Sie sind auf Seite 1von 5

SPEC NO.

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION FIRE PROTECTION SYSTEM FIRE PROTECTION SYSTEM

SECTION: C6 PART 2 VOLUME V SHEET 1 OF 1

TCE.5270A-H-112-601

1.0 1.1

This section covers the fire protection systems suitable for the type of risk / fire for different buildings, equipment, tanks, transformers, etc., covering the power plant and associated auxiliaries / facilities completely. Various types of protection systems and associated equipment / system components shall be completely designed in compliance with the regulations of Tariff Advisory Committee (TAC) of India. Bidder shall obtain all necessary clearances from authorised agency approved by TAC. Technical particulars shall be as per enclosed Data Sheets Fire protection system shall include Fire detection and alarm system as described below. A conventional fire detection system shall be included by the Bidder consisting of manual call points, smoke / optical type detector, cables and control panel including power supply for the fire alarm system. The detectors shall be located in the following areas. (a) (b) (c) Switchgear room Optical / Smoke detectors At strategic locations in Switchyard / Transformer area 4 manual call points mounted on pedestal Control room Optical smoke detectors

1.2 1.3 1.4 1.4.1

1.4.2

1.4.3 1.4.4

The control panel shall be located in the main control room. The design of the fire alarm / detection system shall be as per latest edition of IS 2189 INFORMATION TO BE FURNISHED BY BIDDER ALONG WITH THE BID Bidder shall furnish the information listed below along with the bid. (a) (b) Description of the fire protection system for the proposed plant. Process and Instrumentation Diagram (P&ID) & General Arrangement drawing for complete fire protection system indicating capacity and head of pumps, type of hazard, dead storage, number of hydrants, operation philosophy of complete system etc. Filled in Data sheet-B as called for in the specification.

2.0

(c)

ISSUE P0 TCE FORM 329 R3

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION
SPEC NO.

SECTION : C6
PART 2 VOLUME V

TCE.5270A-H-112-601

DATA SHEET A FIRE PROTECTION SYSTEM DESCRIPTION HYDRANT SYSTEM Hose pipes Hose cabinets (For internal and external hydrants/ foam hydrants) Area to be protected Equipment / system required As per IS 636 Type-A As per manufacturing standard. 18 SWG thick body and 3 mm glass panel All areas of power plant This system shall comprise of underground ring headers, hydrant valves (single or double headed based on hazard covered), risers with isolating valves, underground valve chambers with isolating and drain valves, hume pipes for rail/road crossing. Foam hydrants for the fuel oil dyke area etc. IS 458 NP Class-2 IS 458 NP Class-3 Automatic. Stopping of the main and standby pumps shall be manual. Jockey pump shall be provided automatic and manual start/ stop UNITS SHEET 1 OF 4 VALUES / REQUIREMENTS

SL. NO. 1.0 1.1 1.2 1.3 1.4

1.5

Hume pipes (i) Road crossing (ii) Rail crossing Mode of operation of pumps

1.6

2.0 2.1 2.2

HVWS SYSTEM System actuation Deluge valve Quartzoid bulb detector-QB (Heat sensing fusible type) Wet pilot valve. Physical lock shall be provided for upstream & downstream isolation valves. Generator transformers This system shall comprise of water filled detector network with QB detectors. Another network with spray nozzles connected to the water supply main through deluge valve normally kept closed by water pressure in the network shall be provided.

2.3 2.5

Area /Equipment to be protected System requirement

3.0 3.1 3.2 REV. NO. DATE REV. BY

PORTABLE EXTINGUISHERS Area to be protected Quantity, Type and capacity P0 JAN - 03 PPD. BY CKD BY DATE PLP OCT -07 JOB NO.
TCE.

All areas of power plant Contractor to decide CLIENT: TATA POWER COMPANY LTD PROJECT : BHIRA AUGMENTATION (1 x 100 MW)

5270A

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION
SPEC NO.

SECTION : C6
PART 2 VOLUME V

TCE.5270A-H-112-601

DATA SHEET A FIRE PROTECTION SYSTEM DESCRIPTION UNITS SHEET 2 OF 4 VALUES / REQUIREMENTS

SL. NO.

4.0 4.1 4.2 4.3 4.3.1

PUMPS Water source Location Capacity & Designation Main fire water pumps & Stand by pumps (a) Quantity (b) Capacity (c) Head (d) Speed (e) Type Cu.m / hr mwc rpm 1 working (Electric motor driven) + 1 stand-by (Diesel engine driven) By BIDDER (Shall be as per TAC regulations) By BIDDER (Shall be as per TAC regulations) 2900 rpm for motor driven and 1800 for diesel engine driven pump Horizontal Centrifugal Pump suction from penstock upstream inlet pipe (All units to be inter-connected) Fire water pump house

4.3.2

Jockey pumps (a) Quantity (b) Capacity (c) Head (d) Speed (e) Type Cu.m / hr mwc rpm 1 working (Electric motor driven) By BIDDER (Shall be as per TAC regulations) By BIDDER (Shall be as per TAC regulations) 2900 rpm Horizontal Centrifugal

4.4

Material of construction (a) Impeller (b) Casing (c) Shaft Bronze to IS 318 Gr.2 / SS 316 CI :IS 210 Gr. FG.260 SS 410

4.5

Diesel engine & accessories (a) Type (b) Accessories Turbo charged As required including local panel

5.0 5.1 6.0

FIRE WATER STORAGE TANK Capacity HYDRANT/ SPRAY SYSTEM PIPING AND VALVES (a) Material MS - BLACK PPD. BY CKD BY DATE PLP OCT -07 JOB NO.
TCE.

As per TAC requirements

REV. NO. DATE REV. BY

P0 JAN - 03

CLIENT: TATA POWER COMPANY LTD PROJECT : BHIRA AUGMENTATION (1 x 100 MW)

5270A

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION
SPEC NO.

SECTION : C6
PART 2 VOLUME V

TCE.5270A-H-112-601

DATA SHEET A FIRE PROTECTION SYSTEM DESCRIPTION (b) Standard (Pipes) (c) Standard (Fitting) UNITS SHEET 3 OF 4 VALUES / REQUIREMENTS IS 3589 Gr FE 410 / IS 1239 Heavy Grade Part I (ERW) Socket welded ASTM A 105 for NPS 40 & below , 3000 Class , ANSI B16.11 Butt Welded ASTM A 234 Gr WPB for NPS 50 to 150 SCH 40 SMLS, ANSI B16.9 Fabricated from parent pipes for NPS 200 & above ASTM A105 , IS 2062 Gr. A IS 2062 Gr. A ANSI B 16.5 , SO 150 CL Welded IS 10221 for Underground/ Painted (Two coats of grey zinc primer . Two coats of enamel paint each 75 microns thickness) GI pipes and fittings downstream of Deluge valves For pipes NPS 200 to 350 thickness min 6mm For pipes NPS 400 thickness min 8 mm

SL. NO.

(d) Flanges i) NPS 150 ii) NPS 200 to 300 iii) NPS 350 iv) Type (d) Type of joints (e) Type of protection

(f) Pipe Thickness

(g) Valves i) NPS 40 ii) NPS 50 to NPS 100 iii) NPS 150 12.0 12.1 PANELS Local control panel To be provided for diesel driven pump and deluge valves of transformers located near the equipment to be protected. This panel shall have contact for remote annunciation in the annunciation panel in the fire water pump house Power for these panel shall be arranged from nearest MCC and shall house necessary relays, indicating lamps etc To be provided for spray system and pump located in fire water pump house. This panel shall have provision for suitable relays & contacts for remote indication in PLP OCT -07 JOB NO.
TCE.

Bronze ASTM B62 for gate , globe, check CI IS 210 Gr. FG 200 , Class 125,FF for gate, globe, check CI IS 210 Gr. FG 200 , PN 1.0, Wafer type Butterfly valve as per AWWA C 504

12.2

Common annunciation panel

REV. NO. DATE REV. BY

P0 JAN - 03

PPD. BY CKD BY DATE

CLIENT: TATA POWER COMPANY LTD PROJECT : BHIRA AUGMENTATION (1 x 100 MW)

5270A

THE TATA POWER COMPANY LIMITED BHIRA 100 MW AUGMENTATION SCHEME INCLUDING MULSHI LAKE SUB-STORAGE UTILIZATION
SPEC NO.

SECTION : C6
PART 2 VOLUME V

TCE.5270A-H-112-601

DATA SHEET A FIRE PROTECTION SYSTEM DESCRIPTION UNITS SHEET 4 OF 4 VALUES / REQUIREMENTS main control room. The panel shall generally consist of annunciation windows with inscription for visual indication, audible alarm, alarm and lamp accept and reset push buttons, lamp check and test push buttons. The annunciation panel shall have power supply ON, pump running status, batteries for diesel engine not charged

SL. NO.

13.0

NOTE i) Motors, power and instrumentation cables, pressure gauges, pressure switches, level switches, start/ stop push button for pumps shall be as outlined elsewhere in the specification ii) Complete civil works covering excavation & back for laying the underground piping & cables, brick masonry chamber with CI, covers for outdoors/isolating valves, pipe supports, excavation & backfilling for all road crossings to original grade including resurfacing, providing suitable RCC with plan concrete 1:4:8 providing pipe trenches of M20 grade reinforced concrete where necessary filling up the trenches with sand after pipe laying & providing pre-cast concrete cover, providing opening in bricks walls/concrete slab for pipe routing & sealing of opening, paintings providing hume pipes at road crossings & finishing / resurfacing of the corresponding roads, construction of deluge valve housing etc. The scope of civil work shall also include chipping of foundation of pumps upto 25 mm & grouting. iii) All minor civil works associated with the installation of electrical equipment & cables, shall be done by VENDOR and made good. These minor civil works shall include chipping, punching of holes, pockets, welding or any such work required for the neat and aesthetic installation of all electrical equipment covered under this contract.

REV. NO. DATE REV. BY

P0 JAN - 03

PPD. BY CKD BY DATE

PLP OCT -07

JOB NO.
TCE.

CLIENT: TATA POWER COMPANY LTD PROJECT : BHIRA AUGMENTATION (1 x 100 MW)

5270A