Beruflich Dokumente
Kultur Dokumente
WastetoEnergy
CeljeWtECHPPlant
January2010
WasteManagmentStrategy g gy
Wastemanagementstrategyinaccordancewith Waste management strategy in accordance with Europeandirective 91/156/EEC:
1. 1 2. 3. 4. 5.
RegionalWasteManagment g g
Sewage treatment plant MUNICIPALSOLIDWASTE(MSW)
Residual Waste Biodegradable Waste Sorted Recyclabe Waste Sorting
Waste
MBT
Composting
Sewage Sludge
Light fraction
Landfill
Sorted materials
Ash&Slag
Processing g
POWER
HEAT
MARKET
Energy
KIVWtETechnology gy
ELECTRICITY STEAM / HEAT CONTINUOUS EMMISION MONITORING AND SYSTEM CONTROL C H I M N E Y
FUEL PREPARATION
d 2nd STAGE:
OXIDATION
STEAM GENERATION
CeljeWastetoEnergyCHPPlant j gy
Plantpriorities: Plant priorities: 1. 2. 3. Disposal ofwaste Heatrecovery fordistrictheating Powerproduction
TechnicalData
Throughput: g p DesignpointfuelCV: Boilerthermaloutput: Steamparameters: Steamturbineoutput: Operationmodes: Operation: 35.000t/a / 13,6MJ/kg 15MWth 20t/h,30bara,360C 2,1MWe 13MWth (110C)+2MWe 15MWth (130C)+0MWe 24h/day;8.000hours/year / / Compliantwith: EUDirectives (WID,IPPC) &Local legislation EUBestAvailableTechniquesReference(BREF)document BestAvailableTechnology(BAT) B t A il bl T h l (BAT)
ProcessScheme
15 Flyashsilo 15 Fly ash silo 16 Activatedcarbonfilter 17 Fluegasfan 18 Stack 19 Controlsystem 19 Control system 20 Continuousemission monitoring
FuelStorage g
Fueldelivery: Fuel delivery: RDF:40times/week / SS:5times/week
Fuelstoragecap.: Fuel storage cap : RDF:1400m3 SS:85m SS: 85 m3 Sufficientfor4days. Interm.storage: Volume:25m3 Intermediate(mixing)storage
Boiler
Fuelinputcapacity:18MW Fuel input capacity: 18 MW Boilercapacity:15MWth (watertubeboiler)
Boilerroom
Fluegasscrubbing g g
SNCR Ammoniasolution: reductionofNOX Dryfluegasscrubbing Sodiumbicarb.powderfor reductionofacidgases: SO2,HClandHF HCl d HF Activatedcarbonpowder: p eliminationofheavymetals &dioxins/furans Filters Ceramicfilter Activatedcarbonfilter Activatedcarbonfilter,CEMSandstack
Ceramicfilter
Ceramicfilter: Ceramic filter: Particlereduction:~99,9% p No.ofpods:12 No.ofelements:4800
Ceramicfilterandflyashsilo
ActivatedCarbonFilter
Activatedcarbonfilter : Activated carbon filter*: ReductionofTOC,dioxins, furansandheavymetals includingHg. No.ofpods:21
*KIVpatentedtechnology
Activatedcarbonfilter
CEMSandStack
FlueGasFan: Flue Gas Fan: Volumeflow:cca.33.000Nm3/h ContinuousEmissionMonitoring(CEM): Continuous Emission Monitoring (CEM): CO,NO,NO2,O2,SO2,HCl,HF,TOC, Hg,NH3,moisture,dust,temperature, pressure,massflow Stack: Height:25m H i ht 25
CEMSandstack
EmissionLimits
LowerthanWIDemissionlimits! Lower than WID emission limits!
Parameter Dust Totalorganiccarbon(TOC) Hydrochloricacid(HCl) Hydrofluoricacid(HF) Sulphurdioxide(SO2) nitrogenoxides(NO2) Carbonmonoxide(CO) Heavymetals: Hg CdandTl(total) Sb,As,Pb,Cr,Co, Cu,Mn,Ni,V,Sn(total) As,Cd,Co,CrorAs,Cd, Co,Cr(total) Dioxinsandfurans Halfhourmeanvalues (mg/Nm3) WIDlimits Celjelimits 30 20 20 20 60 50 4 2 200 150 400 350 100 100
0,05
0,1ngTE /Nm3
Input/Output p p
13MWth 2,1MWe
~500kW
Birds y Birdseyeview
CeljeWtECHPPlant: j MunicipalSolidWaste(MSW)from220.000citizensforCombined HeatandPower(CHP)productionfortheMunicipalityofCelje.
Locationoftheplant
Satelliteview
ProximityofCelje centre: minimiseddistributionlosses andtransportcosts!!
CeljeWtECHPplant
Locationoftheplant
Benefits
Positiveenvironmentalandeconomicalbenefits: Positive environmental and economical benefits: Reductionoflandfilledwaste:~65% 100%disposaloflocalsewagesludge(40%ash residual) 100% di l fl l l d (40% h id l) Wastefromlocalpopulationgivenbackaselectricity/heat Minimisedwaste transport Netfossilfuelsavings (heating): ~4.000.000Sm3/year (naturalgas) Reductionofgreenhousegases Optimalutilizationofheatandelectricity(proximityofCelje)
Contact