DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA.

Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl.No. 1 1 Particulars & Details of work 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet 4 Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items 1.4 0.900 4.800 0.785 1.4 1.4 1.4 1.4 1.4 0.900 0.900 0.900 0.900 0.900 1.5 1.5 1.5 0.75 0.2 L (m) 3 0.450 0.600 5.250 0.900 0.580 B (m) 4

1.4

H (m) 5

Quantity 6

2 3

4.660 4.160 3.660 3.160 2.460

4.160 3.660 3.160 2.660 2.96

1.50 1.50 1.50 1.10

29.078 22.838 17.348 9.246 7.282

2.76

2.26

0.2

1.248 0.404 8.524 1.904 3.150 4.444 3.010 0.252 19.782 22.080

5 6 7 8

23

Nos

23.000

1 1 Job

1.000 1.000

10

DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA. Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl.No. 1 1 Particulars & Details of work 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m 5 6 7 8 RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items L (m) 3 0.450 0.600 3.750 0.900 0.460 B (m) 4

1.4

H (m) 5

Quantity 6

2 3

4.160 3.660 3.160 0.000 2.220

3.660 3.160 2.660 0.000 2.72

1.50 1.50 1.15 0.00

22.838 17.348 9.666 0.000 6.038

2.52 0.785

2.02

0.2

1.018 0.404 8.524

1.4 1.4 1.4 1.4 1.4 1.4

0.900 0.900 0.900 0.900 0.900 0.900

1.5 1.5 0.6 0 0.2 3.300

1.904 3.150 1.777 0.000 0.252 19.782 15.180

18

Nos

18.000

10

1 1

Job

1.000 1.000

DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA. Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl.No. 1 1 Particulars & Details of work 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m 5 6 7 8 RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items L (m) 3 0.450 0.600 2.250 0.900 0.350 B (m) 4

1.2

H (m) 5

Quantity 6

3.460 2.960

3.160 2.660

1.50 1.15 0.00 0.00

2 3

2.000

2.3

16.400 9.055 0.000 0.000 4.600

2.1 0.785

1.8

0.2

0.756 0.323 8.524

1.4 1.4 1.4 1.4 1.2 1.2

0.900 0.900 0.900 0.900 0.900 0.900

1.5 0.6 0 0 0.2 1.800

1.904 1.260 0.000 0.000 0.216 16.956 7.560

13

Nos

13.000

10

1 1

Job

1.000 1.000

DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA. Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl.No. 1 1 Particulars & Details of work 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items L (m) 3 0.450 0.600 1.000 0.900 0.230 B (m) 4

1.2

H (m) 5

Quantity 6

2 3

2.260 1.760

1.960 2.06

1.40

6.201 3.626

1.86 0.785

1.56

0.2

0.580 0.323 8.524

5 6 7 8

1.2 1.2 1.2

0.900 0.900 0.900

1.5 0.2 0.550

1.766 0.216 16.956 2.310

Nos

6.000

10

1 1

Job

1.000 1.000

DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA. Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl. No. 1 1 Particulars 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet 4 Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items Total Say Rs Quantity 3 0.450 0.600 5.250 0.900 0.580 Unit 4

1.4

Rate 5

Amount 6

2 3

29.078 22.838 17.348 9.246 7.282

m3 m3 m3 m3 m2

102.65 129.45 162.91 191.21


319.20

2984.898 2956.431 2826.228 1767.958 2324.287

1.248 0.404

m3 m3

5483.30 5483.30

6840.524 2217.127

5 6 7 8

1.904 3.150 4.444 3.010 0.252 19.782 22.080

m3 m3 m3 m3 m3 kg m2

3488.76 3593.42 3732.97 3907.41 9769.83 97.70 119.40

6643.997 11319.286 16587.845 11762.093 2461.998 1932.668 2636.458 4600.000

23.000 Nos. 1.000 Nos. 1.000 Job 2500.00 1139 200.00

2500.000

10

1139.000 83500.797 83500.00

DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA. Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl. No. 1 1 Particulars 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m 5 6 7 8 RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items Total Quantity 3 0.450 0.600 3.750 0.900 0.460 Unit 4

1.4

Rate 5

Amount 6

2 3

22.838 17.348 9.666 0.000 6.038

m3 m3 m3 m3 m2

102.65 129.45 162.91 191.21


319.20

2344.362 2245.750 1574.760 0.000 1927.457

1.018 0.404

m3 m3

5483.30 5483.30

5582.436 2217.127

1.904 3.150 1.777 0.000 0.252 19.782 15.180 18.000

m3 m3 m3 m3 m3 kg m2

3488.76 3593.42 3732.97 3907.41 9769.83 97.70 119.40

6643.997 11319.286 6635.138 0.000 2461.998 1932.668 1812.565 3600.000

Nos. 1.000 Nos. Job

200.00 2500.000 2500.00 2203 Say Rs

10

1.000

2203.000 55000.543 55000.00

DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA. Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl. No. 1 1 Particulars 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m 1.5 to 3.0m 3.0 to 4.5m 4.5 to 6.0m 5 6 7 8 RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items Total Quantity 3 0.450 0.600 2.250 0.900 0.350 Unit 4

1.2

Rate 5

Amount 6

2 3

16.400 9.055 0.000 0.000 4.600

m3 m3 m3 m3 m2

102.65 129.45 162.91 191.21


319.20

1683.501 1172.123 0.000 0.000 1468.320

0.756 0.323

m3 m3

5483.30 5483.30

4145.373 1772.980

1.904 1.260 0.000 0.000 0.216 16.956 7.560 13.000

m3 m3 m3 m3 m3 kg m2

3488.76 3593.42 3732.97 3907.41 9769.83 97.70 119.40

6643.997 4527.714 0.000 0.000 2110.284 1656.573 902.700 2600.000

Nos. 1.000 Nos. Job

200.00 2500.000 2500.00 1317 Say Rs

10

1.000

1317.000 32500.565 32500.00

DETAILED MEASUREMENT OF RECTANGULAR BRICK MANHOLE FOR GIVEN SIZE & DEPTH DIA. Sewer (m) Outer Dia of Pipe (m) average depth (m) Size of manhole (m) Wall thickness (m) Sl. No. 1 1 Particulars 2 Excavation of earth in ordinary soil including lift upto 1.5m. and led upto 50m. and filling watering, ramming the earth into the trenches and disposal of surplus earth upto distance of 60m. 0.0 to 1.5m Dry brick soaling PCC work with 20mm stone ballast, coarse sand & cement in proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of work. Base Slab Cunet Brick work in 1:4 cement & coarse sand including supply of all materials, labour, T&P etc. complete. 0.0 to 1.5m 5 6 7 8 RCC work in M 20 grade concrete MS work in Reinforcement for RCC work @ 1% Plastering with 1:4 cement & coarse sand mortar including finishing with neat cement Provide and fix foot steps ( @ 300mm c/c in two rows ) in M.H. in proper position as per direction of Engineer incharge. Supply and fixing of 0.6m diameter circular Precast Concrete pattern manhole cover with frame and locking arrangement and complete. Misc Unforeseen items Total Quantity 3 0.450 0.600 1.000 0.900 0.230 Unit 4

1.2

Rate 5

Amount 6

2 3

6.201 3.626

m3 m2

102.65 319.20

636.578 1157.292

0.580 0.323

m3 m3

5483.30 5483.30

3182.068 1772.980

1.766 0.216 16.956 2.310 6.000

m3 m3 kg m2

3488.76 9769.83 97.70 119.40

6162.546 2110.284 1656.573 275.825 1200.000

Nos. 1.000 Nos. Job

200.00 2500.000 2500.00 846.000 Say Rs

10

1.000

846.000 21500.144 21500.00