Beruflich Dokumente
Kultur Dokumente
POWER
25
With our recognised expertise all over the power generation market, we are able to find solutions to the challenges of today.
The LaRgeST PORTFOLIO FOR NUCLeaR POweR SOLUTIONS ARABELLETM sTEAM TuRBinEs geNeRaTORS heaT exChaNgeRS PUmPS emeRgeNCy DIeSeL geNeRaTORS aUTOmaTION aND CONTROL SeRvICeS
52,000 100
We recognise the need to improve the environmental balance of legacy plants while increasing adoption of new clean energy solutions.
PLANT INTEGRATOR
Our solutions maximise performance by optimising the complex interactions between sub-systems from design to operation.
LIFECYCLE MANAGEMENT
At all stages of the lifecycle we support owners to maximise their return on investment while minimising negative environmental effects.
Alstom is the N1 supplier of nuclear steam turbines. Today, 30% of all operating nuclear power plants in the world have an alstom steam turbine generator inside, and 40% of them use alstom-made equipment.
An advanced technology
Alstoms nuclear power conversion solutions are based on its ARABELLE steam turbine technology platform. With its superior performance and exceptional reliability ARABELLE steam turbines can accommodate power outputs ranging from 900 MW to 1,900 MW. The largest turbines in operation worldwide for the past 10 years are ARABELLE steam turbines with a 1,550 MW power output provided with extremely high reliability (99.96%).
ARABELLE
ARABELLE is not just a product. it is a family of cutting-edge products. Alstoms integration capabilities are built on the solid foundation of a full in-house product range covering the key components of nuclear plant turbine islands. The focus is on the performance improvements that can be obtained from the ARABELLE steam turbine through optimal compatibility with the turbogenerator, the moisture separation reheaters and the condenser to get more than just the sum of the key components and ultimately optimise the power conversion from the nuclear reactors steam.
get more
Key benefits
MoRE MW A compact, powerful, efficient and reliable turbine 60% of the power comes from highly efficient single flow expansion A unique combined HP/IP module Standard interface / footprint for 50 Hz & 60 Hz Based on mature 1,550 MW units AdAPTEd To ALL REACToR TyPEs Fully adaptable steam path From 900 MW to 1,900 MW, 50 Hz or 60 Hz For any backpressure conditions Co-generation applications LP sizE oPTiMisEd foR ANy siTE CoNdiTioNs Various last-stage blade sizes for each frequency (50 Hz and 60 Hz) A blade design that has demonstrated its reliability Two, three or four LP modules for optimum vacuum fit WELdEd RoToRs foR RELiABiLiTy ANd sECURE dELivERy High resistance to stress corrosion cracking (SCC) Excellent reliability, fewer inspections required Smaller forgings easier to supply and inspect dEsigNEd foR EAsE of MAiNTENANCE Easy access for maintenance Easy adjustment of LPs with independent structure Compact arrangement with fewer bladed rows
with more than 300,000 operating hours accumulated and an outstanding reliability rate, ARABELLE is the most advanced steam turbine technology for your nuclear power plant.
4
turbine-generator package:
Process equipment
alstom has extensive know-how in heat exchange across all types of power plants, including nuclear applications. alstom nuclear heat exchangers are adaptable to any reactor output level, delivering maximum performance and reliability, facilitating maintenance.
alstom tailor-made pumps offer an outstanding reliability, efficiency and cost-effectiveness. Our extended pumps portfolio of products for nuclear power plants includes among others: circulating water pumps, condensate extraction pumps, feed-water pumps.
ARABELLE
a proven
MSR
HP
IP
LP 1
LP 2
LP 3
MSR
Former configuration
MSR HP 2F
An innovative architecture
Former conguration offers a new architecture where the The ARABELLE turbine
Previous-generation nuclear turbines feature one double-flow high-pressure (HP) cylinder followed by four or six low-pressure (LP) flows (with two or three LPs, respectively) for final expansion to the condenser.
LP 1
LP 2
LP 3
MSR
steam first expands in a single-flow HP path; after moisture separation and reheat, it then expands in a single-flow intermediate-pressure (iP) section before going through the four or six low pressure (LP) flows.
HP
IP
LP 1
LP 2
LP 3
Arabelle Unique The LP steam admission pipes are entirely below the turbine operating conguration
floor. This arrangement helps reduce maintenance duration and cost, because maintenance of the LPs does not require disassembly of their inlet pipes. Large lay-down areas are thus available alongside the LP cylinders, further facilitating maintenance.
MSR
MSR HP 2F
LP 1
LP 2
LP 3
Former conguration
Alstom has leveraged over 35 years of experience in nuclear power plants, and more than 100 years in steam turbine technology, to develop and continuously improve its efficient and reliable turbine blade family.
Stage Efciency
A worldwide footprint
The Alstom Power nuclear business is headquartered in Levallois near Paris, (France). Engineering centres specialised in nuclear equipment are to be found in Levallois (France), Baden (Switzerland), Wuhan (China), Saint Petersburg, Joint-Venture AAEM (Russia), and Chattanooga (usA). Manufacturing location dedicated to nuclear power technology are in Portugal, Poland, Russia, China, usA and Mexico, as well, as in France. Together with the support of local service centres in 70 countries, Alstom Power can deliver rapid nuclear services across the globe.
morelia, mexico Chattanooga, USa Setubal, Portugal Bexbach, germany wroclaw, Poland elblag, Poland St. Petersbourg, Joint-venture aaem Russia Podolsk, Russia
Delhi, India
References
BALTiC, russiA LIng Ao PHASE II, ChinA
2 x 1,200 MW nuclear turbine islands The alstom-atomenergomash (aaem) Joint-venture was selected by Rosatom, the Russian federal nuclear agency, to deliver the turbine islands of the Baltic nuclear power plant to be constructed in Kaliningrad, Russia. This is the first major contract won by the Joint-venture created in 2007 by alstom with atomenergomash to supply the turbine islands to Russian nuclear power plants. The plant will be based on the Russian vveR 1200 pressurised water reactor design. aaems scope includes the supply of both units turbine hall, including the alstom aRaBeLLe steam turbines, generators and their associated auxiliaries, the moisture separator reheaters (mSR), the condenser and feed-water heating plant equipment.
2 x 1,080 MW turbine generator package Ling ao 3+4 turbine generator packages for 2,160 mw turbine islands were ordered in 2005. Featuring aRaBeLLe technology, the units started successfully in 2010 for the unit 3 and 2011 for the unit 4, ahead of the schedule and theirs measured power outpots are higher than the guaranteed level. For this project, a significant transfer of technology and manufacturing sharing with our long term partner DeCL has been implemented. Leveraging on this solution, several similar projects are under construction in china, such as hongyanhe, Ningde, or Fangjiashan, among others.
FLAMAnVILLE 3, FrAnCe
1,750 MW nuclear turbine island Flamanville 1+2 started commercial operation in 1985 with two 1,350 mw units. The reactors are of the four-loop areva P4 type. Under a number of separate contracts, alstom designed, delivered and erected the turbogenerators, plus the bulk of the turbine island mechanical and electrical auxiliaries, including condensers, feedwater reheaters, and condensate extraction and circulating water pumps. a power plant extension is now under construction. It will include one aRaBeLLe steam turbine (unit 3), delivering 1,750 mw from the new ePR (evolutionary Pressurized Reactor) from areva. when commissioned this will be the highest power output in the world from a single turbinegenerator set. alstom has designed, delivered and erected the complete turbine island, including the condensate extraction pumps, circulating water pumps and emergency diesel generator sets.
10
TPW/BPRoB/RBLSTn12/eng/THP/05.12/FR/7612 ALSToM 2012. All rights reserved. Information contained in this document is indicative only. no representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. it is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Photo credits: 2007 Bryon Paul McCartney | www.atelier-mccartney.com, Alstom and others. Layout and realisation: Les ditions stratgiques
Alstom contributes to the protection of the environment. This brochure is printed on environmentally-friendly paper.
www.alstom.com
Alstom ( France ) 3 avenue Andr Malraux 92309 Levallois Perret Cedex Tel: +33 1 41 49 20 00