Sie sind auf Seite 1von 5

Hardware Inspection Report transmission/Microwave

Huawei Technologies Lanka Co. (Pvt) Ltd. Sri Lanka Airtel 2G/3G Project
Hardware Inspection Report for transmission [Microwave/MUX] equipment installation 1. General Information Near End Site ID Site Name Site Type (green field/rooftop/etc.) Tower Type (GBT/RTT/Pole/etc.) Tower height (m) Building Height (m) Item Antenna Height on tower (m) Azimuth () Polarization Antenna Size IF cable length (m) No. of grounding points 2. Equipment Specification Item No1 Equipment Description Serial Number Product Number Frequency Sub Band IP Address System date and time Other Remarks IDU No2 No 1 ODU No2 Design value Actual value Remarks Far End

NA NA

NA NA NA NA NA NA

Page 1 of 5

Hardware Inspection Report transmission/Microwave

3. Link Parameters Item Design Results Actual Results Remarks Protection Mode Link Capacity (E1/STM) TX Frequency (MHz) RX Frequency (MHz) TX Power (dBm) Rx Level system A (dBm)* Rx Level system B (dBm)* Interference Level (dBm)** <-95 dBm * Rx Level for System B applicable for SD Sites only and according to budget 3dBm of limit. ** Receive level when the other end powered off. 4. Alarms as per the NEC PNMT Item RX LEV ALM1 HIGH BER ALM1 OUTPUT LOSS on E1 TX PWR ALM1 Problem Solution Remarks

5. Results of on Site Tests

5.1. 5.1.1 5.1.2 5.1.3 5.2. 5.3. 5.3.1 5.3.2 5.4. 5.4.1 5.5. 5.5.1 5.5.2

Test Items Alarm Indication Check IDU ODU Maintenance Order wire Function Check Power shutdown Test IDU ODU Switch over Test Effectiveness Loop back Test IF Local IF Remote

Remarks

Result (Pass / Fail )

Page 2 of 5

Hardware Inspection Report transmission/Microwave

Note: Need to carry out following 5.6/5.7 tests only on request of Huawei.

Test Items Expected Value Actual Value Remarks Result (Pass / Fail ) 5.6. Actual Receive Optical Power test (applicable for Pasolink NEO only) Receive power Between the range of -8 dBm to -34 dBm 5.7.1. Link BER performance test Bit Rate Bit Error Ratio 5.7.2. G.821 Results Page ITU-T G.821 Test * G.821 Error free Secs Errored Sec Sev Errored Sec Available Time Unavailable Time 5.7.3. Alarm Results Start Common Alarm No Signal All Zeros All ones Slip Part Sync loss Results

Results

Remarks

Result (Pass / Fail )

Stop Remarks Result (Pass / Fail )

6. Hardware installation Quality check

1. Need to provide photographs separately for each of the following check item [1~20]. 2. Attach the screen shots of PNMT/PNMTj which indicates. 2.1. Frequency, Tx Power settings and receiving power. 2.2. Alarms 3. Photographs of IDU front panel and MUX front panel in which alarm indicators can be seen clearly.

Page 3 of 5

Hardware Inspection Report transmission/Microwave

1. 2. 3. 4. 5. 6. 7. 8. 9.

10. 11. 12. 13. 14. 15. 16.

Antenna mounting bracket to the pole is properly fixed with all the nuts & bolts fastened. Marker on the antenna bracket and pole. Antenna polarization adjustment. antenna water drop hole(up close, down open) ODU IF CABLE connecter, good water proof. IF cable loop on the tower near to IDU should keep inside the tower. (2m) ODU grounding, route separately with IF cable, grounding point to the tower lower than ODU. Support bar perpendicular to antenna.(for 1.2/1.8/2.4 antenna) IF cable grounding Point 1 : Near the ODU Point 2 : 90 Bend at the bottom of the tower Point 3 : Near the feeder window Point 4 : center between point 1 and 2 if the distance > 30 m Point 5 : center between point 2 and 3 if the distance > 25 m IF cable is properly laid on the ladder using cable ties/clamps. IF cable water drop bend near the feeder window and feeder window is properly sealed. 19rack, DCDB, DDF, MUX and IDU are properly and firmly installed according to the design. Power cables to the MUX and IDU are correctly connected to the breakers in the DCDB( MUX :16 A x 2 & IDU :6A ) 19rack, DCDB, MUX and IDU are correctly grounded using the proper cable and to the correct position. E1 cables are properly connected to IDU/MUX and connected to DDF according to the design (MUX/MW E1 at left site of DDF, start from TX). Extra length available for future use. Fiber cables are correctly connected (Tx/Rx) from IDU to MUX. Extra cables are kept safely. Plastic casings are used in routing fibers.

check

Remarks

17. 18.

cables route straight and neat without sharp bending. labeling are done correctly.

Page 4 of 5

Hardware Inspection Report transmission/Microwave

19. 20.

1. IDU 2. Breakers at DCDB and power cables 3. IF cable 4. E1 cables (near MUX/IDU and DDF) 5. Fibers (Tx Rx separately) ALARMS (No abnormal alarms) Head sets, MUX phone, extra fuses and connectors and other accessories are correctly installed.

Remarks:
__________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________

Checked By: Sub contractor representative Company Name Contact number Signature Inspection date Huawei Representative Huawei

Page 5 of 5