Project

AFCONS Chennai Metro Anna

Tower Dwall and Barrette


Check-List

Ref. N 120084
Prepared by: Andr Tonim Revised by: Jorge Duarte Date th 26 of June, 2012

GEO Ground Engineering Operations India Pvt. Ltd. B 38, First Floor, Sector 64, NOIDA, Gautam Buddha Nagar, UP, INDIA Tel No. : Fax No.: +91 120 4322997 +91 22 66459743

Website : www.geosoil.com

Check List - to be available on site

This is a check list of products and equipment and general items required to be available on the site before the work starts. This project includes the execution of 20 Barrettes and 52 panels showed in the following table:

No 20 52

Length (mm) 2,5 5

Width (m) 2,5 1

Depth (m) 32 25

Total Volume (m ) 4000 6500 = 10500

Table 1 Project details 1.1 Products

To be provided by GEO: 9450 kg PolyMud 350 kg MicroBond 1800 kg AlfaBond

To be available on site by Afcons: 15750 kg Sodium Hydroxide, liquid, 50% concentration 1400 kg Sodium Silicate, liquid, 40% concentration 700 kg Sodium Aluminate liquid 40% concentration

1.2

Equipment

To be provided by Afcons: 1 Mixing tank with 30m , equipped with air agitation Storage tanks with a combined capacity of 460m . 1 Silo with 60m3 for water treatment. 1 Sedimentation Tank with 30m . 1 Air compressor with a minimal pressure of 10 bar , ideal 15 bar Pipeline set in place to feed the excavation and other retrieve the slurry from the excavation Water available for slurry mixing should present: CACO3 < 120ppm; Magnesium < 25ppm; Chlorine < 25ppm.
3 3 3

Total volume of water available when the work stars: 460 m3 Connections made between the silos, mixing tank and decantation tank as showed in the illustrations 1, 2, 3 and 4.

Diaphragm pump with capacity to maintain enough supply to the excavation. As an alternative impeller pump may be used. The impeller pumps increase the polymer consumption, which doesnt represent a technical problem. A Diaphragm pump to retrieve polymer upon concrete pouring. As an alternative impeller pump may be used. The impeller pumps increase the polymer consumption, which doesnt represent a technical problem. Marsh Funnel Cone (API) Mud Balance Sand Content kit pH strips (range 1-14, four colours) Bottom Sampler Trash bags - 50 litres capacity 5 10 litres hand buckets

Legend: Slurry Batch Line Pre-Treatment Water Line Slurry Supply Line Slurry Retrieval Line

Figure 1 Batching Plant schematics, general view

Legend: Slurry Batch Line Pre-Treatment Water Line Slurry Supply Line Slurry Retrieval Line

Figure 2 Batching Plant schematics, plant view

Figure 3 Batching Plant schematics, Sedimentation tank view

Figure 4 Batching Plant schematics, mixing tank view