MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMPANY IPDC

PROJECT: 2160 MW ARDEBIL EXTENSION GAS TURBINE POWER PLANT

NATURAL GAS SYSTEM DESIGN CRITERIA

THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN

IN-HOUSE REVISIONS
B A 0 REV. B A

DOCUMENT REVISIONS
Revised let. 61321 Issue For Approval
DESCRIPTION

B.F. B.F.
DESG. Date

B.Am

M.N

88-10 88-08

The First Issue


DESCRIPTION DESG. DATE CHK. DATE APP.

0
DATE REV.

CHK.

Date

APP.

Date

Doc. No. : TSM/ AL -99/BP-M-40-FG0-135 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:

Rev.: A

Page1 of 6

MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMPANY IPDC

PROJECT: 2160 MW ARDEBIL EXTENSION GAS TURBINE POWER PLANT


PAGE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 0 X X X X X X A B REVISION C D E F G REMARKS PAGE 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 0 A B REVISION C D E F G REMARKS

X X X

THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN

Doc. No. : TSM/ AL -99/BP-M-40-FG0-135 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:

Rev.: A

Page2 of 6

MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMPANY IPDC

PROJECT: 2160 MW ARDEBIL EXTENSION GAS TURBINE POWER PLANT

INDEX
TITLE 1. References 2. General 3. Site Conditions 4. Purpose of The System 5. Scope of Work & Terminal Points 6. Design Critera Page 4 4 4 5 5 6

THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN

Doc. No. : TSM/ AL -99/BP-M-40-FG0-135 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:

Rev.: A

Page3 of 6

MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMPANY IPDC

PROJECT: 2160 MW ARDEBIL EXTENSION GAS TURBINE POWER PLANT

References PFD for Natural Gas Main System PFD for Natural Gas Auxiliary System General

TSM/AL-00/BP-M-02-FR3-158 TSM/AL-00/BP-M-02-FR3-159

ARDEBIL EXTENSION open cycle power plant consists of Two V94.2 gas turbines. Natural gas will be the main fuel for GT units, and fuel oil will serve as back up fuel. Site Conditions ARDEBIL EXTENSION gas turbine power plant is located in the west north of Iran. Following data will be considered for the designing of the natural gas system: Site Abs. Temperature: Max.: +37 C Min: -30 C Natural Gas Temperature: Max.: +37 C Min: 15C Operating Pressure : 330 Psig

THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN

A
Design Pressure : 400 Psig

Doc. No. : TSM/ AL -99/BP-M-40-FG0-135 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:

Rev.: A

Page4 of 6

MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMPANY IPDC

PROJECT: 2160 MW ARDEBIL EXTENSION GAS TURBINE POWER PLANT

Minimum Pressure at GT filtration inlet flange : 21 Barg Flow Rate of each GT Limit of Velocity Purpose of the System Natural gas system supplies natural gas for consumption of 2 gas turbine units and also the required fuel gas for miscellaneous consumer (HVAC Bld.). A branch with 250 Nm3/hr capacity will be routed from existing domestic gas reducing station outlet header to the new HVAC building in the extension portion of power plant . : 50,000 Nm3/hr : 20 m/s

Scope of Work & Terminal Points The scope of design and procurement and erection for ARDEBIL
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN

EXTENSION power plant's natural gas system will be from outlet flange of existing reducing station up to the inlet flanges of the filtering skids of each GT unit. For miscellaneous consumer, a line will be branched off from the outlet header of existing domestic gas reducing station up to 1 meter distance of the new HVAC building.

Doc. No. : TSM/ AL -99/BP-M-40-FG0-135 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:

Rev.: A

Page5 of 6

MINISTRY OF ENERGY IRAN POWER DEVELOPMENT COMPANY IPDC

PROJECT: 2160 MW ARDEBIL EXTENSION GAS TURBINE POWER PLANT

Natural Gas System Design Criteria The following items will be considered for designing the natural gas system between terminal points: All natural gas lines will be above ground or in the pipe trench, and near the turbine hall will be on the pipe rack, therefore no cathodic protection will be considered. For new 2 gas turbine units a line is branched off from outlet flange of existing reducing station and routed to the new units. For new HVAC building with 250 Nm3/hr a line is branched off from existing DN80 gas line near existing turbine hall.

Natural gas system will be designed according to NIGC "ISIRI 2097"


THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR AUTHORIZATIIN

standard and ASME "B31.1" and "B31.3" and other applicable standards. Engineering softwares such as AutoCad, Word, Excel, Caesar II, and will be applied.

Doc. No. : TSM/ AL -99/BP-M-40-FG0-135 Contract No.: MAPNA-MD1 Co SE Code: MF Code: File No.:

Rev.: A

Page6 of 6