Bridge unique id : D13_R01_CH 8.

600 (Hindol-Maidharpur)
Item Element description Total quantity Units Estimated quantity in various condition states 1 2 3 No damage Sevirity: Low Sevirity: Medium 0.00 23.36 15.36 81.50 12.08 43.05 0.00 29.20 51.10 21.75 0.00 77.96 3.00 0.00 133.74 0.00 A CF=0411 A+0 120E+0. 107R+0.362I SHI=CF*{(ESCI*SI*MI)/n OSCI=1 OSCI=2 OSCI=3 OSCI=4 when SHI=1 when 1<SHI =< 16 when 16<SHI<81 when 81<SHI<256 3.00 0.00 0.00 0.00 0.00 0.00 2.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 E 4.00 0.00 0.00 0.00 2.81 2.56 0.00 0.00 0.00 0.00 10.87 0.00 0.00 0.00 0.00 28.37 0.00 R 3.00 ESCI (Eq1) Si Mi ESCI*Si*Mi

4 Sevirity: High 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.86 0.00 0.00 I 3.00

1 2 3 4 5 6 7 8 9

Bearing Abutment & dirt wall Wing Wall Concrete deck Slab Concrete abutment & pier caps Piers RCC / PSC/Steel girder Expansion joints Approach carriageway

0.00 23.36 15.36 84.32 14.65 45.31 0.00 29.20 51.10 21.75 0.00 77.96 3.00 23.10 162.12 0.00

each m2 m2 m2 m3 m2 m2 m m2 m2 each m2 each m m2 m2

0.000 1.000 1.000 1.067 1.350 1.050 0.000 1.000 1.000 2.500 0.000 1.000 1.000 2.400 1.350 0.000

3 2 2 3 4 4 4 1 1 1 1 1 1 1 1 4

3 2 2 2 2 2 4 3 3 3 3 3 3 2 3 2

0 4.00 4.00 6.40 10.80 8.40 0.00 3.00 3.00 7.50 0.00 3.00 3.00 4.80 4.05 0.00 61.95

0 1 1 1 1 1 0 1 1 1 0 1 1 1 1 0

Year of construction Road type Number of Span Each span length(m) Total length of the bridge(m) Width of bridge(m) Total plan area(m^2) Number of pier Top width of pier(m) Bottom width of pier(m) Height of pier(m) Length of return/wing wall(m) Number of bearings Thickness of superstructure (m) width of bridge between kerbs

NA SH 3 3.85 11.55 7.3 84.315 2 0.8 1 1.3 2.4 0 0.3 6.75 0.3 22 3.1416 198 0.00

10 Batter protection 11 General cleaning 12 Wearing surface 13 Waterway Parapet/Railing/Crash 14 barrier 15 Floor protection work 16 Foundation
(ESCI*SI*CPIL)

Thickness of caps Length of curtain wall for bed 12 protection.(m) Length of toe wall for approach slope.(m) Plan area for Flexible apron Plan area for Rigid apron

3.12

SHI = 61.95 X 3.12 / 12

16.109

16<SHI<81

OSCI = 3

D13_R01_CH 8.600 - (Hindol-Maidharpur Road)


Sl. No. 1 2 3 4 5 16.8 16.3 16.6 MORTH Ref. 2.3 Item description Clearing and uprooting rank vegetation, bushes, shrubs, saplings etc including removal and disposal. Cleaning and Greasing of Metallic bearings complete as per Technical specification Applying epoxy mortar over leached, honey combed and spalled concrete surface and exposed steel reinforcement complete as per Technical specification (10mm thick) Guniting concrete surface with cement mortar applied with compressor after cleaning surface and spraying with epoxy complete as per Technical specification (25mm thick). Patching of damaged concrete surface with polymer concrete and curing compounds, initiator and promoter, available in present formulations, to be applied as per instructions of manufacturer and as approved by the Engineer. Jacketing of concrete surface and exposed steel reinforcement complete as per Technical specification using 200mm thick M 30 grade concrete including reinforcement(@ 40 kg per m3), formwork etc and all accessories to complete the work. Supplying ,hoisting, fixing steel joists in superstructure including painting and all required materials complete. 14.2 Supplying, fitting and placing HYSD bar reinforcement complete as per drawing and technical specifications Drilling of holes in existing concrete and fixing new reinforcement with epoxy mortar grout but excluding cost of reinforcement 16.11 Epoxy bonding of new concrete to old concrete 12.5 13.1 13.4 13.2 13.5 16.4 16.5 16.7 Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering, as per drawing and technical specifications Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Pointing with cement mortar (1:3 ) on brick work/stone work in substructure as per Technical specifications Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications Providing and inserting nipples with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary of nipples after completion of grouting with Cement/Epoxy Sealing of crack / porous concrete with cement grout by injection process through nipples / grouting complete as per clause 2803.1. Sealing of crack / porous concrete with Epoxy Grout by injection through nipples complete as per clause 2803.1. Unit m2 no. m2 m2 m2 Rate a

POOR < 30m


Amount Quantity a LS 0 5 0 0 1 000 0 2 886 0 0 NA NA NA Remarks

10 1093 537 1155 2580

6 7 8 9 10 11 12 13 14 15 16 17 18

m2

2245

0 0 0 0 0 0 0 0 2 0 0 0 0

0 0 0 0 0 0 0 0 91 0 0 0 0

NA NA NA NA NA NA NA NA NA NA NA NA

tonne 75000 tonne 76097 no. m2 m3 m3 m3 m2 m2 no. kg kg

466 663 5064 5145 3561 40 100 501 66 925

2 of 3

D13_R01_CH 8.600 - (Hindol-Maidharpur Road)


Sl. No. 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 16.2 5.14 14.4 15.11 MORTH Item description Ref. 16.17 Replacement of Expansion Joints complete as per drawings Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe 15.4 of embankment complete as per drawing and Technical specifications. Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical 15.5 specification. Construction of masonry toe wall for approach slope protection of both abutments as per technical specifications. Flexible Apron:Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. Construction of Cut off wall for bed protection with m15 grade cement concrete Providing and laying rouble stone flooring laid in cement mortar 1:3 as per drawing and technical specification laid over cement concrete bedding. Removal of existing asphaltic wearing coat comprising of 50 mm thick asphaltic concrete laid over 12 mm thick mastic asphalt including disposal with all lift and lead upto 1000m. Providing and laying in position 65 mm thick wearing coat consisting of 25mm thick layer of mastic asphalt over 40 mm bituminous concrete over deck slab after applying prime coat complete as per drawings and technical specification sections 500 and 2700 or as directed by the Engineer. Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Providing new guard post in both side of carriage way as per technical specifications. 16.18 Replacement of Damaged Concrete Railing. 16.22 Repair of RCC Railing 14.9 8.3 Unit m m3 m3 m3 m3 m3 m3 m2 m2 m3 no. m m Rate a

POOR < 30m


Amount Quantity a 0 0 2613 Remarks NA Stone pitching Filter material NA NA NA NA NA NA NA NA NA NA

1376 1115 3561 1328 4897 4901 47 1354 12073 800 2178 129 1114 611 10000

3 2 1 0 0 13 0 0 0 26 0 0 0 2 LS LS

4 489 1 819 2 797 0 0 62 569 0 0 0 20 800 0 0 0 1 222 10 000 20 000

Providing Drainage Spouts complete as per drawing and Technical specification no. Printing new letter and figures of any shade (Printing new letter and figures of any shade with synthetic enamel paint Each black or any other approved colour to give an even shade) bridge Safety measures, traffic regulation, scaffolding and other logistic arrangement for execution of works Provision for miscellaneous items not accounted for

Total Cost : 127 672 Cost of Bridge per m2 of plan area 1 514