Where life interacts with infrastructure.

Office Buildings Drains Diameters Reduced by More Than Half


This office building experienced failures with its vertical drain lines, which are located inside a chase, inside walls. Upon inspection, more than half of the pipes diameter was blocked with scale and debris build-up. The building engineer knew that the pipes had to be repaired, so he took the time to research a solution that would cause the least amount of disruption to the building. Project: Use Nu Drain to rehabilitate failing drain pipes without disrupting the office buildings tenants. Site: A 20-story office building in Los Angeles, California. System: The vertical cast iron drain stack with diameters of 3" and 4". These pipes are hidden in a chase that is located behind walls and in the ceiling. Problem: This aged, vertical drain stack experienced failures due to heavy build-up that was blocking more than half the available flow. The pipes are located in a chase, which makes the pipes difficult to access. The customer wanted to rehabilitate the pipes without disrupting the offices. Circumvention: If the customer had chosen a traditional method of repair, such as a repipe, it would have caused a lot of damage and disruption. The walls would have to be torn down and the chase would have to be opened. This would be an expensive and messy repair, which was completely avoided by choosing Nu Flows non-destructive solution. Solution: First, our Micro-Cutter removed the 2 1/2" of build-up in the drain stacks. Then, our Pull-in-Place drain liner was installed and cured, forming a seamless, protective, pipewithin-a-pipe. This innovative Nu Drain process was completed using existing access points, so there was no destruction to the chase, the walls or ceiling in order to access the pipes. The buildings tenants carried on their work day without any disruptions from Nu Flow.

The vertical drain lines in this 20-story office building had such severe build-up that more than half of the pipes diameters were blocked. Nu Flows pipe rehabilitation solution Nu Drain was used to bring the pipe lines back to their original diameters without disrupting or damaging the building.

Nu Flows no-dig, eco-friendly technology is the ideal solution for all types of commercial properties. Dont replace your failing pipes rehabilitate them with Nu Drain.

p/n 616 v1

North America: 1-800-834-9597 | International: 1-905-433-5510 info@nuflowtech.com | www.nuflowtech.com

Das könnte Ihnen auch gefallen