2010 LIST OF EXISTING PLANTS LUZON PLANT Coal Pagbilao Unit 1 Pagbilao Unit 2 Calaca 1 Calaca 2 Masinloc I Masinloc

II Sual I Sual II Quezon Power APEC Diesel Duracom Unit 1 & 2 East Asia Diesel (Duracom Unit 3 & 4) Angeles Calibu DPP Angeles Petersville DPP FPPC- Bauang Dsl FCVC DPP Tarlac Electric Power Trans Asia Power Natural Gas Sta. Rita Natural Gas Ilijan First Gas B (San Lorenzo) Gas Turbine Hopewell GT Limay CCGT CAPACITY, MW Installed Dependable 3,849.00 3,530.71 382.00 382.00 382.00 382.00 300.00 165.00 300.00 184.00 315.00 315.00 315.00 311.00 647.00 645.27 647.00 644.43 511.00 460.00 50.00 42.00 613.68 343.40 133.38 0.00 109.00 0.00 30.00 30.00 9.60 9.60 235.20 215.00 25.60 23.70 18.90 17.10 52.00 48.00 2,861.00 2,756.00 1,060.00 1,038.00 1,271.00 1,200.00 530.00 518.00 720.00 596.00 100.00 30.00 620.00 566.00 LOCATION MUN/PROV Pagbilao, Quezon Pagbilao, Quezon Calaca, Batangas Calaca, Batangas Masinloc, Zambales Masinloc, Zambales Sual, Pangasinan Sual, Pangasinan Mauban, Quezon Mabalacat, Pampanga Navotas, Metro Manila Navotas, Metro Manila Angeles City Angeles City Bauang, La Union Cabanatuan City Capas, Tarlac Norzagaray, Bulacan Sta. Rita, Batangas Ilijan, Batangas City Sta. Rita, Batangas Navotas, Metro Manila Limay, Bataan OWNER TeaM Energy Corporation TeaM Energy Corporation DMCI Holdings, Inc. DMCI Holdings, Inc. Masinloc-Power Partners Ltd. Masinloc-Power Partners Ltd. TeaM Sual Corporation TeaM Sual Corporation Quezon Power Phils. Asia Pacific Energy Corp. Duracom Mobile Power Corp. East Asia Diesel Power Corp. Angeles Electric Corporation Angeles Electric Corporation 1590 Energy Corporation Cabanatuan Electric Corp. Tarlac Power Corporation Trans Asia Power First Gas Power Corp KEPCO (Ilijan) First Gas Power Corp PSALM San Miguel Energy Corp. OWNER TYPE NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC NON-NPC/IPP TYPE OF CONTRACT BOT-ECA BOT-ECA ORIGINAL YEAR COMMISSIONED 3/7/1996 5/26/1996 9/5/1984 6/5/1995 6/18/1998 12/1/1998 10/23/1999 10/5/1999 5/1/2000 7/1/2006 9/1/1995 9/1/1995 12/5/1994 8/30/1994 1/15/1996 July 1995 1997 6/2000 10/2001 6/5/2002 9/1/2002 8/16/1990 3/18/1993 5/14/1993 , 12/10/1994

BOT-ECA BOT-ECA

BOT-ECA/GSPA

BOT-ECA

2010 LIST OF EXISTING PLANTS LUZON PLANT Geothermal MakBan 1 MakBan 2 MakBan 3 MakBan 4 MakBan 5 MakBan 6 MakBan 7 (D) MakBan 8(D) MakBan 9(E) Makban 10(E) Bac Man I-1 Bac Man I-2 Bac Man II-1 Bac Man II (Botong) Tiwi 1 Tiwi 2 Tiwi 3 Tiwi 4 Tiwi 5 Tiwi 6 MakBan Ormat Manito Hydro Large Hydroelectric Plants San Roque HEDCOR Kalayaan 1 & 2 Kalayaan 3 & 4 Magat Caliraya Botocan Angat Pantabangan-Masiway Ambuklao Binga Bakun Casecnan (NIA) CAPACITY, MW Installed Dependable 899.03 499.50 63.20 52.07 63.20 51.13 63.20 56.79 63.20 50.98 55.00 0.00 55.00 0.00 20.00 17.74 20.00 18.95 20.00 16.23 20.00 16.62 55.00 0.00 55.00 0.00 20.00 0.00 20.00 0.00 60.00 54.00 60.00 55.00 55.00 0.00 0.00 0.00 57.00 55.00 57.00 55.00 15.73 0.00 1.50 0.00 2,345.82 2,101.30 2,311.75 2,068.63 411.00 18.35 354.00 355.00 360.00 22.60 22.80 246.00 112.00 75.00 100.00 70.00 165.00 LOCATION MUN/PROV Calauan, Laguna Calauan, Laguna Calauan, Laguna Calauan, Laguna Calauan, Laguna Calauan, Laguna Calauan, Laguna Calauan, Laguna Calauan, Laguna Calauan, Laguna Bacon, Sorsogon Bacon, Sorsogon Bacon, Sorsogon Bacon, Sorsogon Tiwi, Albay Tiwi, Albay Tiwi, Albay Tiwi, Albay Tiwi, Albay Tiwi, Albay Bitin, Bay Laguna Albay OWNER AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. Bac-Man Geothermal Inc. Bac-Man Geothermal Inc. Bac-Man Geothermal Inc. Bac-Man Geothermal Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. AP Renewable Inc. Ormat Inc. USA EDC OWNER TYPE NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC-IPP NON-NPC/IPP TYPE OF CONTRACT ORIGINAL YEAR COMMISSIONED 4/26/1979 7/25/1979 4/22/1980 6/25/1980 6/5/1984 9/10/1984 10/16/1995 11/12/1995 5/22/1996 5/27/1996 9/10/1993 12/12/993 3/15/1994 3/17/1998 1/11/1979 5/25/1979 1/8/1980 4/1/1980 12/20/1981 3/16/1984 2/28/1994 10/1/1998

BTO

411.00 San Manuel,Pangasinan 15.41 354.00 355.00 306.72 23.50 21.94 185.00 112.00 0.00 100.00 Banengbeng,Benguet Kalayaan, Laguna Kalayaan, Laguna Ramon, Isabela Lumban, Laguna Kalayaan,Laguna Norzagaray, Bulacan Pantabangan, Nueva Ecija Bokud, Benguet Itogon, Benguet

San Roque Corporation Hydro Electric Dev't. Corp. (Phils.) CBK Power Company Ltd. CBK Power Company Ltd. SN Aboitiz Power, Inc. CBK Power Company Ltd. CBK Power Company Ltd. PSALM First Gen Hydro Power Corp. SN Aboitiz Power Hydro, Inc. SN Aboitiz Power Hydro, Inc.

NON-NPC/IPP NON-NPC/IPP NPC-IPP NPC-IPP NON-NPC/IPP NPC-IPP NPC-IPP NPC NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP

BOT-PPA BOO-EPSA BROT-PPA BROT-PPA BROT-PPA BROT-PPA

5/1/2003 1/1/1993 8/13/1982 4/25/1982 5/1/2004 8/14/1983 10/24/1983 1942 / 1947 / 1950 1946-48 10/16/1967 6/16/1986 4/1/1977 5/1/1977, 2/27/1981 12/23/1956 1/19/1960 2/6/2001 10/10/2000 4/5/2002

35.06 Alilem, Ilocos Sur 149.00 Pantabangan, Nueva Ecija

HEDCOR (Bakun) NON-NPC/IPP CE Casecnan Water & Energy Co.,Inc. NON-NPC/IPP

BOT-PPA BOT-PPA

2010 LIST OF EXISTING PLANTS LUZON PLANT Small Hydroelectric Plants Cawayan Buhi-Barit NIA-Baligatan NMHC Aqua Grande Amburayan Dawara Bachelor Philex Club John Hay Magat A&B Tumauini Dulangan Balugbog Palapaquin San Juan River Inarihan Yabo Oil Thermal Malaya 1 Malaya 2 Wind Bangui Bay Wind Power Biomass Montalban LFG TOTAL LUZON PHILIPPINES CAPACITY, MW LOCATION Installed Dependable MUN/PROV 34.07 32.67 0.40 0.40 Guinlajon, Sorsogon 2.00 1.80 Buhi, Camarines Sur 6.00 6.00 Ramon, Isabela 11.90 4.50 0.20 0.53 0.75 0.50 0.56 2.52 0.25 1.60 0.65 0.40 0.15 0.96 0.2 650.00 300.00 350.00 33.00 33.00 9.25 9.25 11,980.78 16,358.9 10.70 4.50 0.20 0.53 0.75 0.50 0.56 2.52 0.25 1.60 0.65 0.40 0.15 0.96 0.2 646.14 297.86 348.28 20.00 20.00 5.40 5.40 10,498.45 13,901.5 Bakun, Benguet Pagudpod,Ilocos Norte Supiden,La Union Suyo,Ilocos Sur Natividad,Pangasinan Itogon,Benguet Baguio City Ramon, Isabela Tumauini,Isabela Oriental Mindoro Nagcarlan,Laguna Sn Pablo,Laguna Kalayaan,Laguna Naga,Camarines Sur Pili,Camarines Sur Pililla, Rizal Pililla, Rizal Bangui Bay,Ilocos Norte Rodriguez, Rizal OWNER SORECO II People's Energy Inc. NIA NMHC INEC LUELCO ISECO PANELCO III Philex Mining Corp. ISELCO I ISELCO II ORMECO Phil. Power Dev.Co. Phil. Power Dev.Co. Kalayaan Ice Plant Bicol Hydropower Corp. PROSAMAPI Coop. KEPHILCO KEPHILCO North Wind Power Dev.Corp. Montalban Methane Power Corp. OWNER TYPE NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC-IPP NPC-IPP NON-NPC/IPP NON-NPC/IPP BOO-EPSA TYPE OF CONTRACT ORIGINAL YEAR COMMISSIONED 6/1/2002 9/1/1957 1987 1/1/1993 1983 1991 1981 1983 1988 1984, 1985 1992 1990 1933 1933 1998

ROM-ECA ROM-ECA

9/15/1995 9/15/1995 June 2005 June 2009

Note: Installed Capacity for NPC/NPC-IPP as per NPC Power Economics Dept. data. Dependable capacity of NPC/NPC-IPP based in 2010 NGCP-Daily Operations Report Maximum Available Capacity Non-NPC Installed and Dependable Capacity based on submitted 2010 Monthly Operations Report Excluding off-grid generators

2010 LIST OF EXISTING PLANTS VISAYAS

PLANT VISAYAS Coal Toledo Power Corp. (Sangi Sta) Cebu TPP1 (Salcon) Cebu TPP2 (Salcon) CEDC Coal PEDC Coal KEPCO Coal Diesel Panay Power Corp. Toledo Power Corp. (Carmen Sta) Cebu Private Power East Asia Utilities (MEPZA) PB 103 Panay DPP1 PB 101 PB 102 Bohol DPP 20 MW Bunker Fuel (GBPC) 12.5 MW Bunker Fuel (GBPC) 5 MW Bunker Fuel (GBPC) Guimaras Power Project PDPP III(Pinamucan) Cebu DPP (Salcon) Enervantage DPP Gas Turbine Cebu Land-based GT 1 Cebu Land-based GT 2 Geothermal Negros GPP1 (Palinpinon) Negros GPP2 Leyte GPP Tongonan II & III (Leyte A) Northern Negros GPP

CAPACITY, MW Installed Dependable 785.60 88.80 50.00 56.80 246.00 144.00 200.00 560.36 74.88 45.80 70.00 49.70 32.00 29.20 32.00 32.00 22.00 20.00 12.60 5.00 3.40 66.40 43.38 22.00 55.00 27.50 27.50 963.57 112.50 80.00 112.50 609.20 49.37 501.40 64.00 47.80 50.20 167.40 72.00 100.00 422.48 64.50 37.40 61.72 45.00 18.00 14.58 16.40 13.30 16.50 16.00 12.00 5.00 3.10 61.78 28.50 8.70 42.00 21.00 21.00 751.00 88.60 73.90 88.00 494.00 6.50

LOCATION MUN/PROV

OWNER

OWNER TYPE

TYPE OF CONTRACT

ORIGINAL YEAR COMMISSIONED

Toledo City, Cebu Naga, Cebu Naga, Cebu Toledo City, Cebu

Global Business Power Corp. Salcon Phils. Salcon Phils. Cebu Energy Development Corporation Panay Energy Development Corporation KepCo-Salcon Global Business Power Corp. Global Business Power Corp. Cebu Private Power East Asia PSALM SPC Power Corp. PSALM PSALM SPC Power Corp. Global Business Power Corp. Global Business Power Corp. Global Business Power Corp. Trans-Asia SPC Power Corp. Salcon Phils. Enervantage Suppliers Co. Inc. SPC Power Corp. SPC Power Corp. Green Core Energy Green Core Energy Green Core Energy Energy Development Corporation Energy Development Corporation

NON-NPC/IPP NPC-IPP NPC-IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC NON-NPC/IPP NPC NPC NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC-IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC-IPP NON-NPC/IPP

1993 ROMM-ECA September 1981 ROMM-ECA December 1986 Apr Unit 1 & Jun Unit 2 (2010)

Ingore, Lapaz, Iloilo City Toledo City, Cebu Cebu City Cebu City Estancia, Iloilo Dingle, Iloilo Iloilo Obrero, Iloilo Tagbilaran City La Paz, Iloilo Nabas, Aklan New Washington, Aklan Sn Miguel,Jordan,Guimaras Dingle, Iloilo Naga, Cebu Capiz,Panit-an Cebu Cebu Valencia, Negros Oriental Valencia, Negros Oriental Tongonan, Leyte Tongonan, Leyte Bago City, Northern Negros

1999 1993 1997 1998 April 1981 May 1981/Aug 1983/1993 1978 / 1986 / 1989 April 1981 1978 Feb 2006 Aug 2006 Sep 2006 April 2005 Transferred March 2005 ROMM-ECA 1978 - 1989 BOO

May 1994 May 1994 May / July / Aug 1983 1/1/1994 5/5/1995 3/10/1983 6/18/1983 July 1996 / 1997 January 2007

BOO-PPA

2010 LIST OF EXISTING PLANTS VISAYAS

CAPACITY, MW LOCATION OWNER OWNER TYPE Installed Dependable MUN/PROV Hydro 13.31 13.01 Janopol 5.20 5.00 Bohol Janopol Mini Hydro Corp. NON-NPC/IPP Sevilla Hydroelectric Plant 2.50 2.40 Bohol,Sevilla Sevilla Mini Hydro Corp NON-NPC/IPP Amlan HEP 0.80 0.80 Negros Oriental ICS Renewable NON-NPC/IPP Loboc HEP 1.20 1.20 Loboc, Bohol Sta. Clara International Inc. NON-NPC/IPP Mantayupan 0.50 0.50 Barili,Cebu CEBECO I NON-NPC/IPP Basak 0.50 0.50 Badian,Cebu CEBECO I NON-NPC/IPP Matutinao 0.72 0.72 Badian,Cebu CEBECO I NON-NPC/IPP Ton-ok 1.08 1.08 Calbayog,West Samar SAMELCO NON-NPC/IPP Henabian 0.81 0.81 St.Bernard,Southern Leyte SOLECO NON-NPC/IPP Biomass 29.30 15.00 San Carlos Bioenergy 8.30 7.00 San Carlos, Negros Occidental Bronzeoak Philippines Inc. NON-NPC/IPP First Farmers Biomass Cogen 21.00 8.00 Talisay City, Negros Occidental First Farmers Holding Corp, NON-NPC/IPP TOTAL VISAYAS 2,407.1 1,744.9 PHILIPPINES 16,358.9 13,901.5 Capacity are based on DOE's dependable capacity as of Dec 2004 Note: Installed Capacity for NPC/NPC-IPP as per NPC Power Economics Dept. data. Dependable capacity of NPC/NPC-IPP based in 2010 NGCP-Daily Operations Report Maximum Available Capacity Non-NPC Installed and Dependable Capacity based on submitted 2010 Monthly Operations Report Excluding off-grid generators PLANT

TYPE OF CONTRACT

ORIGINAL YEAR COMMISSIONED May 1992 Nov 2008 May 1961 April 1968 1985 1986 1990 1983 1982 Feb 2009 Feb 2009

2010 LIST OF EXISTING PLANTS VISAYAS


PLANT CEBU SUB-GRID Coal Toledo Power Corp. (Sangi Sta) Cebu TPP1 (Salcon) Cebu TPP2 (Salcon) CEDC Coal KEPCO Coal Diesel Toledo Power Corp. (Carmen Sta) Cebu Private Power East Asia Utilities (MEPZA) Cebu DPP1 (Salcon) Gas Turbine Cebu Land-based GT 1 Cebu Land-based GT 2 Hydro Mantayupan Basak Matutinao PANAY SUB-GRID Diesel Panay Power Corp. PB 103 Panay DPP1 PB 101 PB 102 20 MW Bunker Fuel (GBPC) 12.5 MW Bunker Fuel (GBPC) 5 MW Bunker Fuel (GBPC) Guimaras Power Project PDPP III(Pinamucan) Enervantage DPP Coal PEDC Coal CAPACITY, MW Installed Dependable 907.20 645.74 641.60 429.40 88.80 64.00 50.00 47.80 56.80 50.20 246.00 167.40 200.00 100.00 208.88 172.62 45.80 37.40 70.00 61.72 49.70 45.00 43.38 28.50 55.00 42.00 27.50 21.00 27.50 21.00 1.72 1.72 0.50 0.50 0.50 0.50 0.72 0.72 473.48 305.36 329.48 233.36 74.88 64.50 32.00 18.00 29.20 14.58 32.00 16.40 32.00 13.30 20.00 16.00 12.60 12.00 5.00 5.00 3.40 3.10 66.40 61.78 22.00 8.70 144.00 72.00 144.00 72.00 LOCATION MUN/PROV OWNER OWNER TYPE TYPE OF CONTRACT ORIGINAL YEAR COMMISSIONED

Toledo City, Cebu Naga, Cebu Naga, Cebu Toledo City, Cebu

Global Business Power Corp. Salcon Phils. Salcon Phils. Cebu Energy Development Corporation KepCo-Salcon Global Business Power Corp. Cebu Private Power East Asia Atlas Consolidated Mining & Dev't Corp. SPC Power Corp. SPC Power Corp. CEBECO I CEBECO I CEBECO I

NON-NPC/IPP NPC-IPP NPC-IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC-IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP

1993 ROMM-ECA September 1981 ROMM-ECA December 1986 Testing and commissioning

Toledo City, Cebu Cebu City Cebu City Naga, Cebu Cebu Cebu Barili,Cebu Badian,Cebu Badian,Cebu

1993 1997 1998 ROMM-ECA 1978 - 1989 May 1994 May 1994 1985 1986 1990

BOO

Ingore, Lapaz, Iloilo City Estancia, Iloilo Dingle, Iloilo Iloilo Obrero, Iloilo La Paz, Iloilo Nabas, Aklan New Washington, Aklan Sn Miguel,Jordan,Guimaras Dingle, Iloilo Capiz,Panit-an

Global Business Power Corp. PSALM SPC Power Corp. PSALM PSALM Global Business Power Corp. Global Business Power Corp. Global Business Power Corp. Trans-Asia SPC Power Corp. Enervantage Suppliers Co. Inc. Panay Energy Development Corporation

NON-NPC/IPP NPC NON-NPC/IPP NPC NPC NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP

1999 April 1981 May 1981/Aug 1983/1993 1978 / 1986 / 1989 April 1981 Feb 2006 Aug 2006 Sep 2006 April 2005 Transferred March 2005

2010 LIST OF EXISTING PLANTS VISAYAS


PLANT NEGROS SUB-GRID Geothermal Negros GPP1 (Palinpinon) Negros GPP2 Northern Negros GPP Hydro Amlan HEP Biomass San Carlos Bioenergy First Farmers Biomass Cogen LEYTE-SAMAR SUB-GRID Geothermal Leyte GPP Tongonan II & III (Leyte A) Hydro Ton-ok Henabian BOHOL SUB-GRID Diesel Bohol DPP Hydro Janopol Sevilla Hydroelectric Plant Loboc HEP TOTAL VISAYAS Visayas Sub-grid Cebu Negros Panay Bohol Leyte-Samar Total Visayas CAPACITY, MW Installed Dependable 271.97 184.80 241.87 169.00 112.50 88.60 80.00 73.90 49.37 6.50 0.80 0.80 0.80 0.80 29.30 15.00 8.30 7.00 21.00 8.00 723.59 583.89 721.70 582.00 112.50 88.00 609.20 494.00 1.89 1.89 1.08 1.08 0.81 0.81 30.90 25.10 22.00 16.50 22.00 16.50 8.90 8.60 5.20 5.00 2.50 2.40 1.20 1.20 2,407.14 1,744.89 Installed Capacity 907.20 271.97 473.48 30.90 723.59 2,407.14 Dependable Capacity 645.74 184.80 305.36 25.10 583.89 1,744.89 LOCATION MUN/PROV OWNER OWNER TYPE TYPE OF CONTRACT ORIGINAL YEAR COMMISSIONED

Valencia, Negros Oriental Valencia, Negros Oriental Bago City, Northern Negros Negros Oriental San Carlos, Negros Occidental Talisay City, Negros Occidental

Green Core Energy Green Core Energy Energy Development Corporation ICS Renewable Bronzeoak Philippines Inc. First Farmers Holding Corp,

NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP

May / July / Aug 1983 1/1/1994 5/5/1995 January 2007 May 1961 Feb 2009 Feb 2009

Tongonan, Leyte Tongonan, Leyte Calbayog,West Samar St.Bernard,Southern Leyte

Green Core Energy Energy Development Corporation SAMELCO SOLECO

NON-NPC/IPP NPC-IPP NON-NPC/IPP NON-NPC/IPP

BOO-PPA

3/10/1983 6/18/1983 July 1996 / 1997 1983 1982

Tagbilaran City Bohol Bohol,Sevilla Loboc, Bohol

SPC Power Corp. Janopol Mini Hydro Corp. Sevilla Mini Hydro Corp Sta. Clara International Inc.

NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP

1978 May 1992 Nov 2008 April 1968

% Share, Installed 37.69 11.30 19.67 1.28 30.06

% Share,Dependable 37.01 10.59 17.50 1.44 33.46

2010 LIST OF EXISTING PLANTS

Mindanao
PLANT MINDANAO Diesel Mindanao Energy Systems Cotabato Light Davao Light (Bajada DPP) Gen Santos (SPPC) PB 104 Power Barge 117 Power Barge 118 Western Mindanao Power Corp. NMPC I (Iligan Diesel Plant) NMPC II Geothermal Mindanao I (Mt. Apo) Mindanao II (Mt. Apo) Hydro Large Hydroelectric Plants Agus 1 Unit 1 Agus 1 Unit 2 Agus 2 Agus 4 Agus 5 Agus 6 Agus 7 Pulangi 4 Sibulan HEP Small Hydroelectric Plants Agusan Bubunawan Talomo HEPP Balactasan Kumalarang Mountain View Matling Solar Solar Photovoltaic Coal Thermal Mindanao Coal I Mindanao Coal II TOTAL MINDANAO PHILIPPINES 594.29 18.90 10.00 58.69 59.00 32.00 100.00 100.00 113.00 62.70 40.00 103.23 52.30 50.93 1,040.42 1,024.10 40.00 40.00 180.00 158.10 55.00 200.00 54.00 255.00 42.00 16.32 1.60 7.00 4.47 0.27 0.68 0.80 1.50 1.00 1.00 232.00 116 116 1,970.9 16,358.9 437.84 18.00 6.00 50.00 56.20 22.00 94.95 90.69 100.00 0.00 0.00 99.80 50.00 49.80 907.14 893.30 31.00 30.00 153.00 158.00 52.30 160.00 50.00 225.00 34.00 13.84 1.20 4.89 4.50 0.27 0.68 0.80 1.50 1.00 1.00 212.40 107 106 1,658.2 13,901.5 Cagayan de Oro City Cotabato Davao City Alabel, Sarangani Brgy Ilang,Davao Naspit, Agusan del Norte Maco, Davao del Norte Sangali, Zamboanga City Dalipuga, Iligan City Dalipuga, Iligan City Kidapawan, North Cotabato Kidapawan, North Cotabato Mindanao Energy Systems Cotabato Light Davao Light Alsons Power Holding Corp. PSALM Therma Mobile Inc. Therma Marine Inc. Alsons Power Holding Corp. PSLAM PSLAM Marubeni Energy Services Corp. Marubeni Energy Services Corp. NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC-IPP NPC NON-NPC/IPP NON-NPC/IPP NPC-IPP NPC NPC NPC-IPP NPC-IPP 8/25/1995 6/5/1995 3/26/1998 Sep 2005 2/26/1994 7/20/1994 12/121997 3/22/1992 7/11/1993 12/15/1996 6/17/1999 CAPACITY, MW Installed Dependable LOCATION MUN/PROV OWNER OWNER TYPE TYPE OF CONTRACT ORIGINAL YEAR COMMISSIONED

BOO-ECA

BOO-ECA

BOO-PPA BOO-PPA

Marawi City,Lanao Sur Marawi City,Lanao Sur Saguiaran, Lanao Sur Baloi, Lanao del Norte Buru-un, Iligan City Buru-un, Iligan City Buru-un, Iligan City Maramag, Bukidnon Santa cruz, Davao del Sur M. Fortich, Bukidnon Baungon,Bukidnon Mintal, Davao City Lamitan,Basilan Lantawan,Basilan Valencia,Bukidnon Malabang,Lanao del Sur

PSALM PSALM PSALM PSALM PSALM PSALM PSALM PSALM HEDCOR Sibulan Inc. First Generation Holdings Corp. BPC Inc. HEDCOR BASELCO BASELCO Matling Indisutrial Corp.

NPC NPC NPC NPC NPC NPC NPC NPC NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NON-NPC/IPP NPC-IPP NPC-IPP BOT-PPA BOT-PPA

6/23/1992 3/30/1994 6/6/1979 11/27/1979 3/16/1985 4/16/1985 2/9/1985 3/8/1985 7/1/1953 4/28/1971 3/5/1983 12/17/1983 12/21/1985 6/21/1986 April 2010 (Unit I) 12/28/1957 9/22/2001 10/1/1998 1983 1989 1982

Sitio Lomboy,Cagayan de Oro CEPALCO PHIVIDEC,Villanueva,Misamis STEAG State Power Inc. Orriental STEAG State Power Inc.

September 2004 Sept.16,2006 Nov. 15, 2006

Note: Installed Capacity for NPC/NPC-IPP as per NPC Power Economics Dept. data. Dependable capacity of NPC/NPC-IPP based in 2010 NGCP-Daily Operations Report Maximum Available Capacity Non-NPC Installed and Dependable Capacity based on submitted 2010 Monthly Operations Report Excluding off-grid generators

2010 Installed and Dependable Capacity by Ownership

Luzon Grid NPC NPC - IPP Non-NPC Total Visayas Grid NPC NPC - IPP Non-NPC Total Mindanao Grid NPC NPC - IPP Non-NPC Total Philippines Grid NPC NPC - IPP Non-NPC Total

Capacity (MW) Installed Dependable 346 215 1,820 1,765 9,814 8,519 11,981 10,498 Capacity (MW) Installed Dependable 96 48 759 621 1,552 1,077 2,407 1,745 Capacity (MW) Installed Dependable 1,117 881 507 468 347 308 1,971 1,658 Capacity (MW) Installed Dependable 1,559 1,144 3,087 2,853 11,713 9,904 16,359 13,902

Percent Share (%) Installed Dependable 3 2 15 17 82 81

Percent Share (%) Installed Dependable 4 3 32 36 64 62

Percent Share (%) Installed Dependable 57 53 26 28 18 19

Percent Share (%) Installed Dependable 10 8 19 21 72 71

2010 CAPACITY MIX, SUMMARY


LUZON Capacity (MW) Percent Share (%) Installed Dependable Installed Dependable 3,849 3,531 32.13 33.63 1,984 1,586 16.56 15.10 614 343 5.12 3.27 650 646 5.43 6.15 720 596 6.01 5.68 2,861 2,756 23.88 26.25 899 500 7.50 4.76 2,346 2,101 19.58 20.02 33 20 0.28 0.19 9 5 0.08 0.05 11,981 10,498 VISAYAS Capacity (MW) Percent Share (%) Installed Dependable Installed Dependable 786 501 32.64 28.74 615 464 25.56 26.62 560 422 23.28 24.21 55 42 2.28 2.41 964 751 40.03 43.04 13 13 0.55 0.75 29 15 1.22 0.86 2,407 1,745 MINDANAO Capacity (MW) Percent Share (%) Installed Dependable Installed Dependable 232 212 11.77 12.81 594 438 30.15 26.40 594 438 30.15 26.40 103 100 5.24 6.02 1,040 907 52.79 54.71 1 1 0.05 0.06 1,971 1,658 PHILIPPINES Capacity (MW) Percent Share (%) Installed Dependable Installed Dependable 4,867 4,245 29.75 30.53 3,193 2,488 19.52 17.90 2,861 2,756 17.49 19.83 1,966 1,350 12.02 9.71 3,400 3,021 20.78 21.73 33 20 0.20 0.14 1 1 0.01 0.01 39 20 0.24 0.15 16,359 13,902

PLANT TYPE Coal Oil Based Diesel Oil Thermal Gas Turbine Natural Gas Geothermal Hydro Wind Biomass TOTAL

PLANT TYPE Coal Oil Based Diesel Gas Turbine Geothermal Hydro Biomass TOTAL

PLANT TYPE Coal Oil Based Diesel Geothermal Hydro Solar TOTAL

PLANT TYPE Coal Oil Based Natural Gas Geothermal Hydro Wind Solar Biomass TOTAL