INTRODUCTION

NPGCL ESTABLISHED AS PUBLIC LTD. COMPANY IN 1998 AND ITS HEAD


OFFICE AT TPS MUZAFFARGARH MEHMOOD KOT ROAD IN
THE PROVINCE OF PUNJAB.
PUNJAB

NPGCL COMPRISES OF EIGHT GENERATING BLOCKS, SITUATED


AT MUZAFFARGARH,, FAISALABAD,, MULTAN & LAHORE.

THE INSTALLED CAPACITY OF THE COMPANY IS 1980MW

STARTED COMMERCIAL OPERATION FROM MARCH 1,


1 1999.
1999

LICENCE GRANTED BY NEPRA FROM JULY 1, 2002.

LICENSED POWER PLANTS


THERMAL POWER STATION MUZAFFARGARH.
NATURAL GAS POWER STATION MULTAN.
GAS TURBINE POWER STATION FAISALABAD
FAISALABAD.
STEAM POWER STATION FAISALABAD.
59 MW GTPS SHAHDARA LAHORE (NON LICENSED) STANDBY POSITION01
DUE TO NON AVAILABILITY OF GAS.

KeyStatsasofJune30,2010
InstalledCapacity,MW1921
DependableCapacity,MW1400
Maximum Power Despatch MW
MaximumPowerDespatch,MW1169
1169
UnitsGenerated,MkWh
564.705
UnitsSentOut,MkWh
507.048
Auxiliaries,%10.21
l
LoadFactor,%56.60
PlantFactor,%50.57
FSA,quantity&period180,000/monthfor15years
GSA,quantity&periodUndernegotiation

03

ProfileofBODandSr.Management
JobTitle/Name

Qualification

T.Exp.,Yrs

YearswithCo.

SeniorManagementNPGCL(GENCOIII)
1.

CEO:GhulamMustafaTunio

B.E(Electrical)

32Years

02Years

2.

TD/CE:ShahNawaz

B.Sc
(Engineering)

30Years

03Years

3.

CEFSDTariqNazir

B.Sc
(Engineering)

32Years

02Months

4.

CENandippur:Sultan
MuhammadZafar

B.E(Electrical)

32Years

04Years

5.

CEChichokimalian:Muhammad
YasinMir

B.Sc
(Engineering)

33Years

02Years

6.

FD:MasoodAhmad

MBA(Finance)

10Years

02Years

7
7.

HRD: Zafar Iqbal Awan


HRD:ZafarIqbalAwan

MA LLB
MALLB

34 Years
34Years

01 Years
01Years

5.

Legal:

ProfileofBODandSr.Management
BoardofDirectors

1.

Prof.AbdulHameed

2
2.

M Abd l R h d Mi
Mr.AbdulRasheedMir

Qualificatio
n

T.Exp.,Yrs

Yearswith
NPGCL

M.Sc.Elect.
Engg.
F.I.E.E(UK)
F.INST.
E.E.E.(Pak)

Dean,FacultyofElectricalEngg.
UniversityofEngineeringand
TechnologyLahore,Director,
BOD,TEVTA(200204)
Chairman,BismillahEducation
,
TrustRegionalDirector,
NationalInstituteofPower
(199298)
Council Member IEE (UK)
CouncilMember,IEE(UK)
CouncilMember,IEEE(Pak)

08Years

F CA
F.CA

14yearsasCEO/DirectorGrays
14
CEO/Di t G
LeasingLtd.13yearsas
Chairman/DirectorFriendswear(Pvt)
Ltd.

08 Y
08Years

04

ProfileofBODandSr.Management
BoardofDirectors

Qualificatio
n

T.Exp.,Yrs

Yearswith
NPGCL

B.Sc.(Honrs)

30YearsasDirector,Mahmood
GroupofIndustries,Member
ExecutiveCommittee(FPCCI),
MemberCetralExecutiveCommittee
(APTMA),DirectorPunjabSocial
SecurityHealthManagement
Company President D G Khan &
Company,President,D.G.Khan&
BahawalpurChamberofCommerce
&Industry

04Years

ACMA

20yearsinPowerSector

1Years

3.

KhawajaMuhammadYounis

4.

Mr.HammadAhmad

5.

Mr.MuhammadRafiqButt

B.Sc(Electrica
l)

35Yearsaspowerplant
engineer,Presentlyworkingas
GM(D&D)

1Years

6
6.

Mr.MuhammadNaeem
Mr
Muhammad Naeem
Akhtar

B.Sc(Mechan
B
Sc(Mechan
ical)

33Yearsaspowerplant
33
Years as power plant
engineer,Presentlyworkingas
CE(MMS)

2 Months
2Months

7.

Mr.GhulamMustafaTunio

B.E(Electrical
)

34yearsaspowerplant
engineer,Presentlyworkingas
CEO(GENCOIII)

1Years

05

TPSMuzaffargarh
UnitwiseDetail
Unit
UnitName

Type

COD/Age

Installed
Capacity

Dependable
Capacity

Fuel

FSA

UnitNo.1

Steam
Turbine

09.09.1993

210

185

RFO/G
as

F.O.

U i
UnitNo.2
2

Steam
St
Turbine

23 03 1994
23.03.1994

210

200

RFO/G
as

FO
F.O.

UnitNo.3

Steam
Turbine

20.02.1995

210

160

RFO/G
as

F.O.

UnitNo.4

Steam
Turbine

23.12.1997

320

245

RFO/G
as

F.O.

UnitNo.5

Steam
Turbine

14.02.1995

200

110

RFO/G
as

F.O.

UnitNo.6

Steam
Turbine
bi

14.08.1995

200

100

RFO/G
as

F.O.

06

NGPSMultan
UnitwiseDetail
Unit
UnitName

Type

COD/Age

Installed
Capacity

Dependable
Capacity

Fuel

FSA

UnitNo.1

Steam
Turbine

13.05.1960

65

30

RFO/G
as

F.O.

UnitNo.3

Steam
Turbine

11.07.1963

65

30

RFO/G
as

F.O.

UnitNo.4

Steam
Turbine

01.11.1963

65

30

RFO/G
as

F.O.

SPSFaisalabad
SPS Faisalabad
UnitwiseDetail
Unit
UnitName

Type
yp

COD/Age
/ g

Installed
Capacity

Dependable
p
Capacity

Fuel

FSA

UnitNo.1

Steam
Turbine

11.06.1967

66

50

RFO/G
as

F.O.

U i N 2
UnitNo.2

Steam
St
Turbine

15 11 1967
15.11.1967

66

50

RFO/G
as

FO
F.O.
07

GTPSFaisalabad
UnitwiseDetail
Unit
UnitName

Type

COD/Age

Installed
Capacity

Dependable
Capacity

Fuel

FSA

GT1

GasTurbine

09.03.1975

25

19

GAS/H
SD

Under
negotiation

GT2

GasTurbine

10.03.1975

25

19

GAS/H
SD

Under
negotiation

GT3

GasTurbine

04.05.1975

25

19

GAS/H
SD

Under
negotiation
ti ti

GT4

GasTurbine

06.03.1975

25

19

GAS/H
SD

Under
negotiation

GT5

GasTurbine

31.07.1975

25

23

GAS/H
SD

Under
negotiation

GT6

GasTurbine

05.07.1975

25

23

GAS/H
SD

Under
negotiation

GT7
GT
7

GasTurbine

10.07.1975

25

23

GAS/H
/
SD

Under
negotiation

GT8

GasTurbine

14.11.1975

25

23

GAS/H
SD

Under
negotiation

CCP 9
CCP9

Combine
Combine
cycle

28 12 1994
28.12.1994

44

42

GAS/H
SD

Under
Under
negotiation
08

Generation
(MkWh)

Units Sold
(MkWh)

Auxiliary
(% )

Load
Factor (% )

Plant
Factor (% )

TPSM
uzaffargarh

FY 2007-08

1000

5917.876

5390.289

8.92

63.87

51.83

FY 2008-09

1000

6162.969

5600.236

9.13

62.82

62.26

FY 2009-10

1000

6055.578

5465.050

9.75

75.13

53.17

FY 2010
2010-11
11

1000

6045.474

5485.192

9.27

67.27

55.75

FY 2007-08

210

534.041

504.623

5.51

27.39

31.83

FY 2008-09

210

465.791

445.178

4.43

24.06

28.02

FY 2009-10

210

478.349

459.682

4.53

27.58

27.26

FY 2010
2010-11
11

210

492 727
492.727

469 828
469.828

4 82
4.82

26 34
26.34

29 04
29.04

FY 2007-08

90

360.732

320.713

11.09

51.33

21.06

FY 2008-09

90

304.998

262.926

13.79

49.74

17.86

FY 2009-10

90

193.902

161.557

16.68

34.05

11.35

FY 2010-11
2010 11

90

286 544
286.544

248 398
248.398

13 85
13.85

45 04
45.04

16 76
16.76

FY 2007-08

100

625.250

565.628

9.54

71.11

71.18

FY 2008-09

100

489.840

444.107

9.34

60.78

55.92

FY 2009-10

100

453.558

407.098

10.24

69.03

53.93

FY 2010-11
2010 11

100

522 883
522.883

472 278
472.278

9 71
9.71

66 97
66.97

60 34
60.34

FY 2007-08

1400

7437.899

6781.252

8.77

53.43

43.98

FY 2008-09

1400

7423.597

6752.447

9.17

49.35

41.02

FY 2009-10

1400

7181.386

6493.387

10.30

51.45

36.43

FY 2010-11
2010 11

1400

7347 628
7347.628

6675 695
6675.695

9 41
9.41

51 41
51.41

40 47
40.47

Total

SPSFaisalabad

N
G
PSM
ultan

Dep.
Cap.
(MW)

G
TPSFaisalabad

Plant-Wise Generation Data

Note: For the year 2010-11, Estimate were based on average.

09

Plant-Wise Fuel Consum ption


Fuel Mix,
GAS
(MMCFT)

HSFO
(M.Ton)

HSD (ltrs)

Btu/Kwh

(% )

FY 2007-08

5917.876

6121.639

1418848.810

11797.82

28.92

FY 2008-09

6162.969

2459.426

1539816.750

11325.27

30.13

FY 2009-10

6055.578

187.684

577841.220

10844.46

31.47

FY 2010-11

6045.474

2922.916

1178835.593

11322.52

30.17

FY 2007-08

534.041

6104941.000

0.000

9870

10555.78

32.43

FY 2008-09

465.791

4943823.000

0.000

13148609

10760.97

31.72

FY 2009-10

478.349

3668277.000

0.000

49493306

10855.11

31.44

FY 2010-11

492.727

4905680.333

0.000

20883928

10723.95

31.86

FY 2007-08

360.732

982.873

108388.000

14790.25

23.07

FY 2008-09

304.998

938.192

99122.000

16092.75

21.21

FY 2009-10

193.902

17.650

78410.000

16498.73

20.68

FY 2010-11

286.544

646.238

95306.667

15793.91

21.65

FY 2007-08

625.250

1257.315

172399.213

1200

14482.33

26.05

FY 2008-09

489.840

313.024

145356.010

1360

13999.2

26.89

FY 2009-10

453.558

28.263

143495.580

420

14444.84

26.32

FY 2010-11

522.883

532.867

153750.268

993.3333333

14308.79

26.42

FY 2007-08

7437.899

6113302.827

1699636.023

11070.000

12906.54

27.62

FY 2008-09

7423.597

4947533.642

1784294.760

13149969.000

13044.55

27.49

FY 2009-10

7181.386

3668510.597

799746.800

49493726.000

13160.79

27.48

FY 2010-11

7347.628

4909782.355

1427892.528

20884921.67

13037.29

27.53

Tota
al

SPSFais
salabad

NGPSMultan

(MkWh)
TPSMuzaffargarh

Thermal
Efficiency

GTPSFaisalabad

Generation

Fuel
Consumption
btu/Kwh

10
Note: For the year 2010-11, Estimate were based on average.

Cost of Generation

Total

Block-7

Block-5

Block-6

Block-4

Block-3

Block-2

Block-1

FY 2007-08

Fuel Cost
Rs/kWh

Generation
Cost Rs/kWh

7.749

8.296

27,343,977,596
29,196,367,635

FY 2008-09

9.170

9.742

FY 2009-10

11.120

11.198

Energy Charge

Unit Sold
3,295,919,496

Tariff as
per PPA,
Rs/kWh
8.2963
9.2959

(0.4465)

(1,402,298,217)

11.1875

(0.0105)

(31,225,399)

(0.0383)

(130,421,559)

9.346

10.852

36,783,510,000

3,401,610,000

10.8136

7.164

6.225

6,149,080,253

987,552,070

6.2266

FY 2008-09

8.639

8.986

13,507,777,855

FY 2009
2009-10
10

9.568

11.103

FY 2010-11

8.457

12.160

FY 2007-08

8.081

8.522

8,741,688,260

9.0977

0.1121

166,425,301

11.1999

0.0972

163,782,760

24,130,280,000

1,983,360,000

12.1664

0.0061

12,113,073

9,434,167,676

1,106,817,112

8.5237

0.0012

1,322,491

8.128

8.996

11.526

13.568

FY 2010-11

9.245

14.654

FY 2007-08

2.584

2.126

1,526,051,078

5.274
9.237

1,173,596

1,484,748,103

FY 2008-09

4.750

0.0012

1,684,730,497

FY 2009-10

8.834

1,359,049

3,140,772,895

FY 2010-11

FY 2008-09

0.0004

Rev.Lost, Rs.
Mln

2,981,976,153

FY 2007-08

FY 2009-10

Variance,
Rs/kWh

974,715,475

8.9685

(0.0271)

(26,462,267)

798,343,078

12.5520

(1.0161)

(811,180,435)

13,397,760,000

973,380,000

13.7642

(0.8893)

(865,663,830)

846,465,453

395,633,350

2.1395

0.0139

5,507,204

373,714,391

4.0835

(1.1905)

(444,918,620)

434,912,288

7.8489

(1.3881)

(603,688,700)
(615,976,089)

FY 2010-11

5.389

5.546

964,390,000

284,980,000

3.3841

(2.1615)

FY 2007-08

2.584

3.704

391,985,259

104,242,198

3.7603

0.0561

649,470,820

71,472,609

9.0870

(0.3000)

(21,442,561)

21,756,659

5.9130

(0.3221)

(7,006,732)

(0.3917)

FY 2008
2008-09
09

4.750

9.387

FY 2009-10

8.834

6.235

FY 2010-11

5.389

6.442

140,610,000

23,240,000

6.0503

FY 2007-08

9.058

9.609

5,569,441,323

553,742,207

10.0578

0.4483

FY 2008-09

10.738

11.290

5,007,191,228

FY 2009-10

13.099

16.987

FY 2010-11

10.965

16.589

FY 2007-08

9.347

9.743

2,918,374,296

5,851,309

(9,103,629)
248,256,143

444,107,000

11.2747

(0.0148)

(6,554,748)

407,097,948

14.9370

(2.0496)

(834,367,599)

7,785,690,000

476,240,000

16.3482

(0.2412)

(114,845,856)

3,128,241,676

320,712,514

9.7540

0.0115

3,679,803

FY 2008-09

11.731

11.257

FY 2009-10

16.252

15.315

FY 2010-11

12.443

16.236

FY 2007-08

7.185

7.838

61,546,921,172

6,752,456,025

10.1893

(0.2296)

(1,776,577,171)

6,490,373,873

11.6901

(0.7435)

(2,219,316,688)

7,346,410,000

12.2968

(0.2329)

(1,776,916,051)

FY 2008-09

9.097

10.419

FY 2009-10

12.326

12.434

FY 2010-11

9.536

12.530

262,925,552

11.0996

(0.1572)

(41,326,058)

161,557,250

14.7231

(0.5919)

(95,630,583)

3,252,550,000

203,600,000

15.9752

(0.2604)

52,863,359,236
,
,
,

6,764,618,947
,
,
,

86,454,790,000

Note: For the year 2010-11, Estimate were based on average.

7.9671

0.1291

(53,018,160)
267,149,597
,
,

11

ThecompanySWOTanalysisisdefinedasunder;
STRENGTHS
1. ThelargestGenerationCompanyinPublicSector.
2 ProvisionofDualFuelFiring
2.
Provision of Dual Fuel Firing
3. PowerPlantsarelocatedintheloadcentres.
4. Availabilityoflandforcapitalexpansion.
Availability of land for capital expansion.
5. RoadandRailfacilitiesforfurnaceoilsupply.
6. Highlyqualifiedskilledlabouravailable.
7. Establishedinfrastructure.
8. Experienced&dedicatedengineersavailable.

12

WEAKNESS
1. Heatrateishighascomparedwiththedesignvaluedueto
deteriorationoftheplant.
2 Lackofcapitalinvestment.
2.
Lack of capital investment
3. DrainoutofskilledmanpowertoIPPs/abroadandRental
PowerPlantsduetolowsalariesascomparedtoprivate
sectors.
4. Ineffectivepreventivemaintenanceduetononavailabilityof
spare parts and delay approvals of shutdown of the units
sparepartsanddelayapprovalsofshutdownoftheunits.
5. Ineffectiveperformanceappraisalsystem.
6. Delayeddecisionmaking.
y
g
7. Ineffectivematerialmanagementsystem.
9. NonavailabilityofGAS.
13

OPPORTUNITIES
1.
2.
3
3.
4.

Useoflandforexpansion.
VicinityofFurnaceOilRefinery.
Modification / Rehabilitation of Plant in process
Modification/RehabilitationofPlantinprocess.
Expansionininstalledcapacity.

14

THREATS
1. InfluenceofOilMafia.
2. LackofFuel/GasSupply.
3. Securitylapses.

15

MajorAchievements&CorporateGoals
Activity

Past Achievements
PastAchievements

Future Goals/Objectives
FutureGoals/Objectives

1. TheRehabilitationofpower Themajoroverhauling 1. Thefollowingpower


plantsunderFARA
andABIoftheunits
projectsareinpipelineand
agreementisinprogress.
g
p g
carriedout.
willbeincludedinGENCO
Procurementofessential
IIIaftertheir
sparepartsinorderto
commissioning.
restorethedependant
1.425MWcombinecycle
capacity of the plant is in
capacityoftheplantisin
power plant dual fuel
powerplantdualfuel
process.
(furnace+HSD)at
Nandipur.(3x95MWgas
turbine+138MWsteam
unit)
2.320MWUAEgiftedpower
plantatGTPSFaisalabad.
(5x16MW Fr5 gas turbines
(5x16MWFr5gasturbines
+8x30MWFr6gas
turbines)
3.525MWCCPPat
Chichokimalian.(3x117MW
gasturbines+175MW
steamturbine)
16

Weaknesses/RisksandRemedialMeasures
Attribute

Degreeof PossibleReasons
Mgmt
Influence

Remedy

Implementatio
n/Support

Low
Low
employee
morale

Med

i)Lowsalary
i)
Low salary
ii)Overburdened

i)Enhancedintheexisting
i)
Enhanced in the existing
salaryascomparedwith
IPPs.
ii)PerformanceBased
Incentives

By GOP
ByGOP

Forced
Outages

Med

i)

i)

Continuousfurnaceoil
firing
ii) Frequentleakageof
economizer &
economizer&
iii) Leakageofsuperheater
tubes
iv) FoulingofCondenser
v) Chocking/cloggingofRAH
vi) ErosionofID,FD
Impellers&dampers,
vii) Deteriorationofcooling
towers

ii)
iii)
iv)

Intimeshutdownof ByNPGCL
planned
maintenance
Rehabilitation of
Rehabilitationof
NPGCLMachines
Procurementof
sparewithintime.
Replacementof
damage/deteriorated
partswithintime

...
...

17

ForecastingAssumptions
Block1(Unit
Block
1(Unit1,2&3)TPSMuzaffargarh
FY0809

FY0910

FY1011

FY1112

FY1213

1. TotalGeneration(MkWh)

3385.42

3248.495

3243.84

2988.29*

2944.32*

2 Aux:Consumption(MkWh)
2.
Aux: Consumption (MkWh)

246 65
246.65

259 518
259.518

259 507
259.507

239 063
239.063

235 546
235.546

857526.3

863578.8

875836.8

806837.76

74966.4

4. PlantAvailabilityFactor(%)

81.31

88.46

94.52

86.33

86.3

5. PlantLoadFactor(%)

69.01

66.08

75.57

69.62

68.59

6. Procurementofspareparts
(RsMillion)

88.009

56.411

534.090

78.300

132.500

3. FuleOilConsumption
.(M.T)

*MajorOverhauling/Rehabilitationoftheunitswillbecarriedout

18

ForecastingAssumptions
Block2(Unit
Block
2(Unit4)TPSMuzaffargarh
FY0809

FY0910

FY1011

FY1112

FY1213

1. TotalGeneration(MkWh)

1666.30

1887.05

1420.42

1663.20

1663.20

2 Aux:Consumption(MkWh)
2.
Aux: Consumption (MkWh)

181 532
181.532

202 32
202.32

142 04
142.04

191 26
191.26

191 26
191.26

3. FuleOilConsumption
.(M.T)

387197.4

465570.9

331843

415800

415800

4. PlantAvailabilityFactor(%)

84.31

97.28

74

86

86

5. PlantLoadFactor(%)

67.94

86.16

68

79

79

6. PlantUtilizationFactor(%)

77.64

87.92

66

77

77

7.Procurementofspareparts
p
p
(RsMillion)

32.24

13.98

98.04

164.69

56.588

19

ForecastingAssumptions
Block3(Unit
Block
3(Unit5&6)TPSMuzaffargarh
FY0809

FY0910

FY1011

FY1112

FY1213

1. TotalGeneration(MkWh)

1111.248

927.029

1227.60

1714.17

1714.17

2 Aux:Consumption(MkWh)
2.
Aux: Consumption (MkWh)

136 533
136.533

128 686
128.686

147 312
147.312

205 701
205.701

205 701
205.701

3. FuleOilConsumption
.(M.T)

295093

276012

313038

514253

514253

4. PlantAvailabilityFactor(%)

80.56%

60.50%

75%

88%

88%

5. PlantLoadFactor(%)

43.74%

48.10%

62%

62%

62%

6. PlantUtilizationFactor(%)

35.24%

26.45%

78%

78%

78%

7.Procurementofspareparts
p
p
(RsMillion)

169.334

36.69

40

461

50

20

ForecastingAssumptions
NGPSMultan
FY0809

FY0910

FY1011

FY1112

FY1213

1. TotalGeneration(MkWh)

304.997

193.901

332.64

318.38

304.128

2 Aux:Consumption(%)
2.
Aux: Consumption (%)

13 79%
13.79%

16 68%
16.68%

16 98%
16.98%

17 02%
17.02%

17 08%
17.08%

3. FuleOilConsumption
.(M.T)

99122

78410

138000

133720

127733

4. GasConsumption(Mcf)

938192

17650

19500

20000

20000

5. PlantLoadFactor(%)

49.74

34.05

54.24

52.30

51.50

6. PlantUtilizationFactor(%)

17.86

11.35

19.47

18.63

17.80

7.Procurementofspareparts
p
p
(RsMillion)

21.60

52.50

1300*
1300

150

200

*Purchaseofairpreheaterelements,Rehabilitationofallboilers,Renovationofcoolingtowers,Purchaseof
C W pump Purchase of desilting pump
C.W.pump,Purchaseofdesiltingpump.

21

ForecastingAssumptions
GTPSFaisalabad
FY0809

FY0910

FY1011

FY1112

FY1213

1. TotalGeneration(GWh)

342.937

478.349

617.541

643.555

635.100

2 Aux:Consumption(Gwh)
2.
Aux: Consumption (Gwh)

20 600
20.600

21 680
21.680

33 570
33.570

32 21
32.21

33 570
33.570

3. HSDConsumption.(Ltr)

13148609

49493306

66198849

66299850

64728243

4. GasConsumption
((MMCF))

4943.823

3668.277

4549.892

4975.000

4804.000

5. PlantLoadFactor(%)

24.06

27.58

33.69

34.98

34.53

6. PlantAvailabilityFactor(%)

94.10

95.21

96.32

94.64

95.25

7.Procurementofspareparts
7.
Procurement of spare parts
(RsMillion)

93.83

22.96

118.56

595.55

490.44

22

ForecastingAssumptions
SPSFaisalabad
FY0809

FY0910

FY1011

FY1112

FY1213

1. TotalGeneration(MkWh)

489.84

453.558

500.000

510.000

550.000

2. Aux:Consumption(%)

9.34%

10.24%

8.5%

9%

9.2%

3. FuleOilConsumption
.(M.T)

145000

143495

153000

155000

160000

4 PlantavailabilityFactor(%)
4.
Pl t
il bilit F t (%)

78 74%
78.74%

80 35%
80.35%

82%

83%

85%

5. PlantUtilizationFactor(%)

60.78%

69.03%

71%

73%

76%

6. Procurementofspareparts
(Rs Million)
(RsMillion)

11.281

35.474

82.218

90.414

99.88

23

FinancialSummary
FY08*

FY09*

FY10*

FY11

FY12

FY13

UnitSummary
251.800

246.120

242.350

250.580

259.410

268.920

EPP,Rs/kWh
/k h

7.967
96

10.189

13.39

15.86

14.44

18.07

LossRsMM

267

(1,777)

(2,219)

(1,777)

3,339

3,791

CPP,Rs/kW/m

IncomeStatementSummary,RsMillion
Sales

65,027.38

75,426.51

91,476.35

121,193.52

166,059

199,878

CostofElectricity

63,720.27

77,735.50

93,297.79

122,624.81

162,375

195,694

OperatingExpenses
O
i E

226 17
226.17

277 51
277.51

312

350

393

442

+OtherIncome

211.12

105.85

119

199

246

264

Fin.&otherExp.

107.42

164.13

172

184

198

215

=EBT

1,184.63

(2,644.77)

(2,186.44)

(1,766.29)

3,339

3,791

Taxes

917.84

870.77

26

29

1,169

1,327

=NetIncome
N tI

266 79
266.79

(1 774)
(1,774)

(2 212 44)
(2,212.44)

(1 795 29)
(1,795.29)

2 170
2,170

2 464
2,464

*Actuals

24

FinancialSummary
FY08*

FY09*

FY10(p)

FY11

FY12

FY13

18,040.918

17,168.220

16,189.707

15,918.019

15,184.019

14,058.019

WorkinProgress

48.582

5,799.981

5,799.981

5,799.981

5,799.981

5,799.981

OtherLTAssets

618.20

934,75

14,003.03

660.00

22.00

25.00

32 567 17
32,567.17

24 067 83
24,067.83

28 172 06
28,172.06

36 200 58
36,200.58

49 048 58
49,048.58

58 312 58
58,312.58

11,929.725

10,284.23

1,548.28

18,517.00

28,790.00

39,369.00

63,204.60

58,255.01

65,713.06

77,095.58

98,844.58

117,564.58

Longtermdebt

2,801.72

2,794.87

2,759.00

2,736.00

2,723.00

2669

Otherlongtermliab.

2,627.14

2,311.77

2,715.50

4,020.00

4,826.00

5306

Payable to Fuel Suppliers


PayabletoFuelSuppliers

16,063.83
,

21,403.87
,

42,514.00
,

54,407.81
,

72,061.81
,

87,694.81
,

OtherCurrentLiab.

20,049.54

11,856.13

48.00

51.00

1,183.00

1380

Total Liabilities
TotalLiabilities

41 542 73
41,542.73

38 367 14
38,367.14

48 037 00
48,037.00

61 214 81
61,214.81

80 793 81
80,793.81

97 049 81
97,049.81

BalanceSheetSummary
NetFixedAssets

T d R i bl
TradeReceivables
OtherCurrentAssets
TotalAssets

25

ThankYou

Active Rental Power Plants.


62MWGulfPowerPlant
lf
l
CODdated29.04.2010.
150MWTechno
150MW Techno EpowerSumandriroadFaisalabad
Epower Sumandri road Faisalabad
Partiallycommissionedondated:11.06.2010at
60MW
201MWReshmaPowerPlant
CODyetnotachieved.
200MWYougenPowerPlant
200MW Y
P
Pl t
COD31.12.2010
150MWSahuwalPowerPlant
150 MW Sahuwal Power Plant
CODyetnotdeclared.

02

FinancialSummary(3/3)
FY 08*
FY08

FY 09*
FY09

FY 10*
FY10

FY 11
FY11

FY 12
FY12

FY13

CashflowsSummary
(2,850.763)

3,006.005

7,001.560

5,484.710

8,350.000

8,274.000

48 582
48.582

5 799 981
5,799.981

(915 000)
(915.000)

(392 000)
(392.000)

(384.13)

(5,936.65)

(625.000)

(2.000)

638.000

(3.000)

23.82

17.83

(32.000)

(22.000)

(22.000)

(14.00)

New Long term Loans


NewLongtermLoans

2 500 00
2,500.00

CFFinancingActivities

2,159.30

610.17

(32.00)

(22.00)

(22.00)

(14.00)

O
Oper.ProfitMargin
P fit M i

1 662%
1.662%

3.429%
3 429%

1.991%
1 991%

1.181%
1 181%

1 982%
1.982%

1 872%
1.872%

Opexas%ofSales

98.338%

84.780%

69.905%

52.764%

38.508%

31.993%

Int.CoverageRatio

22.12

(50.35)

(0.33)

(4.97)

12.37

13.97

R&MExpenseas%GFA
&
%G

0 43%
0.43%

0 64%
0.64%

0 55%
0.55%

0 47%
0.47%

0 38%
0.38%

0 36%
0.36%

TradeDebtTurnover

3.34

2.66

3.50

3.77

3.90

3.72

FixedAssetTurnover

3.48

3.16

2.54

5.42

7.91

10.05

9%

9%

8%

9%

8%

7%
%

66%

66%

73%

79%

82%

83%

CFOperatingActivities
Capital Expenditure
CapitalExpenditure
CFInvestingActivities
DebtRepayment

KeyRatios

LTDtoEquity
T.LiabilitytoT.Assets

26

Das könnte Ihnen auch gefallen