Sie sind auf Seite 1von 10

www.ko ntrakt orQual itytoo ls.co m.

my

Architecture
Product Brochure
Your On- line Quality, Safet y and Operation Partne r

Our Products
Floor Screeding Water Proofing Works: Cementitious, PU Membrane and Flame Torch Tiling Works: Dry Lay and Wet Lay Method Timber Board Installation, Pre Engineered Timber Flooring Stone and Pebble Wash Installation Carpet Tile Installation Brickwork: Clay Bricks, Cement Sand Bricks and Fair Face Bricks, Hollow Block works and Light Block Works Door Window Installation: Timber and Aluminum Plastering: External Rough Surface Finish and Skim Coating Finish Painting Ceilling Works: Plaster Board Installation and Gypsum Board, Skim Coat at Slab Soffit, Roof Covering : Roof Tile Installation, Metal Roofing System Fair Finish Rubble Wall, Stone Cladding Works.

Architecture Architecture Product Brochure CWM Kit Product Summary


Scope of Works
Brickworks - Suitable for common brickworks wall construction for main building or external wall.

Product Code

Trades

Descriptions / Details
Brickworks consist of the following items; Survey and Setting Out Work Preparation Before Start Work Bitumen Application & DPC Installation Brick Laying & Cement Mortar (Keying) Installation of Ex-met or Lintel Beam Teething & Solider Brick Requirements Treatment Between RC Structure to the Brickwork

Architecture CWM
BR-01

Scope of Works
Brickwork with fair finish clay brick Suitable for fair finish brickworks wall construction for main building or external wall.

Trades

Descriptions / Details
Brickworks consist of the following items; Survey and Setting Out Work Preparation Before Start Work Bitumen Application & DPC Installation Fair Face Brick Lay Cement Mortar, Jointing and Pointing

Architecture CWM
BR-02

Architecture Product Brochure


Scope of Works
Door and Window Installation (Aluminium) include installations of aluminium door or window (with or without sub-frame).

Product Code

Trades

Descriptions / Details
Door and Window Installation (Aluminium) consist of the following items; Setting Out: Horizontal & Vertical Preparation to Start Work Door & Window Installation - Aluminum Window & Door (with sub-frame) - Aluminum Window & Door (without sub-frame) Protection to the Completed Work

Architecture CWM
WD-01

Scope of Works
Door and Window Installation (Metal) include installations of metal door frame and window louvers installation (fixed/ adjustable louvers).

Trades

Descriptions / Details
Door and Window Installation (Metal) consist of the following items; Setting Out: Horizontal & Vertical Preparation to Start Work Door & Window Installation - Metal Door Installation - Window Louvers Installation Protection to the Completed Work `

Architecture CWM
WD-02

Architecture Product Brochure


Scope of Works
Door and Window Installation (Timber) include installations of timber door or window.

Product Code

Trades

Descriptions / Details
Door Window Installation (Timber) consist of the following items; Setting Out: Horizontal & Vertical Preparation to Start Work Door & Window Installation Protection to the Completed Work

Architecture CWM
WD-03

Scope of Works
Plastering Works (without skim coat) suitable for plastering work without skim coating for internal or external finished.

Trades

Descriptions / Details
Plastering Works (without skim coat) consist of the following items; Survey Setting Out / Level Pegs Installation Preparation To Start Work: - Spatter Dash, - Wire Mesh between RC Structure and Brick - Installation Plastering (Decorative Products) Internal & External Plastering Works with Normal Surface Plaster (without skim coat finishes)

Architecture CWM
PS-01

Architecture Product Summary


Scope of Works
Plastering Works (with skim coat finished) suitable for plastering work with skim coating for internal buildings finished.

Product Code

Trades

Descriptions / Details
Plastering Works (with skim coat) consist of the following items; Survey Setting Out / Level Pegs Installation Preparation To Start Work: - Spatter Dash - Wire Mesh between RC Structure and Brick - Installation of Plastering (Decorative Products) Internal & External Plastering Works Application of the Skim Coat Finishes

Architecture CWM
PS-02

Scope of Works
Water Proofing Works (Cementitious) suitable for internal water proofing works such as toilet or balcony.

Product Code

Trades

Descriptions / Details
Water Proofing Works (Cementatious) consist of the following items; Surface Preparation Application of Water Proofing (Cementatious) Post Application of Water Proofing (Cementatious)

Architecture CWM
WP-01

Architecture Product Brochure


Scope of Works
Water Proofing Works (Flame Torch Method) suitable for external waterproofing and exposed weather conditions such as retaining wall structure or roofing water proof layer

Product Code

Trades

Descriptions / Details
Water Proofing Works (Flame Torch Method) consist of the following items; Surface Preparation Application of Water Proofing (Flame Torch Method) Post Application of Water Proofing (Flame Torch Method)

Architecture CWM
WP-02

Scope of Works
Water Proofing Works PU Type/Modified Cementitious

Product Code

Trades

Descriptions / Details
Water Proofing Works (PU Type/ Modified Cementatious) consist of the following items; Surface Preparation Application of Water Proofing (PU Type/ Modified Cementatious) Post Application of Water Proofing (PU Type/ Modified Cementatious)

Architecture CWM
WP-03

suitable for external waterproofing and exposed weather conditions such as retaining wall structure or roofing water proof layer

Architecture Product Brochure


Scope of Works
Floor Screeding Works suitable for tiling works, timber flooring works, marble laying works, carpet installation or cement rendering.

Product Code

Trades

Descriptions / Details
Floor Screeding Works consist of the following items; Surface Preparation Floor Screed Setting Out: Marking & Mortar Pegs Floor Screed Works: Batching and Mixing Floor Screed Application

Architecture CWM
FS-01

Scope of Works
Tiling Works (Dry Method) - Applicable for tiling work with dry method approach.
(Note: this method recommended for floor tiling tile size over than 2ft x 2ft)

Product Code

Trades

Descriptions / Details
Tiling Works (Dry Method) consist of the following items; Floor Screeding Completed to Received Tile Tiling: Floor Marking or Tile Setting Out Tile Cut to Size Apply Thin Bed Layer with Adhesive Lay Tiles: Level Control and Pointing

Architecture CWM
WP-03

Architecture Product Brochure


Scope of Works
Rubble Wall (Fair Face) Construction of rubble wall with fair face finish.

Product Code

Trades

Descriptions / Details
Rubble wall construction consist of the following items Survey and Setting Out Base: Trenches Excavation Base: Pre and Post Concreting (Base) Laying Solid Rock/ Stone Make Good the Recessed Pointer Backfilling & Compaction Floor Screed Application

Architecture CWM
RW-01

Architecture Product Brochure

Hollow Block Works Suspended Ceiling Installation Timber Flooring Board Installation Pre Engineered Timber Flooring Painting Works Plaster Glass Ceiling Stone Cladding Wall Stone Works Marble Works

Das könnte Ihnen auch gefallen