t - Khc
AF.616 lin mi ht,
mng nc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
ca
ca
ca
ca
ca
ca
%
kg
kg
15,215
17,015
15,215
17,015
15,215
17,015
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
%
81,621
81,621
81,621
198,974 198,974 198,974
464,992 464,992 464,992
2,678,075 2,678,075 2,678,075
3,238,876 3,238,876 3,238,876
kg
kg
kg
15,015
17,015
17,000
15,015
17,015
17,000
15,015
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
ca
%
Vt liu :
- Thp trn
- Dy thp
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My ct un 5kW
- Vn thng lng 3T
- Cu thp 25T
- Khc
kg
kg
15,215
17,015
15,215
17,015
15,215
17,015
cng
69,936
69,936
69,936
ca
ca
ca
%
81,621
81,621
81,621
464,992 464,992 464,992
2,678,075 2,678,075 2,678,075
AF.617 Ct thp sn mi
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My ct un 5kW
- My vn thng
- Vn thng lng 3T
AF.618
Ct thp cu
thang
kg
kg
kg
15,015
17,015
17,000
15,015
17,015
17,000
15,015
17,015
17,000
cng
69,936
69,936
69,936
ca
ca
ca
ca
ca
%
kg
kg
15,215
17,015
15,215
17,015
15,215
17,015
cng
69,936
69,936
69,936
81,621
198,974
464,992
81,621
198,974
464,992
81,621
198,974
464,992
ca
ca
ca
AF.618
Ct thp cu
thang
- Cu thp 25T
- Cu thp 40T
- Khc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng
- Nhn cng 3,5/7
My thi cng :
- My hn 23kW
- My ct un 5kW
- Vn thng 0,8T
- Vn thng lng 3T
- Cu thp 25T
- Cu thp 40T
- Khc
AF.621
Ct thp lng
thang my
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng :
- Nhn cng 4/7
My thi cng :
- My ct un 5kW
- Cu thp 50T
- My hn 23kW
- My vn thng 3T
- Khc
Vt liu :
- Thp trn
- Dy thp
AF.623
Ct thp ng
khi
ca
ca
%
kg
kg
kg
15,015
17,015
17,000
cng
69,936
ca
ca
ca
ca
ca
ca
%
203,541
81,621
198,974
464,992
2,678,075
3,238,876
kg
kg
kg
15,215
17,015
17,000
15,015
17,015
17,000
14,915
17,015
17,000
cng
75,039
75,039
75,039
ca
ca
ca
ca
%
kg
kg
81,621
81,621
81,621
4,709,162 4,709,162 4,709,162
203,541 203,541 203,541
274,062 274,062 274,062
15,215
17,015
15,015
17,015
14,915
17,015
AF.623
AF.671
Ct thp ng
khi
Ct thp cc
khoan nhi
- Que hn
Nhn cng :
- Nhn cng 4/7
My thi cng :
- My ct un 5kW
- Cu thp 50T
- My hn 23kW
- My vn thng 3T
- Khc
Vt liu :
- Thp trn
- Dy thp
- Que hn
Nhn cng :
- Nhn cng 4/7
My thi cng :
- My hn 23kW
- My ct un 5kW
- Cn cu 25T
Vt liu :
- Thp trn
- Dy thp
- Que hn
- Khc
Ct thp cc Nhn cng :
AF.672 khoan nhi di - Nhn cng 4/7
nc
My thi cng :
- My hn 23kW
- My ct un 5kW
- Cn cu 16T
- Cn cu 25T
- X lan 200T
- X lan 400T
- Tu ko 150CV
kg
17,000
17,000
17,000
cng
75,039
75,039
75,039
ca
ca
ca
ca
%
81,621
81,621
81,621
4,709,162 4,709,162 4,709,162
203,541 203,541 203,541
274,062 274,062 274,062
kg
kg
kg
15,215
17,015
17,000
15,015
17,015
17,000
14,915
17,015
17,000
cng
75,039
75,039
75,039
ca
ca
ca
kg
kg
kg
%
15,215
17,015
17,000
15,015
17,015
17,000
14,915
17,015
17,000
cng
75,039
75,039
75,039
ca
ca
ca
ca
ca
ca
ca
100m2
Vt liu :
- Thang leo, tay vn
- Ct pha thp
- Thp ng (thang
- Thp hnh
- Thp tm (lm sn)
- Thp trn
- ng thp D50
- Li an ton
- Li mt co
Gia cng, lp
1x1x1,2
dng, tho d v
AF.864
- Bu lng M16x150
vn hnh thit b
- Que hn
vn khun trt
- G nhm 4
- Khc
Nhn cng
- Nhn cng 5/7
My thi cng :
- B thit b trt (60
kch loi 6T)
- My hn 23kW
- Cu thp 50T
- My khoan 1,7kW
- My trc c
- My khc
kg
kg
kg
kg
kg
kg
kg
m2
13,015
12,075
15,315
15,315
16,315
15,215
12,075
45,000
13,015
12,075
15,315
15,315
16,315
15,215
12,075
45,000
13,015
12,075
15,315
15,315
16,315
15,215
12,075
45,000
m2
45,000
45,000
45,000
ci
kg
m3
%
cng
2,875
2,875
2,875
17,000
17,000
17,000
2,040,000 2,040,000 2,040,000
87,077
87,077
87,077
ca
ca
ca
ca
ca
%
T THP
<=10
15,655,536.30
1,005.00
21.42
791,678.13
11.32
32,648.40
0.40
1,005.00
21.42
1,020.00
1,020.00
14.28
14.28
4.82
5.30
904,974.83
704,957.21
547,600.69
12.94
10.08
7.83
32,648.40
855,488.24
855,489.67
0.00
1.16
1.27
0.40
0.32
0.16
ng knh ct thp <=10mm
Chiu cao (m)
<=4
<=16
<=50
>50
15,655,536.30 15,655,536.30 15,655,536.30 15,655,536.30
1,005.00
1,005.00
1,005.00
1,005.00
21.42
21.42
21.42
21.42
953,230.83
987,499.58 1,086,109.66 1,135,065.03
13.63
14.12
15.53
16.23
32,648.40
41,419.50
123,067.35
146,639.72
0.40
0.40
0.40
0.40
0.04
0.03
0.03
0.03
0.03
0.02
0.02
0.02
ng knh ct thp <=18mm
<=4
<=16
<=50
>50
0.40
0.40
0.04
0.40
0.40
0.03
0.03
0.03
0.03
0.02
0.02
0.02
ng knh ct thp <=18mm
<=4
<=16
<=50
>50
15,637,154.20 15,637,154.20 15,637,154.20 15,637,154.20
1,020.00
1,020.00
1,020.00
1,020.00
14.28
14.28
14.28
14.28
4.64
4.64
4.64
4.64
700,761.03
712,650.19
783,985.15
819,652.62
10.02
10.19
11.21
11.72
236,107.70 1,452,410.76
952,748.82
974,606.64
1.16
1.16
1.16
1.16
0.32
0.32
0.32
0.32
0.04
0.03
0.03
0.03
0.03
0.02
0.02
0.02
ng knh ct thp > 18mm
<=4
<=16
<=50
>50
15,561,674.20 15,561,674.20 15,561,674.20 15,561,674.20
1,020.00
1,020.00
1,020.00
1,020.00
14.28
14.28
14.28
14.28
6.20
6.20
6.20
6.20
593,059.24
618,935.64
681,178.89
711,950.83
8.48
8.85
9.74
10.18
303,276.27 1,452,411.46
943,131.55
967,051.44
1.49
1.49
1.49
1.49
0.16
0.16
0.16
0.16
0.40
0.02
0.03
0.02
0.03
0.02
0.02
0.02
ng knh ct thp <=10mm
1.46
0.16
1.46
0.16
0.40
1.46
0.16
1.46
0.16
0.02
0.02
0.03
0.03
0.02
0.02
0.02
ng knh ct thp <=10mm
Chiu cao (m)
<=4
<=16
<=50
>50
15,655,536.30 15,655,536.30 15,655,536.30 15,655,536.30
1,005.00
1,005.00
1,005.00
1,005.00
21.42
21.42
21.42
21.42
1,519,014.93 1,546,290.06 1,700,849.13 1,776,380.26
21.72
22.11
24.32
25.40
32,648.40
858,620.94
129,479.21
154,195.61
0.40
0.40
0.40
0.40
0.04
0.03
0.03
0.03
0.03
0.02
0.02
0.02
ng knh ct thp >10mm
<=4
<=16
<=50
>50
15,636,763.20 15,636,763.20 15,636,763.20 15,636,763.20
1,020.00
1,020.00
1,020.00
1,020.00
14.28
14.28
14.28
14.28
4.62
4.62
4.62
4.62
1,442,784.44 1,467,961.48 1,608,533.31 1,688,260.61
20.63
20.99
23.00
24.14
855,487.80 1,481,458.90
952,748.71
974,606.49
1.12
1.12
1.12
1.12
0.32
0.32
0.32
0.32
0.04
0.03
0.03
0.03
0.03
0.02
0.02
0.02
ng knh ct thp <=10mm
0.03
0.03
0.02
<=4
15,636,763.20
1,020.00
14.28
4.62
1,007,781.09
14.41
228,576.68
1.12
0.32
0.02
0.02
ng knh ct thp >10mm
<=16
<=50
> 49
15,636,763.20 15,636,763.20 15,636,763.20
1,020.00
1,020.00
1,020.00
14.28
14.28
14.28
4.62
4.62
4.62
1,023,167.06 1,108,489.26 1,158,843.34
14.63
15.85
16.57
285,165.01
355,967.15
380,683.54
1.12
1.12
1.12
0.32
0.32
0.32
0.04
0.03
0.03
0.03
0.03
0.02
0.02
0.02
ng knh ct thp (mm)
<=10
<=18
>18
15,678,820.00 15,407,165.00 15,302,970.00
1,007.00
1,005.00
1,004.00
21.00
14.00
14.00
4.64
5.30
1,167,610.43 1,013,029.62
847,943.31
15.56
13.50
11.30
177,197.94
418,844.23
436,987.12
0.44
0.35
0.18
0.03
0.03
0.03
1.24
1.40
0.03
0.02
0.02
0.01
0.01
0.01
ng knh ct thp (mm)
<=10
<=18
>18
15,678,820.00 15,407,165.00 15,302,970.00
1,007.00
1,005.00
1,004.00
21.00
14.00
14.00
17.50
162,098.77
0.44
0.03
0.03
0.01
4.64
5.30
1,125,588.46
900,470.77
15.00
12.00
457,065.98
352,222.20
0.35
0.18
0.02
0.01
1.30
1.40
0.22
0.02
0.01
0.01
ng knh ct thp (mm)
<=18
>18
15,719,774.20 15,634,774.20
1,020.00
1,020.00
14.28
14.28
9.50
10.50
922,982.54
810,423.69
12.30
10.80
829,821.38
842,931.13
2.37
2.62
0.32
0.16
0.13
0.12
ng knh ct thp (mm)
<=18
>18
15,719,774.20 15,634,774.20
1,020.00
1,020.00
14.28
14.28
9.50
10.50
0.01
0.01
1,015,280.79
891,466.06
13.53
11.88
1,313,248.31 1,290,303.18
2.37
2.62
0.32
0.16
0.07
0.06
0.15
0.14
0.15
0.14
0.15
0.14
0.03
0.03
Lng thang
Si l
ng khi
my
2,686,971.84 3,090,745.20 3,651,309.38
1.80
2.00
2.20
52.00
56.00
60.00
8.00
8.50
9.00
32.00
38.00
40.00
10.00
14.00
16.00
21.00
25.50
34.00
0.70
0.80
1.00
1.60
2.00
3.00
0.35
0.50
0.70
2.50
2.00
2.50
9.50
8.50
10.00
0.19
0.20
0.25
0.12
0.14
0.16
4,005,545.54 3,657,237.23 5,660,010.00
46.00
42.00
65.00
6,286,658.56 5,794,012.51 6,995,430.76
1.27
1.12
1.43
2.50
0.78
0.20
0.65
0.05
2.40
0.70
1.00
0.65
0.05
2.80
0.85
1.50
0.65
0.05
- Bt st 20x4x250
- Bt st d=10mm
- Bentonit
- B thit b trt (60 kch loi 6T)
Bng khong
- Bt b
- Bt mu
- Bu lng + li
- Bu lng M16
- Bu lng M16x150
- bu lng M20x80
- Ba cn kh nn
- Ba rung BP 170
- Ba rung BP 170
- Ca n 150CV
- Ca n 23CV
- Cn cu 10T
- Cn cu 16T
- Cn cu 25T
- Cn cu 30T
- Cp phi dm 0,075-50mm
- 4x6
- Ct vng
- Cu ni 30T
- Cu thp 25T
n v tnh
n gi
ci
ci
kg
ca
m3
kg
kg
ci
ci
ci
ci
ca
ca
ca
ca
ca
ca
ca
ca
ca
m3
m3
m3
ca
ca
920
1,150
6,325
1,172,389
110,500
4,600
32,200
2,875
1,835
2,875
4,025
85,985
785,763
785,763
658,266
216,538
1,562,086
1,987,476
2,471,617
2,995,026
240,000
140,000
90,000
2,995,026
2,678,075
Ghi ch
- Cu thp 40T
- Cu thp 50T
Cy cnh cc loi
ca
ca
- Cc b tng
- Cc b tng
- Cc b tng
m
m
m
kg
kg
kg
m3
m3
vin
- Cc b tng
- Cc b tng
- Ct chng thp ng
- Ct pha thp
- Ci t
-
- hc
- mi
- trng
- m cc
- m di 1,5kW
- t n
- Du bi
- Dy thp
- inh
- inh a
- inh tn
- inh, inh vt
3,238,876
4,709,162
kg
ca
ca
kg
kg
kg
kg
ci
ci
ci
12,075
12,075
900 TBG qu I/2008 ca UBND tnh H tnh
90,000 TBG T3/2008 ca UBND tnh H tnh
90,000 "
6,900
600 TBG qu I/2008ca UBND tnh H tnh
136,442
77,453
11,500
6,325
17,015 TBG qu T3/2008 ca UBND tnh H tnh
10,350
2,185
2,185
115
- ng tm b=2mm
- Gch
- Gch p
- Gch 6 l
- Gu khoan
- Gi long mn
- Giy rp
- G
- G chn
- G chng
- G np
- G nhm 4
- G vn
- G vn lm Lambri
- G x
- B tng atphan chng thm
- Lp chng chy
- Lp polyethylen
- Li an ton
- Li mt co 1x1x1,2
- Li thp B40
- Matt
- My bo
- My bm 200m3/h
- My bm BT 50m3/h
- My bm nc 20kW (bo dng BT)
- My ct
kg
vin
m2
vin
ci
ca
m2
m3
m3
m3
m3
m3
m3
m3
m3
kg
m3
m2
m2
m2
m2
kg
ca
ca
ca
ca
ca
43,700
785
126,000
2,250
14,000,000
1,494,021
86,250
2,040,000
2,040,000
2,040,000
2,040,000
2,040,000
2,040,000
11,500,000
2,800,000
43,311
45,000 TBG qu T3/2008 ca UBND tnh H tnh
45,000 TBG qu T3/2008 ca UBND tnh H tnh
45,000 TBG qu T3/2008 ca UBND tnh H tnh
6,900
131,215
125,083
2,837,591
243,351
95,788
- My ct gch 1,7kW
- My ct tn 15kW
- My ct un 5kW
- My cun ng
- My m 9T
- My m bn 1kW
- My o <=1,25m3
- My o <=2,3m3
- My ng cc
- My ng cc
- My ng cc
- My ng cc
- My ng cc 1,8T
- My p cc >150T
- My gp mp
- My gp mp
- My hn 23kW
- My hn 23kW
- My khoan
- My khoan 1,7kW
- My khoan 2,5kW
- My khoan 4,5kW
- My khoan BT <=1,5kW
- My khoan cm tay
- My khoan cm tay
- My lc tn 5kW
- My lu 10T
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
%
ca
ca
ca
ca
ca
ca
ca
ca
ca
77,550
201,155
81,621
85,755
937,889
74,882
2,360,524
3,846,259
1,698,037 Tham kho G H Tnh
1,698,037
1,698,037
1,698,037
1,201,958
556,575
108,663 Ly bng my lc tn
108,663
203,541
5,170,598 Khoan cc nhi ED
100,374
100,374
116,869
81,733
81,733
81,733
108,663
926,940
- My lu 8,5T
- My lu bnh lp 16T
- My lu rung 25T
- My mi
- My mi 2,7kW
- My nn kh 360m3/h
- My ri 50-60 m3/h
- My sng rung
- My sng rung
- My trc c
- My trn 250l
- My trn 80l
- My trn dung dch
- My i
- My i <=110CV
- My un tn
- My vn thng 0,8T
- My vn thng 3T
- My xc 1,25m3
- M cc loi
- Nhn cng 3,5/7
- Nhn cng 4/7
- Nhn cng 5/7
- Nha bitum
- Nha bitum s 4
- Nha bitum s 4
- Nc ngt
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
ca
kg
cng
cng
cng
kg
kg
kg
m3
775,635
1,048,082
1,265,810
71,672
71,672
574,525
2,972,867
334,868
334,868
916,386
127,722
87,216
209,395
1,479,430 Ly ca 130CV
1,479,430
108,663
198,974
274,062
1,315,736
13,800
69,936
75,039
87,077
87,500 Tham kho Mng Dng
87,500
87,500
4,500
- Nc ngt
- t 12T
- t 7 tn
- t chuyn trn
- t t
- t ti nc 5m3
- xy
- ng f300
- ng thp D50
- Palng xch 5T
- Phao thp 200T
- Ph gia
- Ph gia
- Ph gia CMC
- Ph gia CMC
- Que hn
- Que hn ng
- Que hn thp
- Rng gu hp kim
- Sn
- Sn Epoxy
- Sn lt
- Sn ph ngoi tri c bit
- T vt g
- Tng F14
- Tu cuc bin cng sut 2085CV
- Tu ko 150CV
m3
ca
ca
ca
ca
ca
chai
m
kg
ca
ca
kg
kg
kg
kg
kg
kg
kg
ci
kg
kg
kg
kg
ci
ci
ca
ca
4,500
1,234,259
897,133
1,244,295
1,073,690
626,838
60,000
402,500
8,603
68,202
207,874
6,624
6,624
7,618
7,618
17,000 TBG qu I/2008 ca UBND tnh H tnh
66,700
17,000 TBG qu III/2007 ca UBND tnh H tnh
250,000
25,000
70,000 Tham kho
46,500
70,000
138,000
11,500
37,179,546
1,738,983
- Tu lm neo, tu ko 360CV
- Than cm
- Thang leo, tay vn
- Thp gc 80x80mm
- Thp hp kim titan
- Thp hnh
- Thp ng (thang ti)
- Thp tm
- Thp trn <=10
- Thp trn <=18
- Thp trn >18
- Ti in 5T
Tn AUSNAM dy 0,53 mm
Tn AUSNAM dy 0,7 mm
Tn AUSNAM dy 0,7 mm
- Tn b=2mm
- Tn mi Ausnam 0,7mm
- Trm trn 16m3/h
- Trm trn 160m3/h
- Vi a k thut
- Vn thng 0,8T
- Vn thng lng <=3T
Vt
Vt
- X lan 200T
- X lan 400T
- X lan ch nc 250T
ca
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
ca
m2
m2
m2
kg
m2
ca
ca
m2
ca
ca
ci
ci
ca
ca
ca
2,834,172
575
13,015
9,915
32,082
15,315
15,315
16,315
15,215
15,015
14,915
122,199
200,000
270,000
270,000
200,000
270,000
1,048,061
6,981,909
25,000
198,974
464,992
3,500
3,500
640,465
977,547
770,542
2USD/kg
TBG T3/2008 ca UBND tnh H tnh
"
"
"
"
"
Tham kho HP2
"
"
"
"
- Xng
- Xi mng
- Xi mng PC40
- Xi mng trng
B m t + iu khin
Bc d & vn chuyn c c ly 10m
Bu lng M20x80
Dy thp D6-D8
m ta tu HC-100H, di 4,5m
n tn hiu 250W
inh tn F22
kg
kg
kg
kg
11,436
855 Bm Sn PC30 (TBG qu I/2008)
855 Nghi Sn PC40 (TBG qu I/2008)
2,500 Ata (TBG qu I/2008)
100m2
ci
kg
4,025
17,000 (TBG qu I/2008)
ci
2,185
Brance/Group
8. Capital construction,
material, china, glass
II
VI
VII
building
Group I
- Salary factor
Salary
factor
3
(10 VN)
Benefit
Local benefit
implementation
1.55
837,000
325,620
108,000
1.83
2.16
2.55
3.01
3.56
4.20
988,200 1,166,400 1,377,000 1,625,400 1,922,400 2,268,000
364,932
411,264
466,020
530,604
607,824
697,680
108,000
108,000
108,000
108,000
108,000
108,000
48,870
56,197
64,833
75,039
87,077
101,470
118,218
Group II
- Salary factor
Salary
factor
3
(10 VN)
Benefit
Local benefit
implementation
1.67
1.96
2.31
2.71
3.19
3.74
4.40
901,800 1,058,400 1,247,400 1,463,400 1,722,600 2,019,600 2,376,000
342,468
383,184
432,324
488,484
555,876
633,096
725,760
108,000
108,000
108,000
108,000
108,000
108,000
108,000
52,010
59,599
68,759
79,226
91,788
106,181
123,452
Group III
- Salary factor
Salary
factor
3
(10 VN)
Benefit
Local benefit
- Unit price/work day
implementation
1.85
2.18
2.56
3.01
3.54
4.17
4.90
999,000 1,177,200 1,382,400 1,625,400 1,911,600 2,251,800 2,646,000
367,740
414,072
467,424
530,604
605,016
693,468
795,960
108,000
108,000
108,000
108,000
108,000
108,000
108,000
56,721
65,357
75,301
87,077
100,947
117,433
136,537
Benefits include : Travelling benefit =20% minimum salary, productive unstability benefit =10% minimum salary, a
subsalary (Tet, holidays, ) =12% minimum salary, and several direct fixed rate = 4% salary factor
Local benefit = 20% minimum salary
XD.7.2-61
n v
n gi
Mc b tng
100
150
200
Cng
649,080 728,220
807,195
n v
n gi
Mc b tng
350
804,508
n v
n gi
AO30
Ct
Bt
Nha (9%)
Cng
m3
m3
kg
kg
80,000.00
90,000.00
4,600.00
6,600.00
T l phi hp %
5
10
15
n
v
n gi
Mc va
75
75
75
250
300
300
300
350
434
0.415
0.858
195
458
0.424
0.861
181
458
0.424
0.861
181
0-30)% c 1x2]
361
0.45
0.866
195
9.548
12.152
10.076
12.824
923,940
(60-30)% c 1x2]
25
0.16
0.194
236.175
30
0.192
0.233
283.41
70
0.447
0.543
88.35
667,740
M3 VA XY XI MNG CT VNG
Mc va
75
100
360.04
1.05
410.04
1.05
125
150
200
60
3,799,818
Items
I
II
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
XIV
XV
9,499,199,971
Manpower cost
Machine cost
25,187,738,043
2,518,773,804
27,706,511,847
6,492,495,517
9,791,769,882
18,483,854,405
1,848,385,441
20,332,239,846
848,743,553
6,728,848,842
19,383,431,557
1,938,343,156
21,321,774,713
14,723,858,597
1,472,385,860
16,196,244,457
2.3
No
XVI
Items
Manpower cost
Machine cost
2.4
Unit price
code
Items
Unit
Weight
I
I.1
I.2
I.3
I.4
I.5
I.6
II
Manpower
7
Amount (VND)
Machine
8
Material
9
Manpower
10
451,995,568,663 66,821,702,475
73,405,708,605
51,324,589,757
6,573,849,408
9,158,938,084
14,653,304,994
2,576,995,989
3,514,490,881
29,306,609,987
5,153,991,977
7,028,981,762
46,776,462,661
5,243,345,548
10,477,748,078
93,552,925,321 10,486,691,097
20,955,496,157
93,933,889,864 14,486,619,651
14,472,545,778
7,958,674,505
XD.4.2-5
Machine
11
842,510,723
1,454,600,250
III
III.1
III.2
IV
IV.1
IV.2
IV.3
V
V.1
V.2
Exhaust
gas
treatment system
ESP/FGD control house
Total
Hydrogent generation
house
Total
Raw water treatment
area
10
11
21,718,734,283
3,137,638,984
2,452,325,842
12,327,335,971
1,637,073,074
802,446,199
48,970,468,589
7,789,321,825
4,572,951,573
28,562,010,295
2,380,288,704
4,510,236,604
424,546,029
84,353,187
25,354,156
15,347,416,109
1,916,198,874
898,198,801
5,394,014,169
615,260,049
820,147,971
Raw
water
treatment
control
house (demineralization
house)
Total
Tanks of feed water
system
Total
Fire pump house
Total
Waste
water
treatment area
Waste water treatment
house
Total
Oil separated tank+
storage tank + wate
water tank
Total
XD.4.2-6
V.3
V.4
V.5
V.6
V.7
V.8
VI
VI.1
VI.2
Clarified tank
Total
10
11
1,110,819,791
125,473,347
380,608,964
488,668,896
83,280,939
54,956,088
1,069,372,316
120,935,930
362,417,963
567,104,023
95,183,418
198,981,123
Equalization tank
Total
365,485,004
64,059,049
40,372,481
516,624,395
87,946,221
163,053,775
14,708,252,857
1,662,444,164
1,622,905,224
24,390,886,145
2,966,207,713
1,479,563,823
XD.4.2-7
VI.3
VI.4
VI.5
VI.6
VII
VII.1
VII.2
VII.3
VII.4
XD.4.2-8
10
11
122,665,930,864 13,141,971,973
17,595,802,567
245,331,861,727 26,283,943,946
35,191,605,134
11,611,639,137
264,385,968
305,735,136
4,495,202,402
609,681,907
9,107,451,341
120,170,800,679 13,250,390,913
73,828,970,104
8,238,616,680
1,180,249,396
1,591,088,042
15,503,638,376
1,309,661,910
2,437,715,017
126,397,454,030 47,052,357,708
49,616,761,700
VII.5
VII.6
VIII
VIII.1
VIII.2
VIII.3
VIII.4
IX
IX.1
IX.2
10
11
Total
39,819,174,252
3,351,247,603
5,234,329,033
2,313,631,849
325,853,535
945,098,720
2,625,602,339
862,695,092
375,821,978
CW system
CW pum house
Total
72,295,093,994
6,369,953,679
7,632,513,910
CW piping
Total
70,821,859,215
4,247,762,358
12,119,861,575
161,618,441,214 14,943,972,698
15,434,638,908
CW discharge channel
Length of channel
Total
1,729.73
Chlorine house
Total
1,217,589,873
264,115,811
135,153,123
Oil system
Lubricant & DO storage
Total
1,127,224,661
54,510,114
128,768,351
FO storage
Total
4,321,176,792
374,715,382
557,790,859
XD.4.2-9
IX.3
X
X.1
X.2
X.3
X.4
X.5
X.6
XI
XI.1
10
11
1,836,476,777
323,853,912
152,734,754
Administration
&
service area
Administration house
Total
18,228,875,185
3,558,360,448
2,604,732,760
3,441,207,363
678,088,741
224,251,581
Garage (estimated)
Total
2,073,570,072
379,612,503
259,421,027
Motor
(estimated)
Total
1,413,394,915
196,760,534
201,661,004
6,714,060,009
1,397,519,217
612,186,700
23,193,477,339
3,471,729,421
1,091,573,572
house
XD.4.2-10
XI.3
XII
XII.1
XII.2
XII.3
XIII
10
11
1,362,983,384
192,185,265
158,128,638
Material storage
Total
6,995,728,071
3,090,228,468
627,895,604
Maintenance workshop
: (66x25x9,07 m)
Total
7,135,859,715
1,190,508,946
701,213,190
Infrastructure
Green plants
Total
2,271,562,230
1,027,196,652
2,054,473,187
Total
9,039,670,125
1,792,814,233
1,234,707,225
4,101,513,396
5,513,057,776
11,495,087,857
6,492,495,517
9,791,769,882
Total
XI.2
Pathway
Load
&
unload
material works
Total
XD.4.2-11