ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)

FUEL ( OIL & GAS ) SYSTEMS MTO & PRICE LIST


Rev 0 Page 16 of 37 FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)

I. SCHEDULE OF PRICE- Details

Fuel Gas System


Item No. Description Data sheet No./ Note 5 Unit Quantity Supply Price Unit Total price Price Erection Price Unit Total price Price Supply + erection Unit Total price Price Remark

Supply & erection of mechanical item

1.

2 2.1
Rev 0

Supply fabrication erection either inside the building, in yard as per relevant specification including supply and fixing of all fitting as required including supply of welding consumables, painting (for over-ground piping) including supply of paints, wrapping and coating (for buried piping) securing the pipe run with suitable supports, inspection, hydrostatic & pneumatic testing including cost of labor and supervision all as directed and specified. High pressure system ( class- 3) Piping

CL-3

Page 17 of 37

FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
I. SCHEDULE OF PRICE- Details

Fuel Gas System


Item No. 2.1.1 2.1.2 2.1.3 2.1.4 Description Data sheet No./ Note 5 Unit Quantity Supply Price Unit Total price Price Erection Price Unit Total price Price Supply + erection Unit Total price Price Remark

2.1.5

2.1.6

2.1.7

DN 350, API 5L Gr.B, ERW, Sch.STD DN 300, API 5L Gr.B, ERW, Sch.STD DN 200, A106 Gr.B, SMLS, Sch.30 DN 20, A106 Gr.B , SMLS , Sch.80 Elbow 90 , DN350 Tee red. 450x350 Red. 350x300 Ball valves DN 350, A216 WCB, GEAR OPERATION, BALL: S.S 304 +13%Cr., STEM: S.S , DESIGN & TEST: BS5351, DEVICE AND FIRE SAFE DESING DN 200, A216 WCB, GEAR OPERATION, BALL: S.S 304 +13%Cr., STEM: S.S , DESIGN & TEST: BS5351, DEVICE AND FIRE SAFE DESING DN150, A216 WCB, GEAR OPERATION, BALL: S.S 304 +13%Cr., STEM: S.S , DESIGN & TEST: BS5351, DEVICE AND FIRE SAFE DESING

meters meters meters meters

1100 36 24 12 lot 1 1 3

No. No. No. B-23 No.

No.

No.

Rev 0

Page 18 of 37

FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
I. SCHEDULE OF PRICE- Details

Fuel Gas System


Item No. 2.1.8 2.1.9 3 3.1 3.1.1 3.1.2 3.1.3 4 Description Data sheet No./ Note 5 Unit Quantity Supply Price Unit Total price Price Erection Price Unit Total price Price Supply + erection Unit Total price Price Remark

DN20 DN 25 Low pressure gas system Piping DN 40, A106 Gr.B , SMLS, Sch.80 Globe valve DN 40 Domestic gas regulator DN40 , Capacity 250 m3/hr Supports Primary supports

B-21 CL-2A

No. No.

8 4

meters

300 3 1
*The quantity of supports are preliminary, they shall be finalized by contractor.

B-22A
No.

No.

Kg Kg Lot Lot Lot Lot

lot lot

Clamps, saddles, etc. Structure items

5 5.1 5.2 5.3 5.4

Secondary supports Instrumentation & control items Field instruments as per P&ID for Unloading, P&ID of forwarding and Natural Gas System P&ID I&C cables, cable trays & accessories Junction boxes Instrument installation materials

1 1 1 1

Rev 0

Page 19 of 37

FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
I. SCHEDULE OF PRICE- Details

Fuel Gas System


Item No. Description Data sheet No./ Note 5 Unit Quantity Supply Price Unit Total price Price Erection Price Unit Total price Price Supply + erection Unit Total price Price Remark

5.5

6 6.1 6.2 6.3 6.3.1 6.3.2 6.3.3 6.4 6.5

Local control panel (Unloading PLC panel (for 7 storage Tanks), Forwarding Aux. Indication Panel, Forwarding Marshaling Panel Supply & erection of electrical items Electrical Panels Cables Cabling accessories Trays including support, bracket and other accessories Ladders including support, bracket and other accessories Conduits Secondary grounding Cathodic Protection (if required)

No.

Nos. m m m m

Rev 0

Page 20 of 37

FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)

SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price 1. 2. Supply and erection of mechanical items Supply, fabrication, erection either inside the building, on pipe rack or in yard as per relevant specification including supply and fixing of all fitting as required including supply of welding consumables, painting including supply of paints securing the pipe run with suitable supports, hydro static testing including cost of labor and supervision all as directed and specified. Fuel Oil Storage System Total Price Erection Price Unit Price Total Price Supply + erection Unit Total Price Price Remark

Supply, fabrication, erection of supports and supply and application of insulation is paid separately.

4
Rev 0

Fuel oil forwarding


Page 21 of 37 FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price 4.1 Fuel oil forwarding including all items : electropumps, base frames, couplings, instruments, interconnecting piping etc., Only erection and commissioning and related piping (not supplying) Duplex filter Only erection and commissioning and related piping (not supplying) Motorized 3way valve , BALL: S.S 304 +13%Cr., STEM: S.S , DESIGN & TEST: BS5351, DEVICE AND FIRE SAFE DESING , DN100 Only erection and commissioning and related piping (not supplying) Accumulator (400 lit) Only erection and commissioning and related piping (not supplying) Fuel Oil system Piping DN 500 DN 400, API 5L Gr.B , ERW , Sch.20 DN 350 , API 5L Gr.B , ERW , Sch.20 CL-2A meters meters meters 260 428
Page 22 of 37 FUEL SYSTEM

Erection Price Total Price Unit Price Total Price

Supply + erection Unit Total Price Price

Remark

No.

2 (65m3/hr) (H=70 m)

Each set: 2x100%Pumps 1x100% duplex filter

4.2

No. No.

2 2

5 6 6.1 6.1.1 6.1.2 6.1.3


Rev 0

No.

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price 6.1.4 6.1.5 6.1.6 6.1.7 6.1.8 6.1.9 6.1.10 6.1.11 6.2.1 6.2.2 6.2.3 6.2.3 DN 300 insulated and electrical heat traced (only cutting & removing and storage at existing site not supply) DN 250 insulated and electrical heat traced , (only cut & remove at existing site not supply) DN 200, API 5L Gr.B , ERW , Sch.20 DN 150, A106 Gr.B , SMLS , Sch.40 DN 125 DN 100, A106 Gr.B , SMLS , Sch.40 DN 60 DN 25, A106 Gr.B , SMLS , Sch.80 Flanged gate valve DN 500 DN 400 , LIMIT SWICH , A216 WCB , FLANGED, STEM: S.S +13%Cr , DISK: S.S+13%Cr, B16.34 DN 350 , LIMIT SWICH , A216 WCB , FLANGED, STEM: S.S +13%Cr , DISK: S.S+13%Cr, B16.34 meters meters meters meters meters meters meters meters G-22A No. No. No. No.
-

Erection Price Total Price Unit Price Total Price

Supply + erection Unit Total Price Price

Remark

260 380 36 130 400

Rev 0

Page 23 of 37

FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price 6.2.4 6.2.5 6.2.6 6.2.7 6.2.8 6.2.8 6.2.9 6.2.10 6.2.11 6.2.12 6.2.13 6.2.14 6.2.15
Rev 0

Erection Price Total Price Unit Price Total Price

Supply + erection Unit Total Price Price

Remark

DN 200 , LIMIT SWICH , A216 WCB , FLANGED, STEM: S.S +13%Cr , DISK: S.S+13%Cr, B16.34 DN 150 , A216 WCB , FLANGED, STEM: S.S +13%Cr , DISK: S.S+13%Cr, B16.34 DN 100 , LIMIT SWICH , A216 WCB , FLANGED, STEM: S.S +13%Cr , DISK: S.S+13%Cr, B16.34 DN80 DN 65 Socket welded gate valve DN 50 DN 25 DN 20 DN 15 Flanged Check valve DN 350 DN 250 DN 100 Socket welded Check valve DN 50 Strainer

No. No. No. No. No. G-21 No. No. No. No. C-22A No. No. No. No. S-22A

2 18 2 LOT LOT LOT LOT 2 Page 24 of 37 FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price 6.2.16 6.2.17 DN 80 Flanged Globe Valve DN 250 , LIMIT SWICH , A216 WCB , FLANGED, STEM: S.S +13%Cr , DISK: S.S+13%Cr, B16.34 DN 200 , LIMIT SWICH , A216 WCB , FLANGED, STEM: S.S +13%Cr , DISK: S.S+13%Cr, B16.34 DN 80 Socket welded Globe Valve DN15 DN20 Elbow 90 DN 300 DN 250 DN 200 DN 100 Universal expansion joint DN300 Universal expansion joint DN250 Universal expansion joint DN200 Universal expansion joint DN100 No. No. No. No. No. O-22A No. No. No. No. No. No. No. 4 2 16 10 20 30 Page 25 of 37 FUEL SYSTEM

Erection Price Total Price Unit Price Total Price

Supply + erection Unit Total Price Price

Remark

6.2.18 6.2.19 6.2.20 6.2.21 6.2.22 6.2.23 6.2.24 6.2.25 6.2.26 6.2.27 6.2.28
Rev 0

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price Total Price Erection Price Unit Price Total Price Supply + erection Unit Total Price Price Remark

8 8.1 8.2 9 9.1 9.2 10 14 14.1 14.2 14.3


Rev 0

Supports Primary supports Secondary supports Insulation: Mineral rock wool blankets + Al. Cladding for all fuel oil pipes 30 mm thick. 50 mm thick. For all fuel oil pipes sizes DN150 and greater Electrical tracing For all fuel oil pipes I & C items Field instruments as per P&ID I&C cables, cable trays &accessories Control panels and junction boxes Kg Kg lot lot

*The quantity of supports are preliminary, they shall be finalized by contractor.

Clamps, shoes etc. Structural items, plates etc. With 0.6mm Aluminum cladding

m m m

lot Lot (For all fuel oil pipes) Lot (For all fuel oil pipes)

Lot Lot No.


Page 26 of 37 FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price 14.4 14.5 14.6 15 15.1 15.2 15.3 15.3.1 15.3.2 15.4 15.5 15.5.1 15.5.2 15.5.3 15.6 15.7 15.8 15.9
Rev 0

Erection Price Total Price Unit Price Total Price

Supply + erection Unit Total Price Price

Remark

Instrument installation materials Motorized valves as per P&ID PLC (if required) Supply & erection of electrical items LV Motors Local Control Box for LV Motors Electrical Panels Motor Control Center Power distribution panel Cables Cabling accessories Trays including support, bracket and other accessories Ladders including support, bracket and other accessories Conduits Secondary grounding& Lightning Electrical Heat tracing systems (for all fuel oil pies) Cathodic Protection (if any) Building Lighting system

Lot No.

Nos. Nos. Nos. Nos. Nos. m m m m

Page 27 of 37

FUEL SYSTEM

MAPNA GROUP CO. ARDEBIL (EXTENSION) POWER PLANT preliminary MTO (Only Quantities are for Information and sizes are Minimum required)
( Note: All texts of contract are scope of supply and work and service and they all should be completely done by contractor without any extra cost)
SCHEDULE OF PRICE- Details I. SCHEDULE OF PRICE- Details

Fuel Oil System


Item No. Description Date sheet No./ Note 5 Unit Quantity Supply Price Unit price 15.10 Building communication system Total Price Erection Price Unit Price Total Price Supply + erection Unit Total Price Price Remark

Notes: 1. Where ever it is mentioned in this specification that the contractor shall perform certain work or provide some material or provide certain facility etc., it is understood that he shall do so at his cost. 2. The contractor should supply and provide erection of pipe fittings, flanges, fasteners, gaskets etc. Also the handling storing, fabrication, hardware, industrial consumables, cost of water, power, machinery for fabrication, erection, erection of on line instruments, inspection, testing & commissioning, labour, supervision, etc. should be executed by contractor. So, Supply, fabrication, erection of auxiliary steam & condensate recovery systems piping inside battery limits as per relevant piping specification including supply and fixing of all fittings as required including supply of consumables, securing the pipe runs with suitable supports, related testing , including labor and supervision all as directed and specified shall perform by contractor. 3. Fabrication painting including supply of paint is deemed as part of supply. 4. Erection work includes erection, commissioning and performance testing. 5. Refer to piping material specification, for pipes and valves. 6. In the electrical section, according to the bidder's designing the unit price shall be quoted for each size of cables, conduits and trays/ladders which are to be used in the system. 7. For the secondary grounding and heat tracing and cathodic protection the equipment list for each system shall be quoted. (These equipment lists shall cover all of the system requirements) 8. All figures in this table are preliminary and should be checked by contractor. By attention that this project is EPC so what ever these figures changed all are by contractor's responsibility. 9-

All texts of contract are scope of supply and service and they all should be completely done by contractor without any extra cost