QFM-DKN-25-01 JOB SAFETY ANALYSIS Rev: 0 Date: 19.11.

2012 Page : 1 of 6

PETROSERV LIMITED

RISK MATRIX

PROJECT/JOB DETAILS
Project Ref./ Job Title / Work Order:
E Occurs several times a year at this site Low 3475 / GC 12104700

DATE: 19/11/2012
JSA No: REVISION:

INCREASING PROBABILITY
Potential Severity People Asset / Production Environment Reputation A Never heard of in industry B Has Occurred in Industry C Has Occurred in QP D Occurs several times a year in QP Low

Brief Description of job: Painting Job Location : Dukhan Hazard Area Classification: Permit Requirements: Hot/cold/Radiography Participants(parties involved in JSA)

No Injury

No damage

No affect

No Impact

No Risk

Low

Low

Sponsoring Department: Performing Department: Permit Authority JSAApproved by

Slight injury or health effects Minor injury or health effects Major Fatality or permanent total disability Single fatality or permanent total disability Multiple fatalities

Slight damage, No disruption to operation

Slight effect

Slight impact

Low

Low

Low

Low

Low

Minor damage (=QR 250,000)

Minor effect

Limited impact

Low

Low

Medium

Medium

Medium

Major damage (=QR 1,300,000)

Localized Effect

National impact

Low

Medium

Medium

Medium

High

All the mitigation measures identified in JSA are in place before starting the activates

Major damage (=25,000,000)

Major effect

Regional Impact

Low

Medium

Medium

High

High

Work site supervisor

Extensive damage(=25,000,000)

Massive Effect

International Impact

Medium

Medium

High

High

High

Probability Factor

QFM-DKN-25-01 JOB SAFETY ANALYSIS Rev: 0 Date: 19.11.2012 Page : 2 of 6

PETROSERV LIMITED

Sl. No. 1

Activity (Job Steps )

Potential Hazards

Severity Before Mitigation


P= 3C(M) A=2B (M) E= 2B(M) R= 2C(M) P= 2C (M) A= 0B (L) E= 0A(NR) R= 1B(L)

Required Control/Mitigation Measures


Get Authorization of work permit Have a clear understanding of work to be performed and location Attention to be paid on uneven terrain structure. Hold pre-job safety meeting Get Authorization of work permit Site safety rules shall be followed Hold pre-job safety meeting Check with operations Identify potential Plant Hazards i.e. (critical valves that can be knocked or damaged while passing). Appropriate PPE shall be used Get Authorization of work permit Carry out gas test before entry. Use personal H2S monitor in hazardous area If required, go for continuous gas test. Maintain gas leak awareness by location and wind direction. If monitor warning actuates leave area and use a predetermined escape route across wind Marking off hazardous areas

Severity After Mitigation


P= 1C(L) A= 1A(L) E= 1A(L) R= 1C(L) P= 1C(L) A= 0A(NR) E= 0A(NR) R= 0B(L)

Action Party

Raise relevant permit clearance

Incorrect information on permit/clearance

Supervisor, Safety Officer

Site Preparation

Ground conditions

Site Engineer, Supervisor.

Plant Hazards

P= 2C (M) A= 0B (L) E= 0A(NR) R= 1B(L)

P= 1C(L) A= 0A(NR) E= 0A(NR) R= 0B(L)

Supervisor

Exposure to Hazardous gases

P= 3C(M) A= 0A(NR) E= 0A(NR) R= 2C(M)

P= 1C(L) A= 0A(NR) E= 0A(NR) R= 1C(L)

Site Engineer, Supervisor, Safety Officer.

QFM-DKN-25-01 JOB SAFETY ANALYSIS Rev: 0 Date: 19.11.2012 Page : 3 of 6

PETROSERV LIMITED

Transportation

P= 3C (M) A= 3C (M) E= 2C(M) R= 2C(M)

Traffic rules & regulations shall be followed Inspection and maintenance of vehicle shall be done periodically All loads transported in a pick-up (or utility) truck or other cargo vehicle shall be securely fastened and shall not exceed the manufacturers load specifications and legal limits for the vehicles Shut off the engine and hand brake shall be applied when leaving the vehicle, the driver must leave his vehicle and not return to it until the loading / unloading activity is complete. Ensure that sub-contractors shall follow traffic Rules & Regulations Try to use trolleys or wheelbarrows if possible. If required use lifting equipment to unload materials from vehicle. Personnel shall follow proper lifting techniques When lifting a load with another person(s), communicate with the other person(s) before lowering your end of the load. Do not try lifting a load that is too heavy ask for help Do not twist your body while carrying a heavy load Appropriate PPE shall be used

P= 1C (L) A= 1C (L) E= 1C(L) R= 1B(L)

Supervisor.

Material Handling (Manual)

P= 3C (M) A= 1C (L) E= 1C(L) R= 1B(L)

P= 1C (L) A= 0B (NR) E= 0A(NR) R= 0B(L)

Supervisor.

QFM-DKN-25-01 JOB SAFETY ANALYSIS Rev: 0 Date: 19.11.2012 Page : 4 of 6

PETROSERV LIMITED

Defective Tools / Equipment

P= 3C (M) A= 2C (M) E= 2C(M) R= 2B(M)

Ensure the equipment / tool to be used for painting (such as Spray Paint Gun, Hoses, pump etc.) are free from defect. The equipment and tools are adequately bonded to prevent accumulation of electrostatic charges. Maintenance shall be done regularly. Required PPE shall be used. Work shall be done by certified personnel Obtain MSDS for the paint as well as thinner. Wear the required PPE (Long Sleeve Coverall, Apron, Face Shield & suitable respiratory protection etc.). Ensure proper ventilation of the area. Store paint & thinners in safe & designated location away from source of ignition. Do not leave unattended the Spray Paint Gun & Hose with on condition. Ensure there is no naked flame or spark generating equipment in the area where spray painting is to be done. Never smoke in the area where spray painting is in progress. Keep the suitable fire extinguishers ready

P= 1C (L) A= 0B (L) E= 1B(L) R= 1B(L)

Supervisor, Painter

Painting

Harmful vapour

P= 3C (M) A= 0A (NR) E= 1C(L) R= 2B(L)

P= 1C (L) A= 0A (NR) E= 1A(L) R= 1B(L)

Supervisor, painter

Fire & Explosion

P= 3C (M) A= 3C (M) E= 3C(M) R= 2C(M)

P= 1C (L) A= 1C (L) E= 1B(L) R= 1B(L)

Supervisor, safety officer

QFM-DKN-25-01 JOB SAFETY ANALYSIS Rev: 0 Date: 19.11.2012 Page : 5 of 6

PETROSERV LIMITED

Isolate the equipment from all source of energy when not in use. Fire fighting & first aid training shall be provided Contaminated Clothing P= 3C (M) A= 0A (NR) E= 1C(L) R= 2C(M) Do not eat or smoke wearing a paint soaked coverall / gloves Clean / dispose safely the paint soaked coverall / gloves. Wash properly before consuming any food. Provide washing & cleaning facilities for personnel Un-attended Equipment / Tool P= 2C (M) A= 2C (M) E= 1C(L) R= 1C(M) Do not leave unattended the Spray Paint Gun & Hose with on condition. Isolate the equipment from all source of energy when not in use. Supervisor shall ensure the prior to leaving the site, equipment is shut off and tools are kept at safe or designated area Store the paint & thinners in safe & designated location away from source of ignition. Do not leave unattended the Spray Paint Gun & Hose with on condition. Isolate the equipment from all source of energy when not in use. Illumination P= 2C (M) Supervisor shall ensure that P= 1C (L) supervisor P= 1C (L) A= 1A(L) E= 0A(NR) R= 1A(L) supervisor P= 1C (L) A= 0A(NR) E= 0A(NR) R= 1B(L) PM, Supervisor

Unsafe Storage of Paint & Thinner

P= 2C (M) A= 2C (M) E= 1C(L) R= 1C(M)

P= 1C (L) A= 1A(L) E= 0A(NR) R= 1A(L)

Supervisor, safety officer

QFM-DKN-25-01 JOB SAFETY ANALYSIS Rev: 0 Date: 19.11.2012 Page : 6 of 6

PETROSERV LIMITED

A= 2C (M) E= 1C(L) R= 1C(M)

adequate lighting is available during painting activity. If required temporary lighting shall be provided. Ensure proper wind up & housekeeping at worksite. Spillages paints & thinner must be cleaned up as soon as is practicable. The accessories (spray paint gun, hoses & pump) not being used must be disconnected and stored separately. Keep walk ways, aisle, and staircases clear of materials, equipments and other items

A= 1A(L) E= 0A(NR) R= 1A(L) P= 1C (L) A= 1A(L) E= 1B(L) R= 1A(L) supervisor

Windup & Housekeeping

Scattered Material

P= 2C (M) A= 2C (M) E= 2C(L) R= 1C(M)

JOB SAFETY ANALYSIS Job steps: List the main sequential steps. Each step should be analyzed with the associated risk involved and its severity Alternative Considered: What are the possible means of achieving the job outcome with less risks Now undertake the JAS and record in the table above. Using JSA Hazard Checklist, Critical Question & Risk Assessment tables.