SECTION 02200 EARTHWORK
PART 01 GENERAL 1.01 SECTION INCLUDES A. Transporting, placing, spreading, moisture-conditioning and compaction of all types of earth or rock materials in area to be occupied by facilities within the KAUST project site, as shown on drawings.

1.02

RELATED SECTIONS A. Section 01500 Section 02210 Contractors Temporary Facilities. Excavation, Trenching, Backfilling and Compacting. De-watering

DATE JOB/EWO

B.

C.

Section 02240

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

1.03

REFERENCES A. ASTM D 422 Standard Test Method for Particle Size Analysis of Soils. Standard Test Method for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. Standard Classification of Soils and Soil Aggregate Mixture for Highway Construction Purpose. AASHTO M145 Classification of Soil and Soil Aggregate Mixtures for Highway Construction Purposes.

PROJECT ENGINEER
____________ DATE

B.

ASTM D 4318

CERTIFIED

C.
_ __________
DATE: ________

ASTM D 3282

CONSTRUCTION AGENCY
________________ DATE:

D.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

1.04

SUBMITTALS A. Comply with Section 01340. Submit Method Statement, with the following documents to the Engineer for information and approval. 1. Excavation Plan including setting out and marking of existing utilities. i. Filling Plan
SECTION 02200

Date:

B.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDING

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA


JOB/EWO#

VE-417361 BI-25-00002

RABIGH

1 OF 5

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

REV. NO.

DESCRIPTION

ENGG

CERT

PMT

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


ii. iii. iv. 2. 3. Control of Water Plan Equipment to be used Supervision and Control procedures

Quality Control Programme. Weekly and Monthly Quality Control Reports. Analysis Reports of the results of testing as required in Section 02210.

DESCRIPTION

4. 1.05

QUALITY ASSURANCE A. Submit for the Engineers approval the proposed programme for inspection and testing by an approved Independent Testing Laboratory, so as to achieve the specified quality. Inspection by an approved Independent Testing Laboratory shall be in addition to, not instead of inspection by the Engineer. Maintain a qualified representative on-site during all earthwork operations. Weekly Quality Control Report: Present the Engineer with a Quality Control Report at weekly intervals summarizing the following: 1. 2. 3. 4. Daily Inspection Reports. Material Delivery Records. Test Results (from previous weeks samples). Samples taken this week and amount of work represented by each individual sample. Quality Control Performance.

B.

C.

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

5. D.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Monthly Quality Control Report: Present the Engineer with a Quality Control Report at monthly intervals summarizing the following: 1. 2. Weekly Quality Control Reports. Control Charts (showing previous results/control measurements, etc.) 60 days plotted test

3. 4. 5.

Proposed Quality Control Programme improvements. Revisions to frequency of testing. Work for which Taking Over is requested.
SECTION 02200

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDING

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA


JOB/EWO#

VE-417361 BI-25-00002

RABIGH

2 OF 5

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

REV. NO.

DATE JOB/EWO

ENGG

CERT

PMT

Date:

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


The monthly Quality Control Report shall be approved by the Engineer before being admissible as a contract record. PART 02 PRODUCTS 2.01 MATERIALS A. Satisfactory soil materials for backfilling and fill are defined as those belonging to soil classification group A-1, A-2-4, A-2-5 and A-3 in accordance with ASTM D 3282 or AASHTO M145-87 and the maximum particle size shall be 80 mm. Obtain suitable fill material either from processed, waste products of rock crushing and screening plants, or borrowed (excavated or dredged) from approved natural soil deposits. Unsuitable fill material shall include but not be limited to the following: 1. Material not meeting the requirements specified in paragraphs 2.01 A and 2.01 B. Material from Sabkha areas. Perishable and organic materials. Materials containing scrap, debris and garbage.

B.

REV. NO.

DATE JOB/EWO

C.

2. 3. 4. D.

DISCIPLINE ENGINEER
__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

Fill material shall be from one or more of the sources listed below: 1. Borrow areas provided by the Contractor and approved by the Engineer. Commercial sources proposed by Contractor and approved by the Engineer.

CERTIFIED _ __________
DATE: ________

2.

CONSTRUCTION AGENCY
________________ DATE:

E.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

Designation or approval of a borrow area does not mean that all material within that area is suitable fill material. Only suitable soils from such areas shall be placed in the Work and any unsuitable materials in lenses, layers or other types of inclusions in these areas shall be carefully removed and discarded. Ensure that materials obtained from borrow areas comply with the requirements of the specification. Supply all water required for construction including dust control, moisture-conditioning of fill material during compaction and any other of his needs. Freshwater shall be used for soil compaction where soil layer is expected to be in contact with the proposed concrete foundation unless approved otherwise by Engineer.
SECTION 02200

Date:

F.

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDING

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA


JOB/EWO#

VE-417361 BI-25-00002

RABIGH

3 OF 5

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


PART 03 EXECUTION 3.01 GENERAL A. Before the surface of any part of the work site is disturbed or the Work thereon are commenced observe and record levels and locations of such points over it as are agreed with the Engineer. Excavation or filling shall not commence until prior approval of the Engineer has been obtained.

3.02

CONTROL OF WATER A. Keep all work well drained at all times and ensure that all work is carried out in the dry in accordance with the "Method Statement" for the control of water as prepared and recommended by the Contractor and approved by the Engineer. Construct, operate and maintain all temporary dams, watercourses and other Work of all kinds including pumping sets, wellpoint installations and relief well systems that may be necessary to exclude water from the work place or ensure stability of excavations while construction is in progress. Such temporary Work and plant shall include spare units kept ready for immediate use in case of breakdowns, and shall not be removed without the approval of the Engineer. Design pumping units for drainage sumps, well-point installations and relief well systems specifically for the type of service required. Whenever, in the opinion of the Engineer the methods to control water are inadequate, the Engineer reserves the right to direct to install, operate and maintain wellpoint systems and relief well systems. notwithstanding any previous acceptance of such methods. No payment shall be made for water control systems installed, operated and maintained at the direction of the Engineer and its cost shall be considered to be included in the Contract Price. Make provision for the discharge or removal from the work of all water and waste products howsoever arising and provide suitable temporary pipes, flumes or channels, using methods of disposal approved by the Engineer. Keep all excavations free from water during the complete course of construction of the work.

__ ________ _ DATE: ________

REV. NO.

DATE JOB/EWO

B.

DISCIPLINE ENGINEER

PROJECT ENGINEER
____________ DATE

C.

CERTIFIED _ __________
DATE: ________

CONSTRUCTION AGENCY
________________ DATE:

D.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

E.

Date:

3.03

DISPOSAL OF SURPLUS MATERIAL A. Do not remove from the site or dispose of surplus excavated material from site except as directed or approved by the Engineer. Dispose of surplus excavated material off-site only at locations approved by the local municipality.
SECTION 02200

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDING

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA


JOB/EWO#

VE-417361 BI-25-00002

RABIGH

4 OF 5

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

DESCRIPTION

ENGG

CERT

PMT

Saudi Aramco 2616-ENG (3/99)


OPERNS.

SAUDI ARAMCO OIL COMPANY


B. Use surplus excavated material suitable for fill to replace other materials unacceptable as fill within the work site, or for other purposes in locations determined by the Engineer without additional payment. Haul away surplus excavated materials not required for purposes specified above to spoil areas, dump and grade, all as approved by the Engineer, without any additional payment for the same.

C.

3.04 A.

FILL General: 1. Do not fill material until the surface of the subsoil to receive the fill is cleaned, prepared as specified, and free of standing or running water, and approved by the Engineer.

B.

Methods: 1. Utilize only such methods for placement and compaction of the fill for which prior approval from the Engineer is given. Place and compact all fill in an orderly manner using equipment maintained in first class operating condition. Fill and level ruts in the surface of any layer prior to compaction. Compact in layers as specified for different kinds of fill. Refer to Section 02210. Operate vibratory rollers while compacting within the manufacturer's recommended frequency range for the type of material being compacted and at the optimum operating frequency.

2.
DISCIPLINE ENGINEER
__ ________ _ DATE: ________

PROJECT ENGINEER
____________ DATE

3.

CERTIFIED _ __________
DATE: ________

4.

CONSTRUCTION AGENCY
________________ DATE:

3.05

DUST AND NOISE CONTROL A. B. Comply with Section 01500. Use all means necessary to control dust on and near the work and on and near all borrow areas. Moisture thoroughly all surfaces as required to prevent dust being a nuisance or a hazard to the public and concurrent performance of other work on the site.

OPERATIONS
______________ DATE:_________ REVISION CERTIFICATION EDSD VERIFICATION THIS INDICATES THAT REV. NO.________ OF THIS DRAWING IS COVERED, FOR ALL APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER BY DRAWING COMPLETION CERTIFICATE (DCC) NO.: __________________________ By:

C.
Date:

END OF SECTION 02200


SECTION 02200

CONSTRUCTION SPECIFICATIONS
KAUST TOWN CENTER RESIDENTIAL & COMMUNITY SUPPORT BUILDING

DWG. TYPE PLANT NO. INDEX

DRAWING NO.

SHT. NO. REV. NO.

DOC

K55 SAUDI ARABIA


JOB/EWO#

VE-417361 BI-25-00002

RABIGH

5 OF 5

00

14-Sep-07

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

REV. NO.

DATE JOB/EWO

DESCRIPTION

ENGG

CERT

PMT

Das könnte Ihnen auch gefallen