Item Element description Total quantity Units Estimated quantity in various condition states 1 2 3 No damage Sevirity: Low Sevirity: Medium 0.00 23.36 15.36 81.50 12.08 43.05 0.00 29.20 51.10 21.75 0.00 77.96 3.00 0.00 133.74 0.00 A CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n OSCI=1 OSCI=2 OSCI=3 OSCI=4 when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256 3.00 0.00 0.00 0.00 0.00 0.00 2.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 0.00 0.00 0.00 2.81 2.56 0.00 0.00 0.00 0.00 10.87 0.00 0.00 0.00 0.00 28.37 0.00 R 3.00 ESCI (Eq1) Si Mi ESCI*Si*Mi
4 Sevirity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.86 0.00 0.00 I 3.00
1 2 3 4 5 6 7 8 9
Bearing Abutment & dirt wall Wing Wall Concrete deck Slab Concrete abutment & pier caps Piers RCC / PSC/Steel girder Expansion joints Approach carriageway
0.00 23.36 15.36 84.32 14.65 45.31 0.00 29.20 51.10 21.75 0.00 77.96 3.00 23.10 162.12 0.00
0.000 1.000 1.000 1.067 1.350 1.050 0.000 1.000 1.000 2.500 0.000 1.000 1.000 2.400 1.350 0.000
3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4
3 2 2 2 2 2 4 3 3 3 3 3 3 2 3 2
0 4.00 4.00 6.40 10.80 8.40 0.00 3.00 3.00 7.50 0.00 3.00 3.00 4.80 4.05 0.00 61.95
0 1 1 1 1 1 0 1 1 1 0 1 1 1 1 0
Year of construction Road type Number of Span Each span length(m) Total length of the bridge(m) Width of bridge(m) Total plan area(m^2) Number of pier Top width of pier(m) Bottom width of pier(m) Height of pier(m) Length of return/wing wall(m) Number of bearings Thickness of superstructure (m) width of bridge between kerbs
NA SH 3 3.85 11.55 7.3 84.315 2 0.8 1 1.3 2.4 0 0.3 6.75 0.3 22 3.1416 198 0.00
10 Batter protection 11 General cleaning 12 Wearing surface 13 Waterway Parapet/Railing/Crash 14 barrier 15 Floor protection work 16 Foundation
(ESCI*SI*CPIL)
Thickness of caps Length of curtain wall for bed 12 protection.(m) Length of toe wall for approach slope.(m) Plan area for Flexible apron Plan area for Rigid apron
3.12
16.109
16<SHI<81
OSCI = 3
6 7 8 9 10 11 12 13 14 15 16 17 18
m2
2245
0 0 0 0 0 0 0 0 2 0 0 0 0
0 0 0 0 0 0 0 0 91 0 0 0 0
NA NA NA NA NA NA NA NA NA NA NA NA
2 of 3
1376 1115 3561 1328 4897 4901 47 1354 12073 800 2178 129 1114 611 10000
3 2 1 0 0 13 0 0 0 26 0 0 0 2 LS LS
Providing Drainage Spouts complete as per drawing and Technical specification no. Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint Each black or any other approved colour to give an even shade) bridge Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for
Total Cost : 127 672 Cost of Bridge per m2 of plan area 1 514