FC costs are function of material price level and labor costs Material costs most often follow world market price levels Labor costs are function of hourly rates and productivity Labor costs are specific for the region or even country specific
Labor Labor
Material
Material
Western World
Significant less data required for foreign country estimates Less effort for data maintenance Available data for certain items can be used for similar other items were no data is available (e.g. similar equipment types) Analogies for different countries with similar economical boundary conditions possible BASF maintains factors for approx. 40 countries w/ up to 165 factors per country
Bezeichnung Civil
Kanle Straen Parkpltze Grnanlagen Gleise Weichen Rohrbrcken Pfahlgrndung Erdarbeiten (incl. Erschlieung) Betonbau Stahlbau Ausbau (Fenster, Tren, Dachdeckarbeiten) Sureschutz Brandschutz Technische Bearbeitung Bauleitung Bauhilfsarbeiten
DomAnteil
100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00%
Imp.Ant.
0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00%
Dom.Fakt.
1,19 1,19 1,19 1,19 1,19 1,19 1,19 1,20 1,20 1,20 1,32 0,84 0,84 0,84 1,26 1,26 1,14
Different factors for different cost groups and even different cost items required (up to 165 per country in order to cover different project structures) Equipment, civil, electrical & instrumentation, piping etc. Carbon steel / stainless steel Domestic / imported Execution strategy EPC, complete owners engineering etc.
. . . Equipment
Wasserpumpe, CS, P<15kW Wasserpumpe, SS, P<15kW Chemie-Normpumpe, CS, einfache Ausfhrung Chemie-Normpumpe, SS, einfache Ausfhrung Chemie-Normpumpe, CS, >250m/h, >200m Chemie-Normpumpe, SS, >250m/h, >200m Spaltrohrmotorpumpe, CS Spaltrohrmotorpumpe, SS Magnetgekuppelt, CS, P<7,5 kW Magnetgekuppelt, SS, P<7,5 kW Dosierpumpe, CS Dosierpumpe, SS Ventilator, CS Ventilator, SS Vakuumpumpe, low power, dp<600mbar Klteanlage N2-Verdichter Proze-Verdichter, Schraubenverdichter l-freie Verd. p<100bar, Wasserstoff-Verd. Hebeeinrichtungen Frdereinrichtungen 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 100,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 0,00% 1,21 1,21 1,21 1,21 1,21 1,21 0,88 0,88 0,88 0,88 1,05 1,05 1,02 1,02 1,10 1,01 1,10 1,10 1,10 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 1,13 0,06% 0,30% 0,26% 1,23% 0,06% 0,30% 0,28% 1,47% 0,38% 1,68% 0,06% 0,26% 0,30% 1,45% 1,25% 7,27% 0,12% 0,52% 0,12% 3,03% 3,33%
. . .
Analogy Method
Mathematical Method
Internal Sources: Executed Projects Frame Contracts for Material & Services Hourly Rates & Productivity Evaluation
External Sources: Public or Purchased Data e.g. EC Harrison, Eurostat, IPA-Reports etc. Contractor Data Regional experienced contractors
DIN
100.000 status
ASME
Kostenbasis Lu
10.000
Heat. Exch. Area: 1000 sq. ft Tubeside pressure: 580 psi Shellside pressure: 145 psi
Estimated costs LU: 31.500 EUR Factor 0,9 EUR-USA 28.500 EUR
K s n [D ] o te M
LU Conditions
Foreign Conditions
Factor includes code & standard conversion and labor & productivity adjustment
8
Analysis of executed projects serves as a main source for foreign country factors Re-estimating as built quantities with most current tools & cost data Calculating foreign country factors for each Cost Item Evaluating factors by printing graphs and applying a smoothing function
s pecification
Material
Flow (m/h)
Head
Seal
Unit
LU Price (Euro)
faktor
SS
10
30
Single
4900
30
30
5300
30
30
Single
4600
SS
30
30
Canned
7900
Goods basket with Key Quantities for all disciplines available Contractor or local engineering unit should be able to fill out Due to complexity of key quantities and specific costs explanation required
s pecification
Power (kW)
Voltage (V)
Other
Unit
LU Price (Euro)
G u D , Eu m t ro p -G q ip en
Motor
400 ...
s pecification
Material
Area [m)
Unit
LU Price (Euro)
6000
9000
3000
s pecification
Material
Capacity [m)
Unit
LU Price (Euro)
SS
20
15 / (-1)
80000
CS
29000
SS
100
49000
FRP
35000
CS Vertical Ves s el SS 10 4
13000
19000
Planning Package for fictitious plant available Civil description, P&IDs, equipment list, pipeline list, instrument list Utilized for factor evaluation with contractors and inhouse engineering units
Analogy Model
X-Country
Singapur
Dez 99
Date
Domestic-Faktoren
Umfang Quelle 1 Quelle 2
1
Gruppe
Singapur X-Country min 0,95 0,95 0,95 0,90 0,90 0,92 0,89 0,93 1,00 0,93 0,92 0,99 0,99 0,98 0,98 1,07 1,04 1,06 1,05 1,03 1,03 1,03 1,04 durch. 0,90 0,90 0,90 0,87 0,87 0,88 0,87 0,89 0,93 0,89 0,88 0,93 0,93 0,93 0,93 1,07 1,03 1,06 1,05 1,02 1,02 1,02 1,03 max 0,85 0,85 0,85 0,84 0,84 0,85 0,84 0,85 0,86 0,85 0,85 0,88 0,87 0,89 0,88 1,07 1,02 1,06 1,04 1,00 1,00 1,00 1,02
Spalte
GesamtFaktor gewhlt
Vergleichen mit
Y-Country China China
Well known country of the same region used as a reference Labor costs & efficiencies needs to be similar Raw material availability (eg. steel mills etc.) needs to be comparable Serves as Check & Balance during factor evaluation process
D-G
1,8 2,7 1,8 2,7 4 30 26,2 9,1 10,1 11,6 100 49,5 11,7 38,8 100 30 40 30 100 25 10 13 52
Erschlieung Straen Kanle Rohrbrcken Pfhlung Beton Stahlbau Ausbau Techn. Bearb. Bauhilfsarb. Durchschnitt Gr. A Isolierung Anstrich HKL Durchschnitt Gr. B Fahrzeuge, Werkz. Laborg., Mbel EDV Durchschnitt Gr. C Serienmasch. Sondermaschinen Apparate CS Apparate SS
0,66 0,66 0,66 0,66 0,83 1,02 1,02 1,02 1,02 0,83 0,96 1,18 0,83 1,00 1,07 1,22 0,61 1,00 0,91 0,93 1,22 0,93 1,22
< = D ie s e r A n te il ndern
2 Verteilung Material-Anteil = Rohr CS 2 (LW=Landeswhrung) x % Dom."Offshore"-Anteil + (1-x) % Dom."Onshore"-Anteil Rohr SS 2 x = 0,95 Platte Fertigungs-Anteil MaschMaterial-Anteil Gruppe Gre GesamtMat.- Domestic Domestic Offshore - Onshore - Fert.- Faktor Arbeits- Arbeits- Anteil Faktor anteil "Offshore" - "Onshore" - Faktor Faktor Anteil anteil Faktor Masch-Faktor Anteil Anteil
Exchange
For equipment for instance material, fabrication & labor and onshore & offshore portion is calculated separately Respective factors for the different portions above are applied and a composite factor is calculated The factor from other methods will be compared with the composite factor as a plausibility check
30% 33% 36% 50% 70% 44% 40% 50% 60% 65% 70% 57% 55% 58% 60% 60% 60% 59%
29% 31% 34% 48% 67% 42% 38% 48% 57% 62% 67% 54% 52% 55% 57% 57% 57% 56%
2% 2% 2% 3% 4% 2% 2% 3% 3% 3% 4% 3% 3% 3% 3% 3% 3% 3%
70% 67% 64% 50% 30% 56% 60% 50% 40% 35% 30% 43% 45% 42% 40% 40% 40% 41%
70% 67% 64% 50% 30% 56% 60% 50% 40% 35% 30% 43% 45% 42% 40% 40% 40% 41%
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
0,78 0,79 0,80 0,85 0,91 0,83 0,81 0,85 0,88 0,90 0,91 0,87 0,86 0,87 0,88 0,88 0,88 0,88
Durchschnitt Gr. A
Factors were influenced by inflation rates from home base country and foreign country Update to current conditions necessary for estimating purpose
USGC Lu
Factor = 0,9
old (1990)
Factor = 1,4
MoE (2009)
Historical
Forecast
Ration of inflation rates can be used for update Reevaluation necessary after certain period of time
Factor
DOMESTIC Foreign
Specific Costs
Project Scope
Country
Costs
IMPORTED
Exchange Rate
15
MADEINUSA
DIN
s ta tu s 1 00 .0 0 0
Kostenb asis Lu
10 .0 0 0
p =6 / 6
1 .0 0 0 1 10 100 W rme a u st a u sc h fl ch e [m ] 10 0 0
(=1.4541) Heat. Exch. Area: 1000sq. ft (=93m) Tubesidepressure: 580 psi (=40bar) S hellside pressure: 145psi (=10bar)
Estimating of cost items with home database per today (overnight) Application of factors & related exchange rate (reverse calculation from factor evaluation) Application of foreign country inflation rate to midpoint of expenditure
K o s te n
[D
LUConditions
Foreign C onditions
Site Influences:
Economic Influences:
Currency parities
Climatic conditions Legal requirements, codes, standards Salary level Existing infrastructure and logistics
Duties/Taxes
Import/Domestic Split
Execution Strategy
17
Scope is not comparable e.g. Verbund site vs. stand alone site Factors from former projects applied with different exchange rate High inflation ratio compared to former project (e.g. situation at Gulf Coast region after hurricane Katrina) Different execution strategies apply
19